Home Traffic Information Planned Roadworks

Planned Roadworks

You'll find more information on planned roadworks on Scotland's trunk roads below. Alternatively you can view them on our map

M8 EB Jct 21 off slip - Total Closure

Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (Slip 2-Lane to T-Junction), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 EB Jct 19 off slip - Pitt St - St Vincent St - M8 WB Jct 18 on slip - M8 Jct 20 WB off slip - West St - Wallace St - M74 Jct 1 SB on slip - Diversion End

M8 EB Jct 22 off slip - Total Closure

Location:M74 (Eb Off Slip to End Of 2-Lane) to M74 (End Of 2-Lane to Start Of 1-Lane), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 EB Jct 19 off slip - Pitt St - St Vincent St - M8 WB Jct 18 on slip - M8 Jct 20 WB off slip - West St - Wallace St - M74 Jct 1 SB on slip - Diversion End

M8 EB Secondary CW link road from M77 - Total Closure

Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8) to M77 (Lhs Slip To M8 to Entry To M8), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M77 traffic will take link road and continue on M8 mainline - M8 EB Jct 19 off slip - Pitt St - St Vincent St - M8 WB Jct 18 on slip - M8 Jct 20 WB off slip - West St - Wallace St - M74 Jct 1 SB on slip - Diversion End

A1 - NB - Abbotsview off slip - Closure

Location:A1 (Haddington East Jct Start Off Slip Wb to Haddington East Jct End Off Slip Wb), Northbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
13th & 14th May
The A1 northbound will be closed at Thistly Cross Roundabout. A diversion route will be signposted between Thistly Cross Roundabout and Oaktree Junction, directing traffic via the A199.

A1 - NB - Abbotsview on slip - Closure

Location:A1 (Had'Ton E Jct Wb On Slip to Had'Ton E Jct Eb On Slip), Northbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
13th & 14th May
The A1 northbound will be closed at Thistly Cross Roundabout. A diversion route will be signposted between Thistly Cross Roundabout and Oaktree Junction, directing traffic via the A199.

A1 - NB - Gladsmuir Off-slip - Closure

Location:A1 (Gladsmuir Jct Off Slip to B6363 Roundabout Gladsmuir), Northbound

Start time:13th of June 2024, 7:30pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
Continue NB mainline to Bankton Jct., return on SB to Gladsmuir.

A1 - NB - Oaktree off slip - Closure

Location:A1 (Haddington East Jct Underbridge to Haddington West Jct Slip Road Exit) to A1 (Had'Ton W Jct Off

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
13th & 14th May
The A1 northbound will be closed at Thistly Cross Roundabout. A diversion route will be signposted between Thistly Cross Roundabout and Oaktree Junction, directing traffic via the A199.

A1 - NB - Reston - Temp Lights

Location:A1 (Jct (R) Redhall to Jct Ayton (North)) to A1 (Jct Ayton (North) to B6438 Reston), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A1 - NB - Thistly Cross to Oaktree - Closure

Location:A1 (Thistly Cross Roundabout to Thistly Cross Roundabout) to A1 (Had'Ton W Jct Off Slip to Had'Ton W

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
13th & 14th May
The A1 northbound will be closed at Thistly Cross Roundabout. A diversion route will be signposted between Thistly Cross Roundabout and Oaktree Junction, directing traffic via the A199.

A1 - NB -Lamberton to Old Craighall roundabout - Mobile Lane Closure

Location:A1 (National Boundary to South Lamberton) to A720 (Old Craighall Rbt to Old Craighall Rbt), Northbou

Start time:17th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

A1 - SB - Old Craighall roundabout to Lamberton - Mobile Lane Closure

Location:A1 (Old Craighall to End On Slip From A720) to A1 (South Lamberton Sb to National Boundary), Southbo

Start time:17th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

A1 - SB - Reston - Temp Lights

Location:A1 (Jct Ayton (North) to B6438 Reston) to A1 (Jct (R) Redhall to Jct Ayton (North)), Southbound

Start time:27th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A1 N/B Bankton On-slip Closure.

Location:A1 (A198 Roundabout Tranent to Bankton Jct On Slip) to A1 (Bankton Jct On Slip to Bankton Bridge), N

Start time:14th of May 2024, 7:30pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
Follow A198 to B1361 to A199 to A1

A1 N/B Bankton. Lane Closure.

Location:A1 (Bankton Jct Off Slip to Bankton Jct On Slip) to A1 (Bankton Jct On Slip to Bankton Bridge), Nort

Start time:14th of May 2024, 9:30pm

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure (30mph)

A1 N/B Grantshouse. Road Closure.

Location:A1 (End Dual Carriageway Houndwood to A6112 Junction To Duns), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
At Ayton take right on to the A1107 (junction south of
Eyemouth) - follow the A1107 northbound for approx. 13 miles, passing
Eyemouth and Coldingham then over Coldingham Moor, until A1107 re-joins the A1 south of Cockburnspath.

A1 N/B Innerwick. Temporary Traffic Lights.

Location:A1 (Start Of Dual Carriageway to A1087 Junction), Northbound

Start time:10th of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A1 N/B Lamberton. Road Closure

Location:A1 (South Lamberton to End Dual Nb), Northbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
Leave A1 at Berwick-upon-Tweed on A6105 to Chirnside then take B6355 to A1

A1 N/B Old Craighall Lane Closure.

Location:A1 (Cowpits Rd Br to Start Off Slip To A720), Northbound

Start time:15th of May 2024, 9:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure.

A1 N/B Old Craighall Off-slip Closure.

Location:A1 (Cowpits Rd Br to Start Off Slip To A720) to A1 (Start Off Slip To A720 to Old Craighall Rbt), No

Start time:15th of May 2024, 9:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
Exit A1 at Dalkeith A6094 to A68 to A720

A1 S/B Grantshouse. Road Closure.

Location:A1 (End Dual Carriageway Houndwood to A6112 Junction To Duns), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
Closure of A1 at the A1107 junction - leave the A1 by taking left onto the
A1107 (Coldingham Moor) road approx 1½ miles south of Cockburnspath. -
Continue on the A1107 for approx. 13 miles, through Coldingham then
bypassing Eyemouth, to junction east of Ayton to re-join the A1.

A1-NB- West of Monksmuir- Closure

Location:A1 (Overhailes Underpass to Beanston Underbridge) to A1 (Stevenson Road Overbridge to Haddington Eas

Start time:17th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A1 northbound will be closed at Thistly Cross Roundabout. A diversion route will be signposted between Thistly Cross Roundabout and Abbotsview Junction, directing traffic via the A199.

A1-NB-Noth of Grantshouse- Closure

Location:A1 (Jct Blackburn Farm to Start Dual C/Way) to A1 (Start Dual C/Way to A1107 Jct To Eyemouth), North

Start time:10th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A1 northbound will be closed 2 miles north of Grantshouse. A diversion will be in place between Eyemouth Junction and Tower Farm via the A1107 through Eyemouth, Coldingham and Old Cambus.

A1-SB-Noth of Grantshouse- Closure

Location:A1 (A1107 Junction to End Dual C/Way S/B), Southbound

Start time:10th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A1 northbound will be closed 2 miles north of Grantshouse. A diversion will be in place between Eyemouth Junction and Tower Farm via the A1107 through Eyemouth, Coldingham and Old Cambus.haha you

A68 - NB - Camptown - Sign placement

Location:A68 (Junction Lethem to C31 Falside), Northbound

Start time:16th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A68 - NB - Pathhead - Temp lights

Location:A68 (N End Of Hope Imp to Whippielaw E F/Way) to A68 (Whippielaw E F/Way to B6367 Preston Rd), North

Start time:10th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A68 - NB - South of Charlesfield - Closure

Location:A68 (C66 Sandystones to C52 Longnewton) to A68 (C52 Longnewton to A699 Selkirk), Northbound

Start time:29th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A68 will be closed in both directions with a diversion in place between Bonjedward and St Boswells. Traffic will be diverted via the A698 to Kelso, and will then follow the A699 to St Boswells.

A68 - SB - Camptown - Sign placement

Location:A68 (Junction Lethem to C31 Falside) to A68 (C31 Falside to C35 Chesters), Southbound

Start time:16th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A68 - SB - Pathhead - Temp lights

Location:A68 (Whippielaw E F/Way to B6367 Preston Rd) to A68 (N End Of Hope Imp to Whippielaw E F/Way), South

Start time:10th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A68 - SB - South of Charlesfield - Closure

Location:A68 (C66 Sandystones to C52 Longnewton), Southbound

Start time:29th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A68 will be closed in both directions with a diversion in place between Bonjedward and St Boswells. Traffic will be diverted via the A698 to Kelso, and will then follow the A699 to St Boswells.

A68 N/B 3 miles south of Lauder. Temporary Traffic Lights.

Location:A68 (Jct South Blainslie to C76 Middle Blainslie), Northbound

Start time:3rd of June 2024, 6:30am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A68 N/B Jedburgh. Temporary Traffic lights

Location:A68 (Waterside Road to Station Bridge), Northbound

Start time:7th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A68 N/B Soutra Hill. Temporary Traffic Lights.

Location:A68 (Huntershall Jct to End Of Sb Climbing Lane), Northbound

Start time:3rd of June 2024, 8:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A68 S/B 3 miles south of Lauder. Temporary Traffic Lights.

Location:A68 (Jct South Blainslie to C76 Middle Blainslie), Southbound

Start time:3rd of June 2024, 6:30am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A68 S/B Camptown. Verge Signage.

Location:A68 (C31 Falside to C35 Chesters) to A68 (Junction Lethem to C31 Falside), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A68 S/B Jedburgh. Temporary Traffic lights

Location:A68 (Waterside Road to Station Bridge), Southbound

Start time:7th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A68 S/B Soutra Hill. Temporary Traffic Lights.

Location:A68 (Huntershall Jct to End Of Sb Climbing Lane), Southbound

Start time:3rd of June 2024, 8:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A68- NB- South of Teviothead- Closure

Location:A7 (Mosspaul Hotel to Carlenrig), Northbound

Start time:6th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions at Arkleton. A diversion will be in place between Canonbie and Hawick via the B6357 to Bonchester Bridge, then the A6088 and A698 to Hawick.

A68- SB- South of Teviothead- Closure

Location:A7 (Mosspaul Hotel to Carlenrig), Southbound

Start time:6th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions at Arkleton. A diversion will be in place between Canonbie and Hawick via the B6357 to Bonchester Bridge, then the A6088 and A698 to Hawick.

A68-NB-Newton St Boswells-Closure

Location:A68 (B6404 St.Boswells to St.Of Island (B6398)) to A68 (End Of Isl.(B6398) to St. Of Isl.(A6091)), N

Start time:3rd of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A68 will be closed in both directions with a diversion in place between St Boswells and Ravenswood Roundabout. Traffic will be diverted via the A699 to Selkirk, then the A7 to Kingsknowe Roundabout, and then via the A6091 to Ravenswood Roundabout.

A68-SB-Newton St Boswells-Closure

Location:A68 (End Of Isl.(B6398) to St. Of Isl.(A6091)) to A68 (B6404 St.Boswells to St.Of Island (B6398)), S

Start time:3rd of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A68 will be closed in both directions with a diversion in place between St Boswells and Ravenswood Roundabout. Traffic will be diverted via the A699 to Selkirk, then the A7 to Kingsknowe Roundabout, and then via the A6091 to Ravenswood Roundabout.

A7 - NB - Commercial Road - Temp Lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound

Start time:10th of June 2024, 9:30am

Description:Works:
Pedestrian Crossing works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - NB - Kingsknowe Rbt to Selkirk - Closure

Location:A7 (B6360 Abbotsford to B7060 Caddonfoot) to A7 (Netherbarns to A6091 Rbt), Southbound

Start time:11th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions. A diversion will be in place between Selkirk and Kingsknowe Roundabout via the A699 to St Boswells, the A68 to Ravenswood Roundabout and then the A6091 to Kingsknowe Roundabout

A7 - SB - Commercial Road - Temp Lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound

Start time:10th of June 2024, 9:30am

Description:Works:
Pedestrian Crossing works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - SB - Kingsknowe Rbt to Selkirk - Closure

Location:A7 (Netherbarns to A6091 Rbt) to A7 (B6360 Abbotsford to B7060 Caddonfoot), Southbound

Start time:11th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions. A diversion will be in place between Selkirk and Kingsknowe Roundabout via the A699 to St Boswells, the A68 to Ravenswood Roundabout and then the A6091 to Kingsknowe Roundabout

A7 N/B Braxholm. Stop/Go Boards.

Location:A7 (Southfield to B711 Roberton), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Give and Take Traffic Control.

A7 N/B Langholm. Stop/Go Boards.

Location:A7 (Rhs Jct Langholm to B709 Jct), Northbound

Start time:10th of May 2024, 4:00pm

Description:Works:
Drainage Works

Traffic Management:
Stop/Go Boards Traffic Control.

A7 N/B Selkirk at High Street. Closure.

Location:A7 (C21 High Street to A707 West Port), Northbound

Start time:26th of May 2024, 9:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Follow A7 southbound, turning left on to the A699 and then left on to the A68 at St Boswells. Turn left on to the A6091 at Ravenswood Roundabout to the A7 at Kingsknowe roundabout.

A7 S/B Braxholm. Stop/Go Boards.

Location:A7 (Southfield to B711 Roberton), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Give and Take Traffic Control.

A7 S/B Langholm. Stop/Go Boards.

Location:A7 (Rhs Jct Langholm to B709 Jct), Southbound

Start time:10th of May 2024, 4:00pm

Description:Works:
Drainage Works

Traffic Management:
Stop/Go Boards Traffic Control.

A7 S/B Selkirk at High Street. Closure.

Location:A7 (C21 High Street to A707 West Port), Southbound

Start time:26th of May 2024, 9:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:

Follow A7 north to Kingsknowe roundabout, take the A6091 exit until Ravenswood Roundabout, take the A68 exit and continue down past St Boswells and take a right onto the A699 and follow until the A7.

A7 at Ashkirk. Stop/Go Boards.

Location:A7 (Jct Synton Parkhead to B6400 Lilliesleaf), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A7 at Ashkirk. Stop/Go Boards.

Location:A7 (Jct Synton Parkhead to B6400 Lilliesleaf), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A7-NB-Ashkirk- closure

Location:A7 (B7060 Caddonfoot to Netherbarns) to A7 (Netherbarns to A6091 Rbt), Northbound

Start time:10th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions South of Ashkirk. A diversion will be in place between Hawick and Selkirk via the A698 to Bonjedward, the A68 to St Boswells and then the A699 to Selkirk.

A7-SB-Ashkirk- closure

Location:A7 (Netherbarns to A6091 Rbt) to A7 (B7060 Caddonfoot to Netherbarns), Southbound

Start time:10th of June 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions South of Ashkirk. A diversion will be in place between Hawick and Selkirk via the A698 to Bonjedward, the A68 to St Boswells and then the A699 to Selkirk.

A701 NB at Locharbriggs - TTLS

Location:A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry Road) to A701 (Jct Rashgillpark to Jct Catherinefield),

Start time:14th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A701 NB from St Ann's to Parkgate - Progressive TTLS

Location:A701 (Ae Bridgend to Wester Parkgate) to A701 (Jct Hartfield to Jct Chapelhill), Northbound

Start time:17th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A701 SB At SRUC Barony Campus Parkgate - No obstruction on C/W or F/W

Location:A701 (Ae Bridgend to Wester Parkgate), Southbound

Start time:1st of June 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A701 SB at Locharbriggs - TTLS

Location:A701 (Jct Rashgillpark to Jct Catherinefield) to A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry Road),

Start time:14th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A701 SB from St Ann's to Parkgate - Progressive TTLS

Location:A701 (Jct Hartfield to Jct Chapelhill) to A701 (Ae Bridgend to Wester Parkgate), Southbound

Start time:17th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A701 from B7076 Broomlands Beattock NB - TTLs

Location:A701 (Jct Beattock to B7076 Junction) to A701 (B7076 Junction to Beattock West Rbt), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Pavement Surveys

Traffic Management:
Portable Traffic Lights (TTLS).

A701 from B7076 Broomlands Beattock SB - TTLs

Location:A701 (B7076 Junction to Beattock West Rbt) to A701 (Jct Beattock to B7076 Junction), Southbound

Start time:20th of May 2024, 9:30am

Description:Works:
Pavement Surveys

Traffic Management:
Portable Traffic Lights (TTLS).

A702 N/B Damhead to Hillend. Road Closure

Location:A702 (C40 Bushloan Road to A703 Peebles Road) to A702 (40mph Signs to Sth Rbt A720), Northbound

Start time:28th of May 2024, 8:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Exit A702 N/B at Howgate onto Old Bush Loan. Take the 1st exit at Gowkley Moss roundabout onto the A701 N/B to Straiton Jct and join the A720.

A702 N/B at Nine Mile Burn. Road Closure.

Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (U71 Glencorse Kirk Rd to C40 Bushloan Road), Nort

Start time:27th of May 2024, 8:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Exit the A702 NB at Nine Mile Burn onto the A766, A701 and follow Bush Loan Road before re-joining A702 NB at Easter Howgate.

A702 N/B at Silverburn. Road Closure.

Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (C57 Silverburn Rd to Jct Grange Dell), Northbound

Start time:27th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Take A766 Carlops Road to A701 then take Bush Loan Road before re-joining the A702.

A702 S/B Hillend to Damhead. Road Closure

Location:A702 (40mph Signs to Sth Rbt A720) to A702 (C40 Bushloan Road to A703 Peebles Road), Southbound

Start time:28th of May 2024, 8:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Continue A720 E/B, exit at Straiton Jct follow A701 S/B to Gowkley Moss Roundabout. Take 3rd exit onto Bush Loan Road and continue to A702 at Howgate.

A702 S/B at Easter Howgate. Road Closure.

Location:A702 (C40 Bushloan Road to A703 Peebles Road) to A702 (A766 Penicuik to C57 Silverburn Rd), Southbou

Start time:27th of May 2024, 8:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
At Easter Howgate take the exit onto Bush Loan Road then follow the A701 and A766 before re-joining A702 SB

A702 S/B at Silverburn. Road Closure.

Location:A702 (C57 Silverburn Rd to Jct Grange Dell) to A702 (A766 Penicuik to C57 Silverburn Rd), Southbound

Start time:27th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Take Bush Loan Road to A701 and then A766 Carlops Road before re-joining the A702.

A7071 Freeflow on-slip to M74 northbound - Total closure

Location:A725 (Whistleberry Toll Rbt to Raith Rbt) to M74 (B7012 Rbt to Entry M74 Nb), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Jct 5 On-slip.

A7071 Northbound - Nearside lane closure

Location:A725 (Craigend to M8 Ppp Boundary) to A725 (Whistleberry Toll Rbt to Raith Rbt), Northbound

Start time:2nd of June 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A7071 Southbound - Nearside lane closure

Location:A725 (Whistleberry Toll Rbt to Raith Rbt) to A725 (Craigend to M8 Ppp Boundary), Southbound

Start time:2nd of June 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A720 - EB - Gogar to Old Craighall - Mobile Lane Closure

Location:Off Network to A720 (Sheriffhall Rbt to Old Craighall Jct Rbt), Eastbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

A720 - WB - Dreghorn to Gogar- Closure

Location:A720 (Start Wb Slip To Dreghorn Link Rd to Eastbound Slip) to A720 (S Of Calder Jct to S Of M8 Ext J

Start time:13th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Dreghorn Jct - Dreghorn Link - B701 Redford Rd - B701 Gillespie Rd - B701 Wester Hailes Rd - A71 Calder Rd - Calder Jct.
Once you re-join at Caulder jct you can use the link road to get to Gogar rbt or the slip road to access the M8

A720 - WB - Lothianburn onslip to Dreghorn off slip - Closure

Location:A720 (Start Wb Slip From A702 to W Of Loth'Burn Jct) to A720 (Start Wb Slip To Dreghorn Link Rd to D

Start time:12th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

A720 - WB - Lothianburn to Dreghorn - Closure

Location:A720 (E Of Loth'Burn Jct to W Of Loth'Burn Jct) to A720 (Start Wb Slip To Dreghorn Link Rd to Eastbo

Start time:12th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Lothianburn Jct - A702 - B701 Hunter Tryst - Dreghorn Link - Dreghorn Jct

A720 - WB - Old Craighall to Gogar - Mobile Lane Closure

Location:A720 (Old Craighall Rbt to Sheriffhall Rbt) to Off Network, Westbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

A720- WB - Straiton on slip- Lothianburn - Closure

Location:A720 (Straiton Rd to W Of Straiton Rd Jct) to A720 (W Of Straiton Rd Jct to E Lothianburn Jct), West

Start time:10th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Straiton Jct - A701 Burdiehouse Rd - B701 Frogston Rd - A702 - Lothianburn Jct

A720- WB - Straiton- Lothianburn - Closure

Location:A720 (E Straiton Rd Jct to W Of Straiton Rd Jct) to A720 (E Of Loth'Burn Jct to W Of Loth'Burn Jct),

Start time:10th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Straiton Jct - A701 Burdiehouse Rd - B701 Frogston Rd - A702 - Lothianburn Jct

A721 Southbound to M74 Southbound - total closure

Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M74 (Blantype Farm Rd O/B to Fallside Rd O/B), Southb

Start time:12th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A721, M74 NB Jct 3A, M74 NB Jct 2a Offslip, M74 SB Jct 2a Onslip.

A721 Southbound to M74 southbound on-slip - Total closure

Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou

Start time:3rd of June 2024, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
A721, M74 NB Jct 3A On-slip, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip. A721 On-slip to M74 SB

A721 on-slip to M74 Southbound - Total closure

Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou

Start time:3rd of June 2024, 8:00pm

Description:Works:
High Friction Works

Traffic Management:
Road Closure.

Diversion Information:
A721 Westbound, M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip, M74 Southbound

A725 East Kilbride Expressway prior to Glasgow Rd onslip WB - Lane Closure

Location:A725 (Off Slip Whitehill to Wb Slip On From A724) to A725 (A724 On Slip to Main St Off Slip), Westbo

Start time:23rd of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A725 Bellziehill Junction to Diamond Junction - Nearside lane closure

Location:A725 (Benziehill Int Off-Slip to Diamond Int. O/B), Northbound

Start time:19th of May 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A725 EB Blantyre to East Kilbride - Route Part of Diversion

Location:A726 (Birniehill Rbt to Birniehill Rbt) to A725 (Start Off Slip To Main St to Main St Rbt), Westboun

Start time:12th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 EB E Kilbride Expy at Blantyre - Route Part of Diversion

Location:A725 (Main Street Rbt to Slip To A725) to A725 (M8 Ppp Boundary to Whistleberry Roundabout), Eastbou

Start time:16th of May 2024, 8:00pm

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 EB Kingsway Lane Closures

Location:A725 (Birniehill Rbt to Whitemoss Rbt) to A725 (Whitemoss Rbt to Whirlies Rbt), Eastbound

Start time:12th of May 2024, 8:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 East Kilbride Expressway @ Whistleberry offslip EB - Lane Closure

Location:A725 (Main St On Slip to Glasgow Rd On Slip) to A725 (Off Slip To Craighead to On Slip From Craighea

Start time:23rd of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A725 East Kilbride Expressway, Bothwell Bridge NB - Advanced Signage for Road Closure

Location:A725 (Craighead On Slip to M8 Ppp Boundary) to A725 (Craigend to M8 Ppp Boundary), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 Glasgow Rd onslip EB - Total Closure

Location:A725 (Eb Slip From Sb Glasgow Rd to Start Slip To A725) to A725 (Start Slip To A725 to End Slip), Ea

Start time:23rd of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
follow diversion -

A724 Glasgow Rd - Glasgow Rd onslip WB to A725 - Continue on A725 WB then leave at Main St Rbt - Rejoin A725 EB from Main St

end

A725 N/B East Kilbride Expressway A724 to Whisteberry N/S Lane Closure

Location:A725 (Main St On Slip to Glasgow Rd On Slip) to A725 (Off Slip To Craighead to On Slip From Craighea

Start time:13th of May 2024, 8:00pm

Description:Works:
Lighting Works, Sign Installation/Repairs

Traffic Management:
Lane Closure.

A725 NB Bothwell Bridge - Advanced Signage

Location:A725 (Craighead On Slip to M8 Ppp Boundary) to A725 (Craigend to M8 Ppp Boundary), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 NB C154 Stoneymeadow Rd onslip to A725 - Road closure

Location:A725 (Whirlies Rbt to Whirlies Bypass), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow stoneymeadow rd- join A725 south- at mavor rbt circle rbt and join A725 north- end

A725 NB Craighead off slip - Slip closure

Location:A725 (Off Slip To Craighead to On Slip From Craighead) to A725 (Off Slip To Craighead to End Island)

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A|725 north- circle raith rbt and head A725 south- leave A725 at whistlebrae rd- end

A725 NB Craighead on slip - Slip closure

Location:A725 (End Island to On Slip From Craighead) to A725 (Off Slip To Craighead to On Slip From Craighead

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue onto whistlebrae rd- at jct take right turn- at rbt take 2nd exit onto A725 south- at maver rbt circle and rejoin A725 north- end

A725 NB Douglas st off slip - Slip closure

Location:A725 (Eb Off Slip to B7012 Jct) to A725 (B7012 Jct to B7012 T Junction), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A725 north to raith rb circle Raith rbt and join A725 north- follow A725 leaving at douglas st rbt- take 2nd exit onto B7012 douglas st- end

A725 NB Douglas st on slip - Slip closure

Location:A725 (B7012 Jct to B7012 T Junction) to A725 (Eb Off Slip to B7012 On Slip), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue douglas st- at rbt take 2nd exit onto A725 south- at maver rbt cirlce rbt and join A725 north- end

A725 NB E Kilbride Expy Whirlies to Mavor merge - Road closure

Location:A725 (Whirlies Rbt to Whirlies Bypass), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue A749 kingsway- join A725 at Maver rbt

A725 NB Glasgow rd on slip - Slip closure

Location:A725 (Start Slip To A725 to End Slip) to A725 (Main St On Slip to Glasgow Rd On Slip), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A724 to rbt- at rbt 4th exit onto A725 south- at mavour rbt circle and rejoin A725 north- end

A725 NB Hamilton rd off slip - Slip closure

Location:A725 (Crossbaskets Off Slip to Blantyre Slip) to A725 (Eb Off Slip to Crossbaskets Jct), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A725 north to raith rb circle Raith rbt and join A725 north- follow A725 leaving at douglas st rbt- take 2nd exit onto B7012 Hamilton rd- end

A725 NB Main St off slip - Slip closure

Location:A725 (Start Off Slip To Main St to Main St Rbt), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A725 north to raith rb circle Raith rbt and join A725 north- follow A725 leaving at main st rbt- end

A725 NB Main St on slip - Slip closure

Location:A725 (Main Street Rbt to Slip To A725), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue Main st rbt and take 2nd exit onto A725 south- at maver rbt circle and rejoin A725 north- end

A725 NB Mavor to Whirlies merge -Lane closure

Location:A725 (A749 Rbt to Entry Slip Calderwood), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 NB Onslip from A724 Glasgow Road - Closure

Location:A725 (Start Slip To A725 to End Slip) to A725 (Glasgow Rd On Slip to Craighead Off Slip), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lighting Works, Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
Traffic wishing to join the A725 at Glasgow Road (A7624 onslip) will be directed south on A724 Glasgow Road, taking the second exit onto B7012 Whistleberry Road turning left onto A725 E\B Whistleberry onslip where the diversion ends.

A725 NB Whirlies merge to Bothwell bridge - Lane closure

Location:A725 (Whirlies Bypass to Hamilton Rd Off Slip) to A725 (Craigend to M8 Ppp Boundary), Northbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 NB Whistleberry Offslip- Closure

Location:A725 (Off Slip To Craighead to On Slip From Craighead) to A725 (Off Slip To Craighead to End Island)

Start time:13th of May 2024, 8:00pm

Description:Works:
Lighting Works, Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
A737 EB traffic wishing to exit at Whistleberry offslip will continue eastbound to Bellshill roundabout where they will be directed around the roundabout to head W/B on the A725 and continue to W/B Whistleberry offslip with the diversion ending onto B7012 Whistleberry Road.

A725 Northbound Bellziehill on-slip - Total closure

Location:A725 (Bellziehill Rbt to On Slip From Bellziehill (Eb)) to A725 (Benziehill Int Off-Slip to Diamond

Start time:19th of May 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

Diversion Information:
A725 Bellziehill SB On-slip, A725 Orbiston Southbound Off-slip, A725 Orbiton Northbound on-slip.

A725 Northbound Bellziehill on-slip -Total closure

Location:A725 (Bellziehill Rbt to On Slip From Bellziehill (Eb)), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Parapet Repairs

Traffic Management:
Road Closure.

Diversion Information:
A721 Gartcosh Walk, B7070 North Road

A725 Northbound Diamond off-slip - Total closure

Location:A725 (Eb Off Slip Diamond Int to Diamond Int Crossrds), Northbound

Start time:19th of May 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
A725 northbound strathclyde buisness park off-slip

A725 Northbound Diamond off-slip - Total closure

Location:A725 (Eb Off Slip Diamond Int to Diamond Int Crossrds), Northbound

Start time:9th of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A725 northbound strathclyde buisness park offslip

A725 Northbound Mainline Bothwell - Total Closure

Location:A725 (Whistleberry Toll Rbt to Whistleberry Toll Rbt) to A725 (Benziehill Int Off-Slip to Diamond In

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Non-Motorway Diversion - Bellshill Bypass, B7071 Uddingston Road, B7071 Bothwell Road, B7071 Glasgow Road, A721 New Edinburgh Road, Bellziehill roundabout.

Motorway Diversion - Bellshill Bypass, M74 Northbound Junction 5 on-slip, M74 Northbound to M73 Northbound Link Road, Baillieston Roundabout, Swinton Roundabout, Bargeddie Roundabout, A8 Eastbound, A8 Eastbound Shawhead Junction.

A725 Northbound Orbiston on-slip -Total Closure

Location:A725 (Start Of Slip to Jct Orbiston Rbt) to A725 (Derest Doune Nth to On Slip), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Hamilton Road, Crossgates, A721 Motherwell Road, Calder Road, A775 Main Street, A755 Campbell Street, A721 Gartcosh Walk, Bellziehill roundabout

A725 Northbound Raith Main line total closure

Location:A725 (Raith Rbt to Whistleberry Toll Rbt) to A725 (Start 2 Lane to Diamond Int. O/B), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M74 Junction 5 on-slip Northbound, M74 to M73 Northbound Link road, M73 NB Jct 2 off-slip, Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 Eastbound.

A725 Northbound Raith Underpass Progressive Nearside & offside lane closures

Location:A725 (M8 Ppp Boundary to Whistleberry Roundabout) to A725 (Raith Rbt to Off Slip Orbiston Int), Nort

Start time:16th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A725 Northbound Raith on-slip - Total Closure

Location:A725 (Raith Rbt to Raith Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Non-Motorway Diversion - Bellshill Bypass, B7071 Uddingston Road, B7071 Bothwell Road, B7071 Glasgow Road, A721 New Edinburgh Road, Bellziehill roundabout.

Motorway Diversion - M74 Northbound Junction 5 on-slip, M74 Northbound to M73 Northbound Link Road, Baillieston Roundabout, Swinton Roundabout, Bargeddie Roundabout, A8 Eastbound, A8 Eastbound Shawhead Junction.

A725 Northbound Strathclyde Business Park on-slip- Total closure

Location:A725 (Diamond Int Crossrds to Eb On Slip Diamond Int) to A725 (Exit Slip Nosing to End Of Dual), Nor

Start time:29th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Phoenix Crescent, James Street, Belgrave Street, A721 Gartcosh Walk, B7070 North Road

A725 Northbound To M8 Eastbound Link road - Total closure

Location:A725 (Exit Slip Nosing to End Of Dual) to A725 (Start 2 Lane to Diamond Int. O/B), Eastbound

Start time:5th of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A725 Northbound, A725 NB Shawhead on-slip Eastbound, A8 Eastbound to M8 Merge Junction 6

A725 Orbiston on-slip total closure Northbound

Location:A725 (Start Of Slip to Jct Orbiston Rbt) to A725 (Derest Doune Nth to On Slip), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
B7070 Hamilton Road, Cross gates, A721, Calder Road, A775 Campbell Street, B7070 North Road.

A725 Raith Roundabout - Inner ring closure becoming outer ring closure to A7071

Location:A725 (Raith Rbt to Raith Rbt) to A725 (Whistleberry Toll Rbt to Raith Rbt), Northbound

Start time:26th of May 2024, 6:00am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A725 Raith on-slip Northbound total closure

Location:A725 (Raith Rbt to Raith Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Raith Rbt, M74 Junction 5 on-slip Northbound, M74 to M73 Northbound Link road, M73 NB Jct 2 off-slip, Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 Eastbound.

A725 SB East Kilbride Expressway @ Whirlies off slip - Slip Closure

Location:A725 (Crossbaskets Jct to Whirlies Bypass) to A725 (Whirlies Rbt to Whirlies Rbt), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A725 to Mavor Rbt - take 1st exit onto Kingsway- end

A725 SB Douglas Street off slip - Slip Closure

Location:A725 (Wb Off Slip to Eb On Slip) to A725 (Wb Off Slip to Newhouse Rbt), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A725 south to Maver Rbt- circle rbt and rejoin A725 north- leave A725 at Douglas St- end

A725 SB Douglas Street on slip - Slip Closure

Location:A725 (Lhs Jct Newhouse to End Wb On Slip), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on douglas st- join A725 north- at Raith rbt circle and rejoin |A725 south- end

A725 SB Glasgow Rd on slip - Slip Closure

Location:A725 (A724 Rbt to Wb A725 On Slip), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A724- join A725 north- circle Raith Rbt and take exit for A725 south- end

A725 SB Main Street off slip - Slip Closure

Location:A725 (Off Slip To Main St to Main Street Rbt), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A725 south to Maver Rbt- circle Maver Rbt and continue A725 north- leave A725 at Main St off slip- end

A725 SB Main Street on slip - Slip Closure

Location:A725 (Main Street Rbt to Start On Slip), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on B7012- join A725 n/b- circle Raith rbt and rejoin A725 south- end

A725 SB Whirlies Bypass to Whim Place on slip - Lane Closure

Location:A725 (Crossbaskets Jct to Whirlies Bypass) to A725 (Entry Slip Calderwood to A749 Rbt), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 SB Whistleberry Rd off slip - Slip Closure

Location:A725 (Off Slip Whitehill to Wb Slip On From A724) to A725 (Wb Off Slip to Whistleberry Rd), Southbou

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A725 south to Maver Rbt - circle rbt and head on A725 north - leave A725 at Craighead off slip- follow rd to Whistleberry Rd- end

A725 SB Whistleberry to Whirlies slip - Lane Closure

Location:A725 (M8 Ppp Boundary to Whistleberry Road Slip) to A725 (Crossbaskets Jct to Whirlies Bypass), Sout

Start time:22nd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 Soutbound Raith off-slip - Total closure

Location:A725 (On Slip Orbiston Int to Raith Rbt) to A725 (Raith Rbt to Raith Rbt), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A725 Southbound, A725 Main Street off-slip, A725 Main Street on-slip Northbound

A725 Southbound Bellziehill on-slip - Total closure

Location:A725 (Bellziehill Rbt to On Slip Ftom Bellziehill), Southbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A721 New Edinburgh Road, A74 Glasgow road, A721 Glasgow road.

A725 Southbound Bellziehill on-slip -Total Closure

Location:A725 (Bellziehill Rbt to On Slip Ftom Bellziehill), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Motorway Diversion - A721 New Edinburgh Road Westbound, A74 Glasgow Road, A721 Glasgow Road, M74 Southbound.

Non Motorway Diversion - A721 New Edinburgh Road Westbound, B7071 Glasgow Road, B7071 Bothwell Road, B7071 Uddingston Road, B7071 Hamilton Road.

A725 Southbound Diamond on-slip - total closure

Location:A725 (Diamond Int Crossrds to Wb On Slip) to A725 (Diamond Int. Ob to Benziehill Int On-Slip), South

Start time:30th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Belgrave Street, A721 Gartcosh Walk, A721 New Edinburgh Road, A74 Glasgow road, A721 Glasgow road.

A725 Southbound Main line - Total closure

Location:A725 (Start 2 Lane to Diamond Int. O/B) to A725 (M8 Ppp Boundary to Whistleberry Road Slip), Southbo

Start time:30th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
North Road, A721 Gartcosh Walk, A721 New Edinburgh Road, A74 Glasgow road, A721 Glasgow road.

A725 Southbound Orbiston on-slip - Total Closure

Location:A725 (Orbiston Rbt to Wb On Slip) to A725 (Wb Off Slip Orbiston Int to Wb On Slip), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Motorway Diversion - A725 Northbound Orbiston on-slip, A725 Northbound Bellziehill off-slip, A721 New Edinburgh Road Westbound, A74 Glasgow Road, A721 Glasgow Road, M74 Southbound.

Non Motorway Diversion - A725 Northbound Orbiston on-slip, A725 Northbound Bellziehill off-slip, A721 New Edinburgh Road Westbound, B7071 Glasgow Road, B7071 Bothwell Road, B7071 Uddingston Road, B7071 Hamilton Road.

A725 Southbound Orbiston on-slip - Total Closure

Location:A725 (Orbiston Rbt to Wb On Slip) to A725 (Wb Off Slip Orbiston Int to Wb On Slip), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A725 Orbiston Northbound on slip, A725 Bellziehill Northbound off slip, A725 Bellziehill Southbound on slip.

A725 Southbound Raith Underpass Progressive Nearside & offside lane closures

Location:A725 (On Slip Orbiston Int to Raith Rbt) to A725 (Whistleberry Rbt to M8 Ppp Boundary), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A725 Southbound main line at Bellziehill - Total Closure

Location:A725 (Diamond Int. Ob to Benziehill Int On-Slip) to A725 (Whistleberry Rbt to M8 Ppp Boundary), Sout

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Motorway Diversion - A725 SB Bellziehill off-slip, A721 New Edinburgh Road Westbound, A74 Glasgow Road, A721 Glasgow Road, M74 Southbound.

Non Motorway Diversion - 725 SB Bellziehill off-slip, A721 New Edinburgh Road Westbound, B7071 Glasgow Road, B7071 Bothwell Road, B7071 Uddingston Road, B7071 Hamilton Road.

A725 WB Blantyre to East Kilbride - Route Part of Diversion

Location:A725 (A724 Rbt to Wb A725 On Slip) to A726 (Birniehill Rbt to Birniehill Rbt), Westbound

Start time:12th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 WB E Kilbride Expy at Blantyre - Route Part of Diversion

Location:A725 (Whistleberry Rbt to M8 Ppp Boundary) to A725 (Off Slip To Main St to Main Street Rbt), Westbou

Start time:16th of May 2024, 8:00pm

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A725 WB Kingsway Lane Closures

Location:A725 (Whirlies Rbt to Whirlies Rbt) to A725 (Whitemoss Rbt to Birniehill Rbt), Westbound

Start time:12th of May 2024, 8:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A725 southbound Orbiston on-slip - Total closure

Location:A725 (Orbiston Rbt to Wb On Slip), Southbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A725 Northbound Orbiston on-slip, A725 Northbound Bellziehill off-slip, A721 New Edinburgh Road, A74 Glasgow road, A721 Glasgow road.

A726 EB Queensway Lane Closure

Location:A726 (Slip On Phillipshill Interchange to West Mains Roundabout) to A726 (Murray Rbt to Birniehill R

Start time:12th of May 2024, 8:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Holehouse to Philipshill - lane closure

Location:A726 (Glasgow Road Roundabout to Redwood Drive Underbridge) to A726 (Redwood Drive Underbridge to Ph

Start time:15th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Holehouse to Philipshill - lane closure

Location:A726 (Glasgow Road Roundabout to Redwood Drive Underbridge) to A726 (Redwood Drive Underbridge to Ph

Start time:16th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Humbie road to Holehouse - lane closure

Location:A726 (Mearns Road Overbridge to B767 Glasgow Road Rbt) to A726 (Glasgow Road Roundabout to Redwood D

Start time:14th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Humbie road to Holehouse - lane closure

Location:A726 (Mearns Road Overbridge to B767 Glasgow Road Rbt) to A726 (Glasgow Road Roundabout to Redwood D

Start time:17th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Humbie road to Maidenhill

Location:A726 (B767 Glasgow Road Rbt to Mearns Road Overbridge) to A726 (Mearns Road Overbridge to Maidenhill

Start time:10th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Maidenhill to Humbie road - lane closure

Location:A726 (Maidenhill Roundabout to Mearns Road Overbridge) to A726 (Mearns Road Overbridge to B767 Glasg

Start time:13th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 GSO - Philipshill - Lane closure

Location:A726 (Phillipshill Roundabout to Phillipshill Roundabout) to A726 (Phillipshill Interchange to Redwo

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A726 GSO - Philipshill to Holehouse - lane closure

Location:A726 (Phillipshill Interchange to Redwood Drive Underbridge) to A726 (Redwood Drive Underbridge to G

Start time:16th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 WB Queensway Lane Closure

Location:A726 (Birniehill Rbt to Murray Rbt) to A726 (West Mains Roundabout to Slip Off Phillipshill Intercha

Start time:12th of May 2024, 8:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A726 WB Queensway Lane Closure

Location:A726 (Righead Rbt to Eaglesham Rbt) to A726 (Eaglesham Rd Rbt to Righead Rbt), Westbound

Start time:15th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A726GSO - Holehouse to Humbie road - lane closure

Location:A726 (Redwood Drive Underbridge to Glasgow Road Roundabout) to A726 (B767 Glasgow Road Rbt to Mearns

Start time:17th of May 2024, 10:00am

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A737 NB From Roadhead Rbt to B737 - Total Closure

Location:A737 (Bell Trees Junction to Roadhead Roundabout) to A737 (Elliston Jct to Belltrees Jct), Northboun

Start time:30th of May 2024, 10:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Total Closure – A737 Southbound
Diversion Via: Leave A737 at Linclive Interchange – A761 Linwood Road – A726 Lonend / Barrhead Road / Hurlet Road – A736 Barrhead Road – B762 Barrhead Road – Boydstone Road – Kennishead Road – A726 Nitshill Road - B773 Parkhouse Road / Darnley Road – A736 Main Street / Kelburn Street (Barrhead) – A736 Lochlibo Road – B777 – Rejoin A737 at Beith.

Total Closure – A737 Northbound
Diversion Via: Leave A737 at B777 Beith – follow southbound diversion in reverse order – Rejoin A737 at Linclive Interchange.

A737 NB Between Dalgarven and Kilwinning - TTLS

Location:A737 (Cockenzie Jct to Kilwinning 30mph Sign), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A737 NB Bypass Road Beith TTL

Location:A737 (B777 Jct to B706 Jct), Northbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A737 NB Howwood to Kilbarchan IC Road Closure

Location:A737 (End Dual Carriageway to Elliston Jct) to A737 (Start Dual Carriageway to On Slip From B787), N

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave A737 at Howwood onto B787 Beith rd- at rbt take 1st exit onto Cochranemill rd- rbt take 1srt exit onto Kilbarchan Rd- follow signs for A737 north- end

A737 NB Linclive Ic to Barrochan IC Linwood Total Closure

Location:A737 (Eb Off Slip to Eb On Slip) to A737 (Wb On Slip to Linclive Jct), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Exit Linwood EB off - Enter Linwood EB On slip

A737 NB Roadhead Rbt Lochwinnoch TTL

Location:A737 (Roadhead Rbt to Clerksbride Toll Rbt), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A737 NB approach to St James IC – Lane Closure

Location:A737 (Wb On Slip to Linclive Jct) to M8 (Barnsford Rd to 2 Way Slip), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

A737 NB to M8 EB Jct 29 – Road Closure

Location:M8 (Barnsford Rd to 2 Way Slip) to M8 (Start Of Elevated Section Eb to End Of Elevated Section Eb),

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Greenock Rd, Caledonia St, St James St, A726 Niddry St, Renfrew Rd, M8 Jct 27 EB on slip, End.

A737 SB From B787 to Roadhead Rbt - Total Closure

Location:A737 (Elliston Jct to Belltrees Jct) to A737 (Bell Trees Junction to Roadhead Roundabout), Southboun

Start time:30th of May 2024, 10:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Total Closure – A737 Southbound
Diversion Via: Leave A737 at Linclive Interchange – A761 Linwood Road – A726 Lonend / Barrhead Road / Hurlet Road – A736 Barrhead Road – B762 Barrhead Road – Boydstone Road – Kennishead Road – A726 Nitshill Road - B773 Parkhouse Road / Darnley Road – A736 Main Street / Kelburn Street (Barrhead) – A736 Lochlibo Road – B777 – Rejoin A737 at Beith.

Total Closure – A737 Northbound
Diversion Via: Leave A737 at B777 Beith – follow southbound diversion in reverse order – Rejoin A737 at Linclive Interchange.

A737 SB Between Dalgarven and Kilwinning - TTLS

Location:A737 (Cockenzie Jct to Kilwinning 30mph Sign), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A737 SB Bypass Road Beith TTL

Location:A737 (B777 Jct to B706 Jct), Southbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A737 SB Kilbarchan IC to Howwood Road Closure

Location:A737 (Off Slip To B787 to End Dual Carriageway) to A737 (End Dual Carriageway to Elliston Jct), Sout

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
at Rbt take 1st exit B787- at rbt take 2nd exit onto b787 Cochranemill rd- at Rbt take 2nd exit onto B787 Beith road- follow road to Howwood- end

A737 SB Roadhead Rbt Lochwinnoch TTL

Location:A737 (Roadhead Rbt to Clerksbride Toll Rbt), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A738 Byres Rd Kilwinning WB TTLS

Location:A738 (A737 Kilwinning to Pennyburn Rd Jct), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A738 Byres Rd, Kilwinning EB - TTLS

Location:A738 (A737 Kilwinning to Pennyburn Rd Jct), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A738 NB Stevenston Rd Kilwinning - TTLS

Location:A738 (Pennyburn Rd Jct to Whitehouse Park Rd Jct), Northbound

Start time:10th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A738 SB Stevenston Rd Kilwinning - TTLS

Location:A738 (Pennyburn Rd Jct to Whitehouse Park Rd Jct), Southbound

Start time:10th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 A701 Edinburgh Rd Rbt Lane Closures

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 Castle Douglas Road Crocketford NB 2 way lights

Location:A75 (Jct Cronie to A712 Jct), Northbound

Start time:17th of May 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Castle Douglas Road Crocketford SB 2 way lights

Location:A75 (Jct Cronie to A712 Jct), Southbound

Start time:17th of May 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 London Road Stranraer EB- TTL

Location:A75 (40 Mph Xroads to A75 Jct), Eastbound

Start time:16th of May 2024, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Portable Traffic Lights (TTLS).

A75 London Road Stranraer WB- TTL

Location:A75 (40 Mph Xroads to A75 Jct), Westbound

Start time:16th of May 2024, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Portable Traffic Lights (TTLS).

A75 @ B733 Jct Halfway House Kirkcolm EB- TTL

Location:A75 (Jct Dirnow to B733 Jct), Eastbound

Start time:13th of May 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 @ B733 Jct Halfway House Kirkcolm WB- TTL

Location:A75 (Jct Dirnow to B733 Jct), Westbound

Start time:13th of May 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Barlae Dual Glenluce EB - Lane Closure

Location:A75 (End Of Dual to 2-1 Lane Sec), Eastbound

Start time:15th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A75 Brownrigg Rbt Lane Closures

Location:A75 (Lockerbie Rd Rbt A709 to Lockerbie Rd Rbt A709), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 Cargenwater Rbt lane closures

Location:A75 (Glasgow Rd Rbt A76 to New Cargenbridge Rbt), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 Dancingknowe Rbt Lane Closures

Location:A75 (Dancingknowe Rbt to Lockerbie Rd Rbt A709), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 EB Between Cleughbrae and Colin - Route Part of Diversion

Location:A75 (B724 Jct to East Bullnose) to A75 (Panteth Hill Fm Jct to Mousewald Ldge Jct), Eastbound

Start time:11th of June 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A75 EB Between Stranraer and Castle Kennedy - TTLS

Location:A75 (A751 Jct to 40 Mph Xroads) to A75 (Jct Old School to Jct Inch Church), Eastbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 EB before Annan - TTLS

Location:A75 (Annan Jct West to B7020 Jct), Eastbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Garroch Rbt lane closures

Location:A75 (Cargenbridge Rbt to Garroch Loaning Rbt), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 Glasgow Rd/Cuckoo Bridge Rbt Lane Closures

Location:A75 (Glasgow Rd Rbt A76 to New Cargenbridge Rbt), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

A75 NB from Brownrigg Rbt to A780, Dumfries - Rolling Road Closure

Location:A75 (Dancingknowe Rbt to Lockerbie Rd Rbt A709) to A75 (Lockerbie Rd Rbt A709 to Lockerbie Rd Rbt A7

Start time:31st of May 2024, 7:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A75 NB from Edinburgh Road to A701 Tinwall, Dumfries - Rolling Road Closure

Location:A75 (Edinburgh Rd Rbt A701 to Edinburgh Rd Rbt A701) to A75 (Glasgow Rd Rbt A76 to Glasgow Rd Rbt A7

Start time:26th of May 2024, 2:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A75 Newton Stewart at Jct for A712 EB - TTLS

Location:A75 (A712 Jct to Newton Stewart Rbt) to A75 (Jct Blackcraig to A712 Jct), Eastbound

Start time:14th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Newton Stewart at Jct for A712 WB - TTLS

Location:A75 (Jct Blackcraig to A712 Jct) to A75 (A712 Jct to Newton Stewart Rbt), Westbound

Start time:14th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 SB from Brownrigg Rbt to A780, Dumfries - Rolling Road Closure

Location:A75 (Lockerbie Rd Rbt A709 to Edinburgh Rd Rbt A701) to A75 (Jct Nether Yett to Dancingknowe Rbt), S

Start time:31st of May 2024, 7:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A75 WB Between Cleughbrae and Colin - Route Part of Diversion

Location:A75 (Panteth Hill Fm Jct to Mousewald Ldge Jct) to A75 (East Bullnose to B724 Jct), Westbound

Start time:11th of June 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A75 WB Between Stranraer and Castle Kennedy - TTLS

Location:A75 (Jct Old School to Jct Inch Church) to A75 (A751 Jct to 40 Mph Xroads), Eastbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 WB before Annan - TTLS

Location:A75 (Annan Jct West to B7020 Jct), Westbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 at Kircowan Kirkcolm EB - TTLS

Location:A75 (Jct Dirnow to B733 Jct) to A75 (B735 Jct to Jct Dirnow), Eastbound

Start time:14th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 at Kircowan Kirkcolm WB - TTLS

Location:A75 (B735 Jct to Jct Dirnow) to A75 (Jct Dirnow to B733 Jct), Westbound

Start time:14th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 at Palnure EB - TTLS

Location:A75 (Jct Muirfad Fm to Jct Blackcraig) to A75 (Pulwhat Br to Jct Muirfad Fm), Eastbound

Start time:15th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 at Palnure WB - TTLS

Location:A75 (Pulwhat Br to Jct Muirfad Fm) to A75 (Jct Muirfad Fm to Jct Blackcraig), Westbound

Start time:15th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A751 @ A77 Jct @ Innermessan NB - TTLS

Location:A751 (A75 Jct to A77 Jct), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A751 @ A77 Jct @ Innermessan SB - TTLS

Location:A751 (A75 Jct to A77 Jct), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Afton Bridgend New cumnock NB TTL

Location:A76 (72m S Of Cairnhill Pl to B741 Mossmark Jct), Northbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Afton Bridgend New cumnock SB TTL

Location:A76 (72m S Of Cairnhill Pl to B741 Mossmark Jct), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Crossroads Roundabout SB - Narrow Lanes

Location:A76 (Crossroads Roundabout to Bowhouse Roundabout) to A76 (Cessnock Water Bridge to Crossroads Round

Start time:10th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Road Narrowing (Two Way Working).

A76 Crossroads Roundabout SB - TTLs

Location:A76 (Crossroads Roundabout to Bowhouse Roundabout) to A76 (Cessnock Water Bridge to Crossroads Round

Start time:6th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Dalpedder @ B797 2+1 NB lane closure

Location:A76 (S End Of Glenairlie 3-Lane to Priority Changeover S End) to A76 (N End Of Glenairlie 3-Lane to

Start time:13th of May 2024, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Lane Closure.

A76 Dalpedder @ B797 2+1 SB lane closure

Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange) to A76 (S End Of Glenairlie 3-Lane to Prio

Start time:13th of May 2024, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Lane Closure.

A76 Glenairlie to Mennock NB TTL's

Location:A76 (Parking Area to Jct Glengenny) to A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange), No

Start time:10th of May 2024, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Glenairlie to Mennock SB TTL's

Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange) to A76 (Parking Area to Jct Glengenny), So

Start time:10th of May 2024, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Howford Bridge SB TTL

Location:A76 (50m Nth Jct Highclews to B705 Catrine Rd Jct) to A76 (B713 Jct Catrine to 50m Nth Jct Highclews

Start time:20th of May 2024, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Howford bridge NB TTL

Location:A76 (B713 Jct Catrine to 50m Nth Jct Highclews) to A76 (50m Nth Jct Highclews to B705 Catrine Rd Jct

Start time:20th of May 2024, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Kirkconnel to Ayrshire Boundary NB - Progressive TTLS

Location:A76 (Jct Kirkland to Jct Rigg Farm) to A76 (Jct Glen Hall to E. Ayrshire Bdy), Northbound

Start time:16th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Kirkconnel to Ayrshire Boundary SB - Progressive TTLS

Location:A76 (Jct Glen Hall to E. Ayrshire Bdy) to A76 (Jct Kirkland to Jct Rigg Farm), Southbound

Start time:16th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Mauchline NB- TTL

Location:A76 (B743 Loudon St to Jct Hillhead), Northbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Mauchline SB- TTL

Location:A76 (B743 Loudon St to Jct Hillhead), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB Barburgh Mill Blackwood - TTLS

Location:A76 (Jct Dalswinton to End Layby) to A76 (End Layby to Jct Stepends), Northbound

Start time:28th of May 2024, 9:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB at Crawick - TTLS

Location:A76 (Jct To Manse to Access At Gateside), Northbound

Start time:22nd of May 2024, 10:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB between Catrine & Auchinleck - Route part of diversion

Location:A76 (Templeton Rbt to Templeton Rbt) to A76 (Start Approach to B713 Jct Catrine), Northbound

Start time:20th of May 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A76 NB between Sanquhar and Kelloholm - TTLS

Location:A76 (Access At Gateside to Jct To Kelloholm), Southbound

Start time:28th of May 2024, 7:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB Barburgh Mill Blackwood - TTLS

Location:A76 (End Layby to Jct Stepends) to A76 (Jct Dalswinton to End Layby), Southbound

Start time:28th of May 2024, 9:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB at Crawick - TTLS

Location:A76 (Jct To Manse to Access At Gateside), Northbound

Start time:22nd of May 2024, 10:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB between Catrine & Auchinleck - Route part of diversion

Location:A76 (B713 Jct Catrine to 50m Nth Jct Highclews) to A76 (Templeton Rbt to Templeton Rbt), Southbound

Start time:20th of May 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A76 SB between Sanquhar and Kelloholm - TTLS

Location:A76 (Access At Gateside to Jct To Kelloholm), Southbound

Start time:28th of May 2024, 7:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB from Lochside Road to A75 Glasgow Road, Dumfries - Rolling Road Closure

Location:A76 (Priory Avenue Roundabout to Priory Avenue Roundabout) to A75 (Glasgow Rd Rbt A76 to Glasgow Rd

Start time:17th of May 2024, 6:30pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A76 Skerrington Roundabout NB - TTLs

Location:A76 (Jct Polquhap to Skerrington Rbt) to A76 (Skerrington Rbt to Dettingen Rbt), Northbound

Start time:4th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 Skerrington Roundabout SB - TTLs

Location:A76 (Skerrington Rbt to Dettingen Rbt) to A76 (Jct Polquhap to Skerrington Rbt), Southbound

Start time:4th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 The Castle New Cumnock - Event

Location:A76 (B741 Mossmark Jct to Polqueys Rd Jct), Northbound

Start time:1st of June 2024, 11:00am

Description:Works:
Planned Event

Traffic Management:
No Obstruction on Carriageway or Footway.

A77 Ballantrae to Girvan north- Sop & Go

Location:A77 (Old Smyrton to B7044 Jct) to A77 (Ardmillan Castle to A714 Shallochpark Rbt), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Stop/Go Boards Traffic Control.

A77 Ballantrae to Girvan south- Stop & Go

Location:A77 (Ardmillan Castle to A714 Shallochpark Rbt) to A77 (Old Smyrton to B7044 Jct), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Stop/Go Boards Traffic Control.

A77 Bankfield to Minishant NB- TTL

Location:A77 (Jct Kewnston to Culroy Burn Br) to A77 (A79 Jct Maybole Rd to Bankhead Rbt), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Bankfield to Minishant SB- TTL

Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt) to A77 (Jct Kewnston to Culroy Burn Br), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Crosssraguel Abbey Maybole NB - TTL

Location:A77 (Jct Blanefield to Jct Broomknowes Fm), Northbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Crosssraguel Abbey Maybole SB - TTL

Location:A77 (Jct Blanefield to Jct Broomknowes Fm), Southbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Glenapp Ballantrae NB TTL

Location:A77 (North Mark Br to Jct Carlock Hse), Northbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Glenapp Ballantrae SB TTL

Location:A77 (North Mark Br to Jct Carlock Hse), Southbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Glengall to Bankfield Rbt NB - TTLs

Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt), Northbound

Start time:29th of May 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Glengall to Bankfield Rbt SB - TTLs

Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt), Southbound

Start time:29th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Grassyards onslip N/B lane closure

Location:A77 (Start Of Nb On Slip to End Of Nb On Slip), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A77 Henrietta Street Girvan - Works entirely on the F/W

Location:A77 (Duncan Street to Henrietta Street Roundabout), Northbound

Start time:14th of May 2024, 8:30am

Description:Works:
Utility Works

Traffic Management:
Works Entirely on Footway.

A77 Henrietta Street Girvan - Works entirely on the F/W

Location:A77 (Duncan Street to Henrietta Street Roundabout), Southbound

Start time:14th of May 2024, 8:30am

Description:Works:
Utility Works

Traffic Management:
Works Entirely on Footway.

A77 Kirkoswald Road South Kirkoswald NB- TTL

Location:A77 (High Park Jct to Jct Kirk Brae Kirkoswald), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Kirkoswald Road South Kirkoswald SB- TTL

Location:A77 (High Park Jct to Jct Kirk Brae Kirkoswald), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Bankfield Rbt to Holmston Rbt - Route Part of Diversion

Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt) to A77 (Holmston Rbt to Holmston Rbt), Northbound

Start time:20th of May 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A77 NB Between Whitletts Rbt and Dutch House Rbt - Mobile Lane closures

Location:A77 (Whitletts Roundabout to Sandyford Toll Roundabout) to A77 (Dutch Hse Rbt to Dutch Hse Rbt), Nor

Start time:14th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

A77 NB Henrietta St Girvan - TTLS

Location:A77 (Duncan Street to Henrietta Street Roundabout), Northbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Kirkoswald Rd - TTLS

Location:A77 (High Park Jct to Jct Kirk Brae Kirkoswald), Northbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Main Rd Kirkoswald - TTLS

Location:A77 (Jct Kirk Brae Kirkoswald to Old Toll Cottage), Northbound

Start time:5th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Main Rd at Minishant - TTLS

Location:A78 (South St Roundabout to Inverkip Rd Rbt), Northbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB North of Stranraer - TTLS

Location:A77 (Mcmasters Rd to A751 Dunfries Jct), Northbound

Start time:15th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Old St Girvan - TTLS

Location:A77 (End Of Graveyard to Jct Montgomerie St) to A77 (Jct Montgomerie St to Railway Br), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Between Whitletts Rbt and Dutch House Rbt - Mobile Lane closures

Location:A77 (Whitletts Roundabout to Sandyford Toll Roundabout) to A77 (Dutch Hse Rbt to Dutch Hse Rbt), Sou

Start time:14th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

A77 SB Henrietta St Girvan - TTLS

Location:A77 (Duncan Street to Henrietta Street Roundabout), Southbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Kirkoswald Rd - TTLS

Location:A77 (High Park Jct to Jct Kirk Brae Kirkoswald), Southbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Main Rd Kirkoswald - TTLS

Location:A77 (Jct Kirk Brae Kirkoswald to Old Toll Cottage), Southbound

Start time:5th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Main Rd at Minishant - TTLS

Location:A78 (South St Roundabout to Inverkip Rd Rbt) to A77 (Jct Kewnston to Culroy Burn Br), Southbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB North of Stranraer - TTLS

Location:A77 (Mcmasters Rd to A751 Dunfries Jct), Southbound

Start time:15th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Old St Girvan - TTLS

Location:A77 (Jct Montgomerie St to Railway Br) to A77 (End Of Graveyard to Jct Montgomerie St), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Sandyford Toll Rbt NB - Lane Closure

Location:A77 (Whitletts Roundabout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Roundabout to Dutch H

Start time:13th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A77 Sandyford Toll Rbt SB - Lane Closure

Location:A77 (Dutch House R/Bout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Rbt to Start Of 4 Lane)

Start time:13th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A77 Shallochpark Roundabout, Girvan - Road Part of a Diversion Route

Location:A77 (Shallochpark Rbt to Shallochpark Rbt), Southbound

Start time:3rd of June 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A77/A76 Bellfield Interchange NB - Lane Closures

Location:A77 (Nb Slip Road Exit to Hurlford Int Rbt) to A77 (Nb Slip Road Exit to On Slip From A76/A71), Nort

Start time:10th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A77/A76 Bellfield Interchange NB - Lane Closures

Location:A76 (Bowhouse Roundabout to Start Approach To Hulford Int) to A77 (Hurlford Int Rbt to Hurlford Int

Start time:10th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A77/A76 Bellfield Interchange SB - Lane Closures

Location:A77 (Sb Slip Exit to Hurlford Int Rbt) to A77 (Off Slip To A76/A71 to Sb On Slip), Southbound

Start time:10th of June 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A78 Inverkip Road Cumberland Rd Auchmead Rd SB - Daytime TTL's

Location:A78 (Cumberland Rd to Derest Sign), Southbound

Start time:11th of May 2024, 6:01am

Description:Works:
High Friction Works, Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Inverkip Road Pennyfern Rd From - Neil Street SB - Convoy

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
High Friction Works, Lining Works, Resurfacing

Traffic Management:
Convoy Working.

A78 Inverkip Road from Neil Street NB - Pennyfern Rd - Convoy

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Northbound

Start time:28th of May 2024, 8:00pm

Description:Works:
High Friction Works, Lining Works, Resurfacing

Traffic Management:
Convoy Working.

A78 Main Road Fairlie NB TTL

Location:A78 (Pier Rd Jct to Lodge At Sou'An Rd End), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Main Road Fairlie SB- TTL

Location:A78 (Pier Rd Jct to Lodge At Sou'An Rd End), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Ardrossan Road Seamill NB- TTL

Location:A78 (Yerton Brae Jct to Glenbryde Rd Jct), Northbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Ardrossan Road Seamill SB - TTL

Location:A78 (Yerton Brae Jct to Glenbryde Rd Jct), Southbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A78 B746 SB Access from Meadowhead - Total Closure

Location:A78 (Meadowhead Rbt to Meadowhead Rbt), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A78 SB - Offslip to B746 - Corraith Rd - B746 - End

A78 EB Main Road Inverkip TTL

Location:A78 (Jct Inverkip to Exit Power Stat), Eastbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Greenock Road St Phillians NB-TTL

Location:A78 (Glenhaven House to Lodge At Qu'Ter Est.), Northbound

Start time:15th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Greenock Road St Phillians SB-TTL

Location:A78 (Glenhaven House to Lodge At Qu'Ter Est.), Southbound

Start time:15th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Inverkip Road Greenock EB - TTLs

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Eastbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Inverkip Road Greenock WB - TTLs

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Westbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Road @ Hayle Brae NB - TTL

Location:A78 (A760 Jct Dalry Rd to Jct Firpark Plantation) to A78 (Gogo St to A760 Jct Dalry Rd), Northbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Road @ Hayle Brae SB - TTL

Location:A78 (Gogo St to A760 Jct Dalry Rd) to A78 (A760 Jct Dalry Rd to Jct Firpark Plantation), Southbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Meadowhead Rbt - Lane Closure

Location:A78 (Meadowhead Rbt to Meadowhead Rbt), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

A78 NB Auchengate - Meadowhead Rbt - Total Closure

Location:A78 (A759 O'Bridge to Meadowhead Rbt), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A78 NB Offslip at Auchengate and follow the A759 to re-join the A78 at Meadowhead Roundabout.

A78 NB Dual Inverkip Road, Greenock - Lane Closure

Location:A78 (Derest Sign to Start Dual Spango Valley) to A78 (Jct Loch Thom Rd to Bankfoot Rbout), Northboun

Start time:22nd of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A78 NB Inverkip Rd Greenock - TTLS

Location:A78 (South St Roundabout to Inverkip Rd Rbt), Northbound

Start time:12th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Inverkip Road/IBM lane Closures

Location:A78 (Bankfoot Rbout to Jct Loch Thom Rd) to A78 (Derest Sign to Start Dual Spango Valley), Northboun

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A78 NB Irvine Rd after Hunterston Rbt - TTLS

Location:A78 (Sseb Rbt Hunterston to Jct B782), Northbound

Start time:10th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Irvine Rd at Crosshill Brae Crossroads - TTLS

Location:A78 (Jct B7048 to Yerton Brae Jct) to A78 (Jct B782 to Jct B7048), Northbound

Start time:10th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 N\B Ardrossan Road Seamill - TTLs

Location:A78 (220m N Of Chapelton to B7047 Jct) to A78 (Yerton Brae Jct to Glenbryde Rd Jct), Northbound

Start time:2nd of September 2024, 9:30am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Neil Street NB Total closure

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
High Friction Works, Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Grieve Rd - Curlew Cres - Munro St - Return Neil street

A78 Neil Street SB Total closure

Location:A78 (Gateside Ave to Start Dual At Bus Stop), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
High Friction Works, Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Munro Street - Gurlew Cres - Grieve Rd - Return A78 NB

A78 SB Dual Inverkip Road, Greenock - Lane Closure

Location:A78 (Derest Sign to Start Dual Spango Valley) to A78 (Jct Loch Thom Rd to Bankfoot Rbout), Southboun

Start time:22nd of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A78 SB Inverkip Rd Greenock - TTLS

Location:A78 (South St Roundabout to Inverkip Rd Rbt), Southbound

Start time:12th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB Inverkip Road/IBM lane Closures

Location:A78 (Derest Sign to Start Dual Spango Valley) to A78 (Jct Loch Thom Rd to Bankfoot Rbout), Southboun

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A78 SB Inverkip St/High Street Greenock Lane closures

Location:A78 (W Stewart St to Sir Michael St Rbt) to A78 (Sir Michael St Rbt to East/West Shaw Rbt), Southbou

Start time:10th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A78 SB Irvine Rd after Hunterston Rbt - TTLS

Location:A78 (Sseb Rbt Hunterston to Jct B782), Southbound

Start time:10th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB Irvine Rd at Crosshill Brae Crossroads - TTLS

Location:A78 (Jct B782 to Jct B7048) to A78 (Jct B7048 to Yerton Brae Jct), Southbound

Start time:10th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB Irvine Rd at Hunterston Rb- Road Narrow

Location:A78 (Bsc Rbt Hunterston to Sseb Rbt Hunterston) to A78 (Sseb Rbt Hunterston to Jct B782), Southbound

Start time:10th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Road Narrowing (Two Way Working).

A78 SB Loans to Monktonhead Rbt - Lane Closure

Location:A78 (Exit Sb From A78 to Entry Slip B746), Southbound

Start time:14th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A78 S\B Ardrossan Road Seamill - TTLs

Location:A78 (220m N Of Chapelton to B7047 Jct) to A78 (Yerton Brae Jct to Glenbryde Rd Jct), Southbound

Start time:2nd of September 2024, 9:30am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 South of Inverkip War Memorial - No Obstruction on Carriageway or Footway

Location:A78 (Jct Inverkip to Exit Power Stat), Northbound

Start time:13th of May 2024, 10:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A78 WB Main Road Inverkip TTL

Location:A78 (Jct Inverkip to Exit Power Stat), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A78 from Ardgowan to Wemyss Bay NB - Mobile Stop/Go

Location:A78 (40mph Wemyss Bay to Kelly Bridge) to A78 (Bankfoot Rbt to Bankfootrbt), Northbound

Start time:14th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A78 from Ardgowan to Wemyss Bay SB - Mobile Stop/Go

Location:A78 (Bankfoot Rbt to End Of Dual C/Way) to A78 (40mph Wemyss Bay to Kelly Bridge), Southbound

Start time:14th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A8 B789 WB Langbank off slip -Slip Closure

Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow road to woodhall rbt- leave woodhall at 4th exit for A8 east- at rbt take 2nd exit - end

A8 Baillieston Roundabout - outer ring closure

Location:A8 (Baillieston Int Rbt to Baillieston Int Rbt), Westbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A8 EB Greenock Road Comet Rbt to Newark Rbt - Lane Closure

Location:A8 (Port Glasgow Nothern Rbt to Port Glasgow Eastern Rbt) to A8 (Newark Rbt to Newark Rbt), Eastboun

Start time:29th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A8 EB E Hamilton Street - Route Part of Diversion

Location:A8 (Bogston Lane to Sinclair Street) to A8 (Sinclair Street to Cartsdyke Rbt), Eastbound

Start time:10th of June 2024, 10:00pm

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A8 EB Greenock Rd Port Glasgow mobile lane closures GG116

Location:A8 (Port Glasgow Western Rbt to Port Glasgow Western Rbt) to A8 (Port Glasgow Eastern Rbt to Port Gl

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure

Location:A8 (Woodhall Rbt to Pt Glasgow Bdy) to M8 (Slip Off To A8 to Slip Entry From A8), Eastbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure

Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Woodhall Rbt), Eastbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave Newark Rbt onto A761 - at rbt take 1st exit onto Glasgow Rd - at Woodhall Rbt follow signs

A8 EB Greenock Road Port Glasgow - Lane Closure (Sat Nights Only)

Location:A8 (Woodhall Rbt to Pt Glasgow Bdy), Eastbound

Start time:25th of May 2024, 9:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 EB Newark Rbt to Bullring Rbt - Mobile Lane Closures

Location:A8 (Bull Ring Rbt to Bull Ring Rbt) to A8 (Newark Rbt to Newark Rbt), Eastbound

Start time:9th of June 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

A8 East Hamilton St WB - Lane Closure

Location:A8 (Port Glasgow Western Rbt to Bogstan Lane) to A8 (Bogston Lane to Sinclair Street), Westbound

Start time:20th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A8 Eastbound Carnbroe off-slip - Total closure

Location:A8 (Shawhead Overbridge to Carnbroe On Slip), Westbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Sweethill terrace, Carnbroe Rd, Paddock St, Sykeside Rd, B802.

A8 Eastbound Carnbroe on-slip - Total closure

Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Carnbroe On Slip to End Of 3 Lane At Off Slip),

Start time:22nd of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 EB Chapelhall, B799 Bo'Ness Road follow sign for Carnbroe, B802 Woodhall Mill Rd, Sykeside Road, Paddock Street, Park Place, Carnbroe Road, Sweethill terrace

A8 Eastbound Chapelhall North Rbt - Inner ring closure

Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Chapelhall North Rbt - Inner ring closure

Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Chapelhall to Newhouse - Total closure

Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split) to M8 (A73 Newhouse Rbt to On To M8 Eb), Eastbound

Start time:18th of May 2024, 6:00am

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Chapelhall North Rbt, Chapelhall South Rbt, B799, A775 Edinburgh Road.

A8 Eastbound Eurocentral North Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Eurocentral North Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Eurocentral to Chapelhall - Total closure

Location:A8 (Eurocentral N.Rbt to Eb On Slip) to A8 (Start Chapelhall Eb Off Slip to Start 2 Way Slip), Eastb

Start time:18th of May 2024, 6:00am

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Eurocentral North Rbt, Eurocentral South Rbt, Townhead Avenue, McNeil Drive

A8 Eastbound Eurocentral to Newhouse - Progressive nearside & offside lane closures

Location:A8 (Eurocentral N.Rbt to Eb On Slip) to M8 (End Of Ppp to Duntilland Road), Eastbound

Start time:20th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Shawhead off-slip - Total closure

Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Start 2 Way Slip to Start 4 Lane), Eastbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 EB Eurocentral, A8 WB Eurocentral, WB Shawhead offslip

A8 Eastbound Shawhead on-slip -Total closure

Location:A725 (Shawhead Rbt to Shawhead Rbt) to A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 westbound, A8 Showcase off slip, A8 eastbound on-slip

A8 Eastbound Shawhead to Eurocentral - Offside lane closure

Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Single Lane Running.

A8 Eastbound Showcase off-slip - Total closure

Location:A8 (Baillieston On Slip to Bargeddie Underbridge) to A8 (2 Way Split to A752 Langmuir Rbt), Eastboun

Start time:15th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 EB Shawhead Off-slip, WB Shawhead On-slip.

A8 Eastbound Showcase on-slip - Total closure

Location:A8 (2 Way Split to A752 Langmuir Rbt) to A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastboun

Start time:15th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 WB Showcase onslip, Bargeddie Rbt, A8 EB.

A8 Eastbound Swinton Rbt to Bargeddie Rbt - Total closure

Location:A8 (Coatbridge Rd / Edinburgh Rd to Baillieston Rbt) to M73 (Off Slip From M73 to A8 Bailleston Rbt)

Start time:20th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A8 Non Motorway Traffic - Swinton Rbt, A8 Glasgow & Edinburgh Road, Easterhouse Road, Westerhouse Road, Lochend Road, Gartcosh Road, Coatbridge Road.

A8 Motorway Traffic - Swinton Rbt, Baillieston Rbt, M8 Eastbound Jct 8 on-slip, M8 Eastbound Eurocentral off-slip, Eurocentral North Rbt to South Rbt, A8 Westbound On-slip, Bargeddie Rbt.

A8 Greenock Road between Langbank Rbt and M8 Jct 31 EB - Lane Closures

Location:A8 (Langbank Rbt E/B Exit to West Ferry Toll Int E/B Off Slip), Eastbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A8 Greenock Road from Newark Rbt to Port Glasgow Road Jct - Lane Closures

Location:A8 (Port Glasgow Eastern Rbt to Newark Rbt) to A8 (Port Glasgow Western Rbt to Bogstan Lane), Westbo

Start time:2nd of June 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Greenock Road from Newark Rbt to Port Glasgow Road Jct - Lane Closures

Location:A8 (Bogstan Lane to Port Glasgow Western Rbt) to A8 (Newark Rbt to Newark Rbt), Eastbound

Start time:2nd of June 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure

Location:A8 (Cartsdyke Rbt to Cartsdyke Rbt) to A8 (B788 Jct to Bull Ring Rbt), Westbound

Start time:19th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure

Location:A8 (B788 Jct to Cartsburn St Rbt) to A8 (Cartsdyke Rbt to Cartsdyke Rbt), Eastbound

Start time:19th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Port Glasgow Road/East Hamilton Street from Bogston to Cartsdyke Rbt - Lane Closure

Location:A8 (Bogstan Lane to Port Glasgow Western Rbt) to A8 (Sinclair Street to Cartsdyke Rbt), Westbound

Start time:26th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Port Glasgow Road/East Hamilton Street from Bogston to Cartsdyke Rbt - Lane Closure

Location:A8 (Cartsdyke Rbt to Cartsdyke Rbt) to A8 (Bogstan Lane to Port Glasgow Western Rbt), Eastbound

Start time:26th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Rue End St to Newark Roundabout - Route Part of Diversion

Location:A8 (Bull Ring Rbt to B788 Jct) to A8 (Newark Rbt to Newark Rbt), Eastbound

Start time:20th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A8 Rue End St/Dalrymple St, from Dellingburn Street Jct to Bullring Rbt - Lane Closure

Location:A8 (B788 Jct to Bull Ring Rbt), Westbound

Start time:12th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Rue End St/Dalrymple St, from Dellingburn Street Jct to Bullring Rbt - Lane Closure

Location:A8 (Bull Ring Rbt to B788 Jct), Eastbound

Start time:12th of May 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A8 Strathclyde Business Park on-slip - Total closure

Location:A725 (Off Slip to Phonenix Crescent) to A725 (Diamond Int Crossrds to Eb On Slip Diamond Int), North

Start time:9th of June 2024, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
A725 Diamond SB Onslip, Bellziehill SB Offslip, Bellziehill Rbt, Belziehill NB Onslip

A8 WB Langbank on slip - Slip Closure

Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow B789 main rd- at jct take 1st left onto rbt- at rbt take 1st exit onto A8 west- end

A8 WB - M8 J31 to Woodhall Rbt - Lane Closures

Location:M8 (Slip From M8 Wb to Slip Entry From A8) to A8 (Woodhall Rbt to Woodhall Rbt), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 WB Greenock Rd Port Glasgow mobile lane closures GG116

Location:A8 (Port Glasgow Eastern Rbt to Port Glasgow Eastern Rbt) to A8 (Port Glasgow Western Rbt to Port Gl

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 WB Greenock Road Newark Rbt to Comet Rbt - Lane Closure

Location:A8 (Newark Rbt to Newark Rbt) to A8 (Port Glasgow Eastern Rbt to Port Glasgow Eastern Rbt), Westboun

Start time:27th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure

Location:A8 (Woodhall Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end

A8 WB Newark Rbt to Bullring Rbt - Mobile Lane Closures

Location:A8 (Port Glasgow Eastern Rbt to Newark Rbt) to A8 (Bull Ring Rbt to Bull Ring Rbt), Westbound

Start time:9th of June 2024, 6:30am

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

A8 WB, Parklea Rd off slip - Slip Closure

Location:A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave woodhall rbt onto parklea rd- follow road- end

A8 WB, Parklea Rd on slip - Slip Closure

Location:A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow parklea rd onto woodhall rbt-leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end

A8 Westbound Bargeddie Rbt to Swinton Rbt - Total closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt) to A8 (Coatbridge Rd / Edinburgh Rd to Baillieston Rbt)

Start time:22nd of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A8 Non Motorway Traffic - Coatbridge Road, Gartcosh Road, Lochend Road, Westerhouse Road, Easterhouse Road, A8 Glasgow & Edinburgh Road, Swinton Rbt.

A8 Motorway Traffic - A8 Eastbound, A8 Eurocentral North Rbt, A8 Eurocentral South Rbt, M8 Eurocentral on-slip Westbound, M8 Westbound.

A8 Westbound Bargeddie Roundabout - Inner ring closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Bargeddie Roundabout - Inner ring closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Bargeddie rbt - Offside lane closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Chapelhall South Rbt - Inner ring closure

Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip), Westbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Chapelhall South Rbt - Inner ring closure

Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip), Westbound

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Chapelhall south Rbt - Total closure

Location:A8 (Slip Rd 2 Way Split to B799 Jct), Westbound

Start time:31st of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Chapelhall South Rbt to Bo'ness Bt & Return NB

A8 Westbound Eurocentral South Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral S.Rbt), Westbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Eurocentral South Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral S.Rbt), Westbound

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Eurocentral South Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral S.Rbt) to A8 (Eurocentral S.Rbt to Wb On Slip Start), Westbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A8 Westbound Eurocentral South Rbt -Total closure to A8 Eastbound Eurocentral North Rbt

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to A8 (End Of 3 Lane At Off Slip to Eurocentral Overbridg

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Euro on-slip, Bargeddie Rbt & Follow Pernament signs.

A8 Westbound Eurocentral south Rbt - Total closure to M8 Westbound on-slip

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start), Westbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Euro on-slip, Bargeddie Rbt & Follow Pernament signs.

A8 Westbound Eurocentral to Shawhead - Offside lane closure

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to A8 (Orchard Farm Access to Shawhead Overbridge), Westb

Start time:21st of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Single Lane Running.

A8 Westbound Newhouse on-slip - Total closure

Location:A8 (A73 Rbt to Entry Wb A8) to A8 (Newhouse Entry Slip to B799 O'Bridge), Westbound

Start time:14th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A73, Lancaster Ave, B799 Bo'Ness Road.

A8 Westbound Newhouse to Eurocentral - Progressive nearside & offside lane closures

Location:M8 (End Of Se Unit to A73 On Slip) to A8 (Off-Slip Start to Eurocentral S.Rbt), Westbound

Start time:20th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Shawhead off-slip - Total closure

Location:A8 (Slip Rd Off A8 Wb to 2 Way Split) to A8 (A725 Jct to 2 Way Split Wb Slip), Westbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 westbound, A8 Showcase off slip, A8 eastbound, A8 Shawhead eastbound off slip

A8 Westbound Shawhead on-slip - Total closure

Location:A8 (A725 Jct to 2 Way Split Wb Slip) to A8 (Shawhead Overbridge to Bargeddie), Westbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 eastbound, A8 Eurocentral Link Rd, A8 westbound

A8 Westbound Showcase off-slip - Total closure

Location:A8 (Shawhead Overbridge to Bargeddie) to A8 (A752 Jct to 2 Way Split), Westbound

Start time:16th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 Bargeddie roundabout and return eastbound

A8 Westbound Showcase on-slip - Total closure

Location:A8 (A752 Jct to 2 Way Split) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Showcase off-slip, Aitkenhead Road, Langmuir Road, Coatbridge Road.

A8 Westbound Showcase on-slip - Total closure

Location:A8 (A752 Jct to 2 Way Split) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westbound

Start time:16th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

A8 Westbound Showcase to Bargeddie Rbt - Total closure

Location:A8 (Shawhead Overbridge to Bargeddie) to M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Showcase off-slip, Aitkenhead Road, Langmuir Road, Coatbridge Road.

A8 Westbound Swinton Roundabout - Inner ring closure

Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to A8 (Coatbridge Rd / Edinburgh Rd to Baillies

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Westbound Swinton Roundabout - Inner ring closure

Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to A8 (Coatbridge Rd / Edinburgh Rd to Baillies

Start time:1st of June 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8(M) Glasgow Edinburgh Road - Offside lane closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Eastbound

Start time:25th of May 2024, 6:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A804 SB Newton St Total Closure

Location:M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
Diversion to M8 WB
WB on St Vincent Street > SB on Finnieston Street > EB on Clydeside Expressway > Rejoin the M8 WB via Stobcross on Ramp.
Diversion to Argyle Street

WB on St Vincent Street > SB on Finnieston Street > EB on Clydeside Expressway > Rejoin Argyle Street at the End of the Expressway

WB on St Vincent Street > SB on Finnieston Street > EB on Clydeside Expressway > Argyle Street > NB on Douglas Street > WB on Waterloo Street > Merge to Bishops Lane to the Hilton

A82 EB Great Western Road @ Erskine Bridge - Lane Closures

Location:A82 (Gavinsburn to A898 Erskine Bridge) to A898 (A898 Northbound Off Slip to A82 Southbound), Eastbo

Start time:28th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A82 SB Alexandria Bypass Stoneymollan - Barloan Rbt - Closure

Location:A82 (A811 Rbt to Br Over Cardross Rd) to A82 (Lomondgate Rbt to Barloan Toll Rbt), Southbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 diversion (both directions: A811, A813, Stirling Rd,
Diversion for Renton Rd on-slip: Lennox St, Main St, Bank St, North Main St, Luss Rd, A811

A82 SB Great Western Road from Dunglass Rbt to Erskine - Lane Closure

Location:A82 (Dunglass Roundabout to Dunglass Roundabout) to A898 (A898 Northbound Off Slip to A82 Southbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A82 WB Great Western Road @ Erskine Bridge - Lane Closures

Location:A898 (A898 Northbound Off Slip to A82 Southbound) to A82 (Erskine Bridge A898 to A814 Jct), Westboun

Start time:28th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A82 /A814 Dumbarton Rd - A82 NB - Total Closure

Location:A82 (Erskine Bridge A898 to A814 Jct), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Continue A814 Dumbarton Rd - Dunglass Rbt - Return A82 NB

A82 A86 Jnct Spean Bridge NB - Road Closure with Amnesties

Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Northbound

Start time:9th of June 2024, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties 2100, 2200, 2300, 0000, 0200, 0400

A82 A86 Jnct Spean Bridge SB - Road Closure with Amnesties

Location:A82 (A86 Jct to B8004 Jct) to A82 (Spean Br Sign to A86 Jct), Southbound

Start time:9th of June 2024, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties 2100, 2200, 2300, 0000, 0200, 0400

A82 Abriachan North of Drumnadrochit NB - TTL

Location:A82 (Clansman Hotel to Rose Cottage), Northbound

Start time:13th of May 2024, 7:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Abriachan North of Drumnadrochit SB - TTL

Location:A82 (Clansman Hotel to Rose Cottage), Southbound

Start time:13th of May 2024, 7:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Achintore Rd Fort William NB - TTL

Location:A82 (Past Mercury Inn to West End Rbt), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Achintore Rd Fort William SB - TTL

Location:A82 (Past Mercury Inn to West End Rbt), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Arden NB - TTL

Location:A82 (A811 Roundabout to Start Wb Approach) to A82 (Start Wb Approach to Arden Roundabout), Northboun

Start time:28th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Arden SB - TTL

Location:A82 (Arden Rbt to Eb Exit) to A82 (A811 Roundabout to Start Wb Approach), Westbound

Start time:28th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ballachulish Bridge NB - TTL

Location:A82 (S Ballachulish Rbt to Kinlochleven Junc B863), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ballachulish Bridge SB - TTL

Location:A82 (S Ballachulish Rbt to Kinlochleven Junc B863) to A828 (Inshaig Br to Under Ballachulish Br), So

Start time:27th of May 2024, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Bunree South of Corran - Convoy Works

Location:A82 (Cuilchenna Ho to A861 Corran Ferry Jct), Northbound

Start time:9th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 Corriegour Lodge North of Spean Bridge - Stop/Go Works

Location:A82 (B8004 Jct to Glengloy Jct), Southbound

Start time:14th of May 2024, 7:00am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Corrychurrachan North of Corran NB - Road Closure with Amnesties

Location:A82 (Cemetery Entrance to Past Mercury M/Inn), Northbound

Start time:26th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION -

Amnesties at 2100, 2200, 2300, 0000, 0200, 0400

A82 Corrychurrachan North of Corran SB - Road Closure with Amnesties

Location:A82 (Cemetery Entrance to Past Mercury M/Inn), Southbound

Start time:26th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

A82 Drumnadrochit NB - TTL

Location:A82 (Borlum Bridge to A831 Drumnadrochit Bridge), Northbound

Start time:28th of May 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Drumnadrochit SB - TTL

Location:A82 (Borlum Bridge to A831 Drumnadrochit Bridge), Southbound

Start time:28th of May 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Dunglass Rbt- Outer Ring Lane Closure

Location:A82 (Dunglass Roundabout to Dunglass Roundabout), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Lane Closure.

A82 Falls of Falloch North of Inverarnan - Convoy Works

Location:A82 (Stirling/Argyle Bdy to Allt Fonn Br.) to A82 (Allt Fonn Bridge to Derrydaroch Bridge), Northbou

Start time:27th of May 2024, 7:00am

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 Great Western Road Erskine Bridge - Dunglass Rbt - NB - Total Closure

Location:A82 (Erskine Bridge A898 to A814 Jct) to A82 (Dunglass Roundabout to Dunglass Roundabout), Northboun

Start time:16th of May 2024, 10:00pm

Description:Works:
Lining Works, Resurfacing, Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
Commence on A82 by taking left onto slip road and access to Mountblow Interchange – take left at Mountblow Road – continue over bridge to join on slip to A82 Great Western Road – at A810 junction at Duntocher take left to join the A810 and continue on Dumbarton Road – straight ahead 2nd exit at Hardgate roundabout continuing on Glasgow Road and Duntocher Road to the B8050 junction (Baljaffray Road) – take left follow B8050 to roundabout at Stockiemuir Road - take first left onto A809 – continue on A809 via Craigton Village and Croftamie to A811 junction at Drymen Bridge – take left and follow A811 via Gartocharn and Balloch to rejoin A82 at Stoneymollan Roundabout.

A82 Highbridge South of Spean Bridge - Stop/Go Works

Location:A82 (High Bridge Junction to Spean Br Sign) to A82 (Gt Glen C/Ranch to High Bridge Junction), Southb

Start time:16th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Invergloy North of Spean Bridge NB - TTL

Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Invergloy North of Spean Bridge SB - TTL

Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Southbound

Start time:27th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Invermoriston NB - TTL

Location:A82 (Inchnacardoch Hotel to 1st L B4 C/Site) to A82 (1st L B4 C/Site to A887 Junction), Northbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Invermoriston SB - TTL

Location:A82 (1st L B4 C/Site to A887 Junction) to A82 (Inchnacardoch Hotel to 1st L B4 C/Site), Southbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Inveruglas NB - TTL

Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Northbound

Start time:14th of May 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Inveruglas SB - TTL

Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Southbound

Start time:14th of May 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Kenneth Street Inverness - Signage

Location:A82 (Kenneth St. to Telford St Rbt), Northbound

Start time:15th of May 2024, 9:30am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A82 Loch Linnie Picnic Area North of Corran - Stop/Go Works

Location:A82 (Cemetery Entrance to Past Mercury M/Inn), Southbound

Start time:10th of June 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Loch Lochy South of Laggan NB - TTL

Location:A82 (L/Findlay North to Culvert Past Layby) to A82 (Culvert Past Layby to Laggan Swing Br), Northbou

Start time:13th of May 2024, 7:00am

Description:Works:
Ancillary Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Loch Lochy South of Laggan SB - TTL

Location:A82 (Culvert Past Layby to Laggan Swing Br) to A82 (L/Findlay North to Culvert Past Layby), Southbou

Start time:13th of May 2024, 7:00am

Description:Works:
Ancillary Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Longman Rd Inverness NB - Lane Closure

Location:A82 (Rose St Rbt to Harbour Rd Rbt), Northbound

Start time:13th of May 2024, 7:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A82 Longman Rd NB - Vergeworks

Location:A82 (Rose St Rbt to Harbour Rd Rbt) to A82 (Speed Derest to Longman Rbt), Northbound

Start time:15th of May 2024, 7:00am

Description:Works:
Lighting Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A82 N/B Stirling Road approach to Barloan Rbt Lane Closure

Location:A82 (Greenhead Road to Barloan Roundabout), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Traffic Loops

Traffic Management:
Lane Closure.

A82 NB Alexandria Bypass Rentom Road offlsip - Closure

Location:A82 (River Leven to Dalmoak), Northbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 diversion (both directions: A811, A813, Stirling Rd,
Diversion for Renton Rd on-slip: Lennox St, Main St, Bank St, North Main St, Luss Rd, A811

A82 NB - A814 Dumbarton Rd - Total Closure

Location:A82 (Erskine Bridge A898 to A814 Jct), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
LOCAL TRAFFIC ONLY

Commence by taking left onto slip road to A814 - A814 Mountblow Rd - A814 Dumbarton Road – take right and follow A814 Dumbarton Road through old Kilpatrick & Bowling ( No Access to vehicles over 15’ (4.5m)

A82 NB Alexandria Barloan Rbt to Stoneymollan Closure

Location:A82 (Barloan Roundabout to Barloan Roundabout) to A82 (A811 Roundabout to A811 Roundabout), Northbou

Start time:23rd of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 diversion (both directions: A811, A813, Stirling Rd,
Diversion for Renton Rd on-slip: Lennox St, Main St, Bank St, North Main St, Luss Rd, A811

A82 NB Erskine to Dunglass - Lane Closures

Location:A898 (A898 Northbound Off Slip to A82 Southbound) to A82 (Dunglass Roundabout to Dunglass Roundabout

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A82 NB Old Kilpatrick off slip - Slip Closure

Location:A82 (Erskine Bridge A898 to A814 Jct) to A898 (A82 Southbound Off Slip to A898 Southbound), Northbou

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A82 north- leave A82 for A814- turn left onto A814 dumbarton rd- turn left onto station rd- end

A82 NB Old Kilpatrick on slip - Slip Closure

Location:A82 (Erskine Bridge A898 to A814 Jct), Northbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A878 south to great western rd- leave A82 at next exit for mountblow rd- take 1st right for A82 north- end

A82 NB Stirling Rd at Dumbarton - Route part of diversion

Location:A82 (A914 Dumbuck to Greenhead Road) to A82 (Barloan Rbt to Greenhead Rd), Northbound

Start time:21st of May 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A82 NB off slip to Erskine Bridge - Slip Closure

Location:A898 (A82 Northbound Off Slip to Start Of Bridge), Northbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A82 north - circle Dunglass Rbt and take south exit - leave A82 Erskine off slip- end

A82 North of Kingshouse Hotel NB - Road Closure

Location:A82 (Junc To Glenetive to Start Crash Barrier), Northbound

Start time:16th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Via A828 & A85

A82 North of Tyndrum - Convoy

Location:A82 (A85 Jct to Council Bdy), Northbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 Onich NB - TTL

Location:A82 (Kinlochleven Junc B863 to Cuilchenna Ho), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Onich SB - TTL

Location:A82 (Kinlochleven Junc B863 to Cuilchenna Ho), Southbound

Start time:20th of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A82 S/B Stirling Road Exit from Barloan Rbt Lane Closure

Location:A82 (Barloan Rbt to Greenhead Rd), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Traffic Loops

Traffic Management:
Lane Closure.

A82 SB Alexandria Bypass Renton Road Onslip

Location:A82 (Renton Road A812 to 2 Way Split) to A82 (Bridge Over A812 to Leven Bridge), Southbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 diversion (both directions: A811, A813, Stirling Rd,
Diversion for Renton Rd on-slip: Lennox St, Main St, Bank St, North Main St, Luss Rd, A811

A82 SB off slip to Erskine Bridge - Slip Closure

Location:A898 (A82 Southbound Off Slip to A898 Southbound) to A898 (A898 S/Bound to Start Of Bridge), Southbo

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A82 south- leave A82 at slip for mountblow rd- take 1st right and rejoin A82 north- leeave A82 north for erskine br- end

A82 SB Dunglass - Erskine - O/S Lane Closure

Location:A82 (Dunglass Roundabout to Dunglass Roundabout) to A82 (Gavinsburn to A898 Erskine Bridge), Southbo

Start time:16th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing, Sign Installation/Repairs

Traffic Management:
Lane Closure.

A82 SB Erskine Bridge from off slip to A898 Lane Closure

Location:A898 (A898 S/Bound to Start Of Bridge) to M898 (Off Slip To A726 to On Slip From A726), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A82 SB Stirling Rd at Dumbarton - Route part of diversion

Location:A82 (Barloan Rbt to Greenhead Rd) to A82 (Greenhead Rd to A914 Dumbuck), Southbound

Start time:21st of May 2024, 8:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A82 SB off slip to A898 Erskine Bridge Total Closure

Location:A898 (A82 Southbound Off Slip to A898 Southbound) to A898 (A898 S/Bound to Start Of Bridge), Southbo

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Follow Diversion A82 SB - Exit Mountblow Rd - Join A82 NB - exit onto A898 on slip

A82 Sloy Inveruglas SB - TTL

Location:A82 (Tarbet Jct to Loch Sloy Power Stat) to A82 (Loch Sloy Power Stat to Ardlui Station), Southbound

Start time:8th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A82 South of Glencoe Village NB - Convoy Works

Location:A82 (Rd To Clachaig Ho to 09740), Northbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 South of Glencoe Village SB - Convoy Works

Location:A82 (Rd To Clachaig Ho to 09740), Southbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 South of Laggan Swing Bridge Laggan - Stop/Go Works

Location:A82 (Culvert Past Layby to Laggan Swing Br), Southbound

Start time:15th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Spean Bridge NB - TTL

Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Northbound

Start time:3rd of June 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Spean Bridge SB - TTL

Location:A82 (A86 Jct to B8004 Jct) to A82 (Spean Br Sign to A86 Jct), Southbound

Start time:3rd of June 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Stirling Rd Dumbarton NB - Lane Closure

Location:A82 (Greenhead Road to Barloan Roundabout), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A82 Tomnahurich Swing Bridge Inverness NB - Road Closure

Location:A82 (1st Layby Dunain Str to Tomnahurich Br.) to A82 (Tomnahurich Br. to B862 Kenneth St.), Northbou

Start time:13th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Diversion via, B8082 and Torvean Swing Bridge

A82 Tomnahurich Swing Bridge Inverness SB - Road Closure

Location:A82 (Tomnahurich Br. to B862 Kenneth St.) to A82 (1st Layby Dunain Str to Tomnahurich Br.), Southbou

Start time:13th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Diversion via, B8082 and Torvean Swing Bridge

A82 Torlundy NB - TTL

Location:A82 (Torlundy Jct to 500m N Of T/Ldy Junc) to A82 (500m N Of T/Ldy Junc to Gt Glen C/Ranch), Northbo

Start time:15th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Torlundy SB - TTL

Location:A82 (Torlundy Jct to 500m N Of T/Ldy Junc), Southbound

Start time:15th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Tychat North of Drumnadrochit NB - TTL

Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Northbound

Start time:12th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Tychat North of Drumnadrochit SB - TTL

Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Southbound

Start time:12th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Tychat North of Drumndrochit - Stop/Go Works

Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Northbound

Start time:6th of June 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A823(M) Jct 2 S/B. Closure

Location:M823 (A823rbt to Split N/B & S/B Slips) to M90 (M823 O'Bridge to Slip Entry From A921), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Painting Works

Traffic Management:
Road Closure.

Diversion Information:
Continue A823(M) Jct 2 N/B to M90 N/B Jct 3 off-slip then return M90 S/B Jct 3 on-slip.

A823(M) S/B Jct 2. Road Closure.

Location:M823 (A823rbt to Split N/B & S/B Slips) to M90 (M823 O'Bridge to Slip Entry From A921), Southbound

Start time:3rd of June 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
A823(M) EB traffic take M90 Jct 2 NB on-slip, exit at M90 NB Jct 3 Off-slip. Take 5th exit on Halbeath Roundabout to M90 SB Jct 3 on-slip. Take M90 SB Jct 2 off-slip.
Follow A823(M) WB to Pitreavie Roundabout. Take 1st exit onto B980 Kings Rd. Follow Kings Rd SB to Castle Rd roundabout and take 1st exit onto A985 EB Admiralty Rd until Admiralty Roundabout. Take the 3rd exit onto M90 SB Jct 1C on-slip.

A828 Appin - Stop/Go Works

Location:A828 (Achnacona Croft to Jct C27), Northbound

Start time:14th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A828 Barcaldine NB - TTL

Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Northbound

Start time:7th of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Barcaldine SB - TTL

Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Southbound

Start time:7th of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Beinn Sgluish South of Duror - Stop/Go Works

Location:A828 (Milestone to Mile Stone) to A828 (Highland Council Bdy to Inshaig Br), Northbound

Start time:13th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A828 Connel - Stop/Go Works

Location:A85 (Jct Ardnaskie Wood to A85 Jct) to A828 (A85 Jct to Nth Side Connel Br), Northbound

Start time:15th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A828 Kirkton South of Appin NB - TTL

Location:A828 (Creagan Bridge North Roundabout to Achnacona Croft), Northbound

Start time:10th of May 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Kirkton South of Appin NB - TTL

Location:A828 (Creagan Bridge North Roundabout to Achnacona Croft) to A828 (Achnacona Croft to Jct C27), Nort

Start time:11th of June 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Kirkton South of Appin SB - TTL

Location:A828 (Creagan Bridge North Roundabout to Achnacona Croft), Southbound

Start time:10th of May 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Kirkton South of Appin SB - TTL

Location:A828 (Achnacona Croft to Jct C27) to A828 (Creagan Bridge North Roundabout to Achnacona Croft), Sout

Start time:11th of June 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Ledaig North of Connel - Stop/Go Works

Location:A828 (Nth Side Connel Br to Ledaig House), Northbound

Start time:16th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A828 South Craegan Cottage Barcaldine NB - TTL

Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Northbound

Start time:10th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 South Craegan Cottage Barcaldine SB - TTL

Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Aray Bridge Inveraray NB - Road Closure

Location:A83 (Shira Bridge to A819 Jct), Northbound

Start time:16th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
via A82, A85 & A819

A83 Aray Bridge Inveraray SB - Road Closure

Location:A83 (Shira Bridge to A819 Jct), Southbound

Start time:16th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
via A82, A85 & A819

A83 Drishaig to Strone West of Cairndow - Stop/Go Works

Location:A83 (Clachan Fm Acc to Dunderave Castle), Westbound

Start time:13th of June 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A83 Drumore North of Campbeltown - Stop/Go Works

Location:A83 (Airport Junction to Ballywilline Junc), Southbound

Start time:10th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A83 Inveraray NB - TTL

Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Northbound

Start time:21st of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Inveraray SB - TTL

Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Southbound

Start time:21st of May 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Loin Water Arrochar NB - TTL

Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk) to A83 (A814 Jct to R. Loin O/Bridge), Northbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Loin Water Arrochar SB - TTL

Location:A83 (A814 Jct to R. Loin O/Bridge) to A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound

Start time:3rd of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Port Ann Carrick NB - Road Closure with Amnesties

Location:A83 (Abhainn Mhor Br. to Port Ann Acc), Northbound

Start time:23rd of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION
AMNESTIES AT 2000, 2100, 2300, 0100 & 0300

A83 Port Ann Carrick SB - Road Closure with Amnesties

Location:A83 (Abhainn Mhor Br. to Port Ann Acc), Southbound

Start time:23rd of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION
AMNESTIES AT 2000, 2100, 2300, 0100 & 0300

A83 Strone Point North of Inveraray NB - Road Closure

Location:A83 (Dunderave Castle to Shira Bridge), Northbound

Start time:9th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
via A82, A85 & A819

A83 Strone Point North of Inveraray SB - Road Closure

Location:A83 (Dunderave Castle to Shira Bridge), Southbound

Start time:9th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
via A82, A85 & A819

A830 Glenfinnan - Stop/Go Works

Location:A830 (Glenfinnan Sign to Glenfinnan Rly Br), Westbound

Start time:13th of May 2024, 7:00am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A835 Contin EB - TTL

Location:A835 (A834 Jct to Lay-By Past C/Darroch) to A835 (Kinnahaird to A834 Jct), Eastbound

Start time:13th of May 2024, 5:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Contin WB - TTL

Location:A835 (Kinnahaird to A834 Jct) to A835 (A834 Jct to Lay-By Past C/Darroch), Westbound

Start time:13th of May 2024, 5:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Garve EB - TTL

Location:A835 (Garve Level Xing to A832 Gorstan Jct) to A835 (1 Mile West Of Tarvie to Garve Level Xing), Eas

Start time:27th of May 2024, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Garve WB - TTL

Location:A835 (1 Mile West Of Tarvie to Garve Level Xing) to A835 (Garve Level Xing to A832 Gorstan Jct), Wes

Start time:27th of May 2024, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Callander NB - TTL

Location:A84 (A81 Jct to Station Rd) to A84 (Station Rd to Derest Callander Nth), Northbound

Start time:7th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Callander SB - TTL

Location:A84 (Station Rd to Derest Callander Nth) to A84 (A81 Jct to Station Rd), Southbound

Start time:7th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 CorrieChrombie North of Kilmahog NB - TTL

Location:A84 (Coireach/Bie Acc Rd to Car Pk Creag Chrom), Northbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 CorrieChrombie North of Kilmahog SB - TTL

Location:A84 (Coireach/Bie Acc Rd to Car Pk Creag Chrom), Southbound

Start time:13th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Drip Bridge Craigforth NB - TTL

Location:A84 (Craigforth West Rbt to End Of Drip Bridge) to A84 (End Of Drip Bridge to Auction Mart Roundabou

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Drip Bridge Craigforth SB - TTL

Location:A84 (End Of Drip Bridge to Auction Mart Roundabout) to A84 (Craigforth West Rbt to End Of Drip Bridg

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Lochearnhead NB - TTL

Location:A84 (40mph Lochearn/D Sth to A84 Junction), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Lochearnhead SB - TTL

Location:A84 (40mph Lochearn/D Sth to A84 Junction), Southbound

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Strathyre NB - TTL

Location:A84 (30mph Strathyre Sth to Derest Strathyre Nth), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Strathyre SB - TTL

Location:A84 (Derest Strathyre Nth to C33 Balquidder Rd) to A84 (30mph Strathyre Sth to Derest Strathyre Nth)

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Burnbrae Forbrae - Stop/Go Works

Location:A85 (U5 To Keillour (West) to C460 To Madderty), Westbound

Start time:17th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A85 Crianlarich EB - TTL

Location:A85 (A82 Junction to Crianlarich Nrth R/About), Eastbound

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Crianlarich WB - TTL

Location:A85 (A82 Junction to Crianlarich Nrth R/About), Westbound

Start time:27th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Dalmally Hotel EB - TTL

Location:A85 (B8074 Jct Inverlochy to A819 Junction), Eastbound

Start time:5th of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Dalmally Hotel WB - TTL

Location:A85 (B8074 Jct Inverlochy to A819 Junction), Westbound

Start time:5th of June 2024, 7:00am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Drummond Street Comrie - Event

Location:A85 (30 Mph E Of Comrie to B827 Jct), Westbound

Start time:11th of May 2024, 2:55pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A85 Forbrae - Diversion Signage

Location:A85 (U4 To Keillour (East) to U5 To Keillour (West)), Eastbound

Start time:10th of June 2024, 7:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
Portable Traffic Lights (TTLS).

A85 George Street Oban - Vergeworks

Location:A85 (Slipway to Jct Queens Park Place), Eastbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A85 Gilmerton to Methven - Diversion Signage

Location:A85 (A822 Junction to 30 Mph W Of Gilmerton) to A85 (C409 To Glenalmond to Church Road), Eastbound

Start time:11th of May 2024, 7:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A85 Glenogle North of Lochearnhead NB - TTL

Location:A85 (Derest Sign to Stone Culvert), Northbound

Start time:10th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Glenogle North of Lochearnhead SB - TTL

Location:A85 (Derest Sign to Stone Culvert), Southbound

Start time:10th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Lix Toll - Stop/Go Works

Location:A85 (A827 Jct to Gleann Dubh Br.), Westbound

Start time:12th of June 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A85 Loch Awe - Stop/Go Works

Location:A85 (A819 Junction to School Lochawe), Westbound

Start time:28th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A85 Loch Lubhair East of Crianlarich - Stop/Go Works

Location:A85 (Lochdochart House to Benmore Burn Br.), Westbound

Start time:30th of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A85 Oban EB - Event

Location:A85 (Jct Queens Park Place to Jct A816) to A85 (Jct Victoria Cres to Jct Corran Park Mini Rbt), East

Start time:1st of June 2024, 1:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A85 Oban WB - Event

Location:A85 (Jct Corran Park Mini Rbt to Jct William St) to A85 (Jct Queens Park Place to Jct A816), Westbou

Start time:1st of June 2024, 1:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A85 Ochilview Gardens Crieff EB - TTL

Location:A85 (30 Mph E Of Crieff to Dollerie Terrace), Eastbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Ochilview Gardens Crieff WB - TTL

Location:A85 (30 Mph E Of Crieff to Dollerie Terrace), Westbound

Start time:3rd of June 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Orchy Bridge East of Loch Awe EB - TTL

Location:A85 (A819 Junction to School Lochawe), Eastbound

Start time:30th of May 2024, 7:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Orchy Bridge East of Loch Awe WB - TTL

Location:A85 (A819 Junction to School Lochawe), Westbound

Start time:30th of May 2024, 7:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Orchy Bridge Loch Awe EB - TTL

Location:A85 (A819 Junction to School Lochawe), Eastbound

Start time:13th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Orchy Bridge Loch Awe WB - TTL

Location:A85 (A819 Junction to School Lochawe), Westbound

Start time:13th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Quoig West of Crieff EB - TTL

Location:A85 (Rd To Glenturret Distillery to U198 Pb At Quoig), Eastbound

Start time:29th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Quoig West of Crieff WB - TTL

Location:A85 (Rd To Glenturret Distillery to U198 Pb At Quoig), Westbound

Start time:29th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Tibermore to Huntingtower - Signage Only

Location:A85 (U47 Tibbermore to C409 To Glenalmond) to A85 (A85 Rbt West Of A9 to U45 Ruthvenfield), Westboun

Start time:3rd of June 2024, 12:01am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A85 Tyndrum to Oban - MLC

Location:A82 (A85 Jct to Council Bdy) to A85 (Slipway to Jct Queens Park Place), Westbound

Start time:15th of May 2024, 7:30am

Description:Works:
Grass Cutting

Traffic Management:
Mobile Lane Closures.

A85 West of Ross Bridge Comrie EB - Road Closure with Amnesties

Location:A85 (U196 Rd To The Ross to 30 Mph W Of Comrie), Eastbound

Start time:15th of May 2024, 6:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties.

Diversion Information:
Amnesty at 1900, 2100, 2300 and 0100
Alternative Diversion via A822, A823, A84 & A84

A85 West of Ross Bridge Comrie WB - Road Closure with Amnesties

Location:A85 (U196 Rd To The Ross to 30 Mph W Of Comrie), Westbound

Start time:15th of May 2024, 6:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties.

Diversion Information:
Amnesty at 1900, 2100, 2300 and 0100
Alternative Diversion via A822, A823, A84 & A84

A86 Biallidbeg West of Newtonmore - Stop/Go Works

Location:A86 (Speed Derest Newtonmore to Greagdubh Lodge Acc), Westbound

Start time:22nd of May 2024, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A86 Kinloch Laggan East of Aberarder - Stop/Go Works

Location:A86 (Ardverikie Hse Acc to Aberarder Acc), Westbound

Start time:10th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A86 North of Dalwhinnie - Stop/Go Works

Location:A889 (Speed Derest to Allt Breackachy Br.), Southbound

Start time:24th of April 2024, 3:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A86 Rubha Na Magach West of Aberarder - Stop/Go Works

Location:A86 (Rubha Na Magach to Luiblea Access), Westbound

Start time:10th of May 2024, 11:30am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A87 Borve West of Portree EB - TTL

Location:A87 (Speed Derest to A850 Jct), Eastbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Lining Works

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Borve West of Portree WB - TTL

Location:A87 (Speed Derest to A850 Jct), Westbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Lining Works

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Broadford EB - TTL

Location:A87 (B8083 Jct to Speed Derest) to A87 (Speed Derest to U134 Corry Jct), Eastbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Broadford WB - TTL

Location:A87 (B8083 Jct to Speed Derest) to A87 (Speed Derest to U134 Corry Jct), Westbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Kyle of Lochalsh EB - TTL

Location:A87 (Kyle Of Lochalsh 30mph to Jct N To Kyle), Eastbound

Start time:13th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Kyle of Lochalsh WB - TTL

Location:A87 (Kyle Of Lochalsh 30mph to Jct N To Kyle), Westbound

Start time:13th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Kyleakin - Stop/Go Works

Location:A87 (Speed Derestriction to C72 Kylerhea Jct), Westbound

Start time:10th of May 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Stop/Go Boards Traffic Control.

A87 Portree EB - Event

Location:A87 (A850 Jct to B8036 Jct) to A87 (B883 Jct to Speed Rest Portree), Eastbound

Start time:8th of June 2024, 9:00am

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A87 Portree WB - Event

Location:A87 (B883 Jct to Speed Rest Portree) to A87 (A850 Jct to B8036 Jct), Westbound

Start time:8th of June 2024, 9:00am

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A87 Sconser EB - TTL

Location:A87 (U100 Moll Jct to A863 Jct), Eastbound

Start time:28th of May 2024, 7:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A87 Sconser WB - TTL

Location:A87 (U100 Moll Jct to A863 Jct), Westbound

Start time:28th of May 2024, 7:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A87 Sligachan - Stop/Go Works

Location:A87 (A863 Jct to Allt Dubh Br.) to A87 (Allt Dubh Br. to Lon Nan Airign Br.), Westbound

Start time:14th of May 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A87 Strollamus West of Broadford - Stop/Go Works

Location:A87 (U134 Corry Jct to Track To Strollamus) to A87 (Track To Strollamus to U120 Luib Jct), Westbound

Start time:13th of May 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Stop/Go Boards Traffic Control.

A876 - E/B - Kincardine - Closure

Location:A985 (A876 Junction to Start Of Eb 3 Lane Section) to A876 (2 Lane Cway Merge to A977 Jct Kincardine

Start time:20th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
WB – Longannet Roundabout – A977 Toll Road – Feregait – Kilbagie Roundabout – A876 Clackmannanshire Bridge – Higgins Neuk Roundabout

EB – A876 Higgins Neuk – Clackmannanshire Bridge – A977 Kilbaggie Roundabout – Feregait – Toll Road – Longannet Roundabout

The diversion will add 3.7miles and 6minutes of travelling time.

A876 - W/B - Kincardine - Closure

Location:A876 (2 Lane Cway Merge to A977 Jct Kincardine Town Centre) to A985 (Sw End Of Kincardine Bridge to

Start time:20th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
WB – Longannet Roundabout – A977 Toll Road – Feregait – Kilbagie Roundabout – A876 Clackmannanshire Bridge – Higgins Neuk Roundabout

EB – A876 Higgins Neuk – Clackmannanshire Bridge – A977 Kilbaggie Roundabout – Feregait – Toll Road – Longannet Roundabout

The diversion will add 3.7miles and 6minutes of travelling time.

A889 Dochaid Abhacain Dalwhinnie - TTL

Location:A889 (A9 Jct to Speed Rest), Southbound

Start time:1st of June 2024, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A898 NB Erskine Bridge - Lane Closure

Location:A898 (Start Of Bridge to End Of Bridge) to A898 (A898 Northbound Off Slip to A82 Northbound), Northb

Start time:16th of May 2024, 8:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Lane Closure.

A898 NB Offslip - A82 NB - Total Closure

Location:A898 (A898 Northbound Off Slip to A82 Northbound), Northbound

Start time:16th of May 2024, 10:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Continue A898 - SB Offslip to A82 Great Western Rd - A810 junction at Duntocher take left to join the A810 and continue on Dumbarton Road – straight ahead 2nd exit at Hardgate roundabout continuing on Glasgow Road and Duntocher Road to the B8050 junction (Baljaffray Road) – take left follow B8050 to roundabout at Stockiemuir Road - take first left onto A809 – continue on A809 via Craigton Village and Croftamie to A811 junction at Drymen Bridge – take left and follow A811 via Gartocharn and Balloch to rejoin A82 at Stoneymollan Roundabout.

A898 SB on slip to A82 SB Slip Closure

Location:A898 (A898 Northbound Off Slip to A82 Southbound), Southbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A82 north to dunglass rbt- circle rbt and rejoin A82 south- end

A898 off slip from Erskine Br to A82 NB - Slip Closure

Location:A898 (A898 Northbound Off Slip to A82 Northbound), Northbound

Start time:23rd of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A82 south Great Western Rd - leave A82 at next exit for Mountblow Rd - take 1st right for A82 north- end

A9 A820 off slip to B8033 overbridge - N/B Lane closure

Location:A9 (A820 O'Bridge to On Slip From A820) to A9 (B8033 Junction to Council Bdy), Northbound

Start time:9th of June 2024, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Aberuthven- Contraflow N/B

Location:A9 (A824 Jct Aberuthven to Burnside Lodge), Northbound

Start time:20th of May 2024, 7:30pm

Description:Works:
Structural Repairs

Traffic Management:
20/05/2024 - Convoy Working( 30mph), 21/05/2024 - Convoy Working( 30mph), 21/05/2024 - Convoy Working( 30mph), 22/05/2024 - Convoy Working( 30mph), 22/05/2024 - Convoy Working( 30mph), 23/05/2024 - Convoy Working( 30mph), 23/05/2024 - Convoy Working( 30mph), 24/05/2024 - Convoy Working( 30mph), 24/05/2024 - Contraflow( 50mph), 25/05/2024 - Contraflow( 50mph), 26/05/2024 - Contraflow( 50mph), 27/05/2024 - Contraflow( 50mph)

A9 Aberuthven- Contraflow S/B

Location:A9 (Burnside Lodge to Aberuthven Jct), Southbound

Start time:24th of May 2024, 7:30pm

Description:Works:
Structural Repairs

Traffic Management:
Contraflow (50mph)

A9 Allan Water, Dunblane - S/B lane 1 closures

Location:A9 (B8033 Junction to Off Slip To A820) to A9 (Council Bdy to B8033 Junction), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A9 Auchterarder- Lane Convoy S/B

Location:A9 (Abbey Rd Br. to Auchterarder Jct), Southbound

Start time:17th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A9 Ballinluig NB - Lane Closure

Location:A9 (Jct (R) To Guay to Start Of Dual Cway) to A9 (Slip Off From A9 To A827 Rbt to A827 Rbt), Northbo

Start time:14th of May 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure (30mph)

A9 Blackford- Lane Closure N/B

Location:A9 (A822 Jct to U/C To Tarneybackle), Northbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A9 Brora NB - TTL

Location:A9 (War Meml Jct to Golf Road Jct) to A9 (Golf Road Jct to Mill Jct), Northbound

Start time:10th of June 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Brora SB - TTL

Location:A9 (Golf Road Jct to Mill Jct) to A9 (Fountain Sq to War Meml Jct), Southbound

Start time:10th of June 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamein South of Drumochter NB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamein South of Drumochter SB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnaspidal North of Drumochter - Convoy Works

Location:A9 (End Dual Nb to Council Bdy), Northbound

Start time:26th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A9 Dalraddy Aviemore to Slochd - Vergeworks

Location:A9 (B9150 Aviemore Jct to A95 Granish Jct) to A9 (Slochd Jct to Start Dual C'Way), Northbound

Start time:27th of May 2024, 11:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Delny Invergordon NB - TTL

Location:A9 (Smelter Junction Tomich to B817 Kildary Junction), Northbound

Start time:21st of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Delny Invergordon SB - TTL

Location:A9 (Smelter Junction Tomich to B817 Kildary Junction), Southbound

Start time:21st of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dornoch Bridge NB - TTL

Location:A9 (Dornoch Br Rbt to Start Dornoch Br) to A9 (Dornoch Br (N) to Clashmore Jct), Northbound

Start time:15th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dornoch Bridge SB - TTL

Location:A9 (Dornoch Br (N) to Clashmore Jct) to A9 (Dornoch Br Rbt to Start Dornoch Br), Southbound

Start time:15th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Drumlochty,Blackford- Convoy S/B

Location:A9 (A823 Flyover to B8081 Blackford), Southbound

Start time:15th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A9 Drumochter Dual North End SB - Convoy Works

Location:A9 (Start Of Dual to Trinafour Jct), Southbound

Start time:2nd of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A9 Drumochter NB - Convoy Works

Location:A9 (Start Dual Calvine to Trinafour Jct) to A9 (Trinafour Jct to End Dual Nb), Northbound

Start time:13th of May 2024, 7:00pm

Description:Works:
Lining Works

Traffic Management:
Convoy Working (10mph)

A9 Drumochter SB - Convoy Works

Location:A9 (Start Dual Calvine to Trinafour Jct) to A9 (Trinafour Jct to End Dual Nb), Northbound

Start time:23rd of May 2024, 7:00pm

Description:Works:
Lining Works

Traffic Management:
Convoy Working (10mph)

A9 Dulnain Bridge Carrbridge NB - TTL

Location:A9 (End Of Climbing Lane to River Dulnain) to A9 (River Dulnain to A938 Carrbridge Jct), Northbound

Start time:19th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dulnain Bridge Carrbridge SB - TTL

Location:A9 (River Dulnain to A938 Carrbridge Jct) to A9 (End Of Climbing Lane to River Dulnain), Southbound

Start time:19th of May 2024, 8:00am

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dunbeath NB - Road Closure with Amnesties

Location:A9 (Jct Braemore to Jct At Achavrole), Northbound

Start time:22nd of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 and 0400

A9 Dunbeath SB - Road Closure with Amnesties

Location:A9 (Jct Braemore to Jct At Achavrole), Southbound

Start time:22nd of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 and 0400

A9 Faskally Pitlochry Offslip NB - Slip Closure

Location:A9 (End Of Dual to Start Of Dual) to A9 (Slip Off to T-Junction), Northbound

Start time:12th of May 2024, 4:30am

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A9 Faskally Pitlochry Offslip SB - Slip Closure

Location:A9 (End Of Dual to Start Of Faskally Single Cway) to A9 (Slip Off to Junction With A924), Southbound

Start time:12th of May 2024, 4:30am

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A9 Georgemass Jnct NB - Road Closure with Amnesties

Location:A9 (Jct C4 Achalone to A882 Jct Georgemas) to A9 (A882 Jct Georgemas to Jct Hilliclay), Northbound

Start time:21st of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 and 0400

A9 Georgemass Jnct SB - Road Closure with Amnesties

Location:A9 (A882 Jct Georgemas to Jct Hilliclay) to A9 (Jct C4 Achalone to A882 Jct Georgemas), Southbound

Start time:21st of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

A9 Glassingall, Dunblane - N/B Lane 2 closure

Location:A9 (B8033 Junction to Council Bdy), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Glassingall, Dunblane - S/B Lane 2 closure

Location:A9 (Council Bdy to B8033 Junction), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Glassingall, Nth of Dunblane - S/B lane 1 closures

Location:A9 (Council Bdy to B8033 Junction), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A9 Glassingall- Convoy- N/B

Location:A9 (B8033 Junction to Council Bdy), Northbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A9 Granish to Moy - Vergeworks

Location:A9 (B9150 Aviemore Jct to A95 Granish Jct) to A9 (Forrest Access to Start Dual Cway), Northbound

Start time:15th of May 2024, 11:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Helmsdale NB - TTL

Location:A9 (Gartymore Jct to A897 Jct), Northbound

Start time:17th of May 2024, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A9 Helmsdale SB - TTL

Location:A9 (Gartymore Jct to A897 Jct), Southbound

Start time:17th of May 2024, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A9 Inveralmond Perth to Calvine NB - Signage

Location:A9 (Inveralmond Rbt to Off Slip To A85) to A9 (Trinafour Jct to End Dual Nb), Northbound

Start time:11th of May 2024, 11:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Inveralmond Perth to Calvine SB - Signage

Location:A9 (Start Of Dual to Trinafour Jct) to A9 (End Dual Cway to Inveralmond Rbt), Southbound

Start time:11th of May 2024, 11:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Kincraig House Hotel Alness NB - TTL

Location:A9 (B817 Dalmore Jct to Smelter Junction Tomich), Northbound

Start time:10th of May 2024, 11:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Kincraig House Hotel Alness SB - TTL

Location:A9 (B817 Dalmore Jct to Smelter Junction Tomich), Southbound

Start time:10th of May 2024, 11:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Kinveachy North of Aviemore NB - TTL

Location:A9 (Track Avielochan to Kinveachy) to A9 (Kinveachy to Track Lhs (Kinveachy Ldge)), Northbound

Start time:3rd of June 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Kinveachy North of Aviemore SB - TTL

Location:A9 (Kinveachy to Track Lhs (Kinveachy Ldge)) to A9 (Track Avielochan to Kinveachy), Southbound

Start time:3rd of June 2024, 9:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Latheronwheel South of Latheron NB - TTL

Location:A9 (Latheronwheel Ho to Jct A Latheron), Northbound

Start time:13th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Latheronwheel South of Latheron SB - TTL

Location:A9 (Latheronwheel Ho to Jct A Latheron), Southbound

Start time:13th of June 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Luncarty to Birnam NB - Lane Closure

Location:A9 (Inveralmond Rbt to End Dual Cway) to A9 (Start Of Dual Cway to End Of Dual Carriageway), Northbo

Start time:27th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A9 Luncarty to Birnam SB - Lane Closure

Location:A9 (Start Of Dual to End Of Dual) to A9 (End Dual Cway to Inveralmond Rbt), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

A9 Lynchat Kingussie NB - TTL

Location:A9 (A86 Kingussie Jct to Croft Carnoch), Northbound

Start time:10th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Lynchat Kingussie SB - TTL

Location:A9 (A86 Kingussie Jct to Croft Carnoch), Southbound

Start time:10th of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 North End of Bankfoot Dual SB - Lane Closure

Location:A9 (Start Of Dual to End Of Dual), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure (50mph)

A9 Pitlochry NB - Lane Closure

Location:A9 (A827 Jct to A924 Off Slip) to A9 (A924 Off Slip to End Of Dual Cway), Northbound

Start time:14th of May 2024, 1:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure (50mph)

A9 Pitlochry NB - TTL

Location:A9 (End Of Dual to Start Of Dual), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Pitlochry Offslip NB - Signage

Location:A9 (W/B Off Slip - 1 Lane to W/B Off Slip - 2 Lane) to A9 (Start Of 1 Lane to End Of 1 Lane), Northb

Start time:11th of May 2024, 11:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Pitlochry Offslip NB - Slip Closure

Location:A9 (A827 Jct to A924 Off Slip) to A9 (Start Of 1 Lane to End Of 1 Lane), Northbound

Start time:10th of June 2024, 7:00am

Description:Works:
Ancillary Works

Traffic Management:
Road Closure.

A9 Pitlochry Onslip SB - Signage

Location:A9 (Start Of 1 Lane to End Of 1 Lane) to A9 (Entry Slip From A924 to A827 Jct), Southbound

Start time:11th of May 2024, 11:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Pitlochry SB - TTL

Location:A9 (End Of Dual to Start Of Dual), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Portgower NB - TTL

Location:A9 (Old Sch Ho Portgower to Gartymore Jct), Northbound

Start time:20th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Portgower SB - TTL

Location:A9 (Old Sch Ho Portgower to Gartymore Jct), Southbound

Start time:20th of May 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Scrabster NB - TTL

Location:A9 (A836 Scrabster Jct to Ferry Terml (10mph)), Northbound

Start time:13th of May 2024, 7:00am

Description:Works:
Ancillary Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Scrabster SB - TTL

Location:A9 (A836 Scrabster Jct to Ferry Terml (10mph)), Southbound

Start time:13th of May 2024, 7:00am

Description:Works:
Ancillary Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Slochd NB - TTL

Location:A9 (Slochd Jct to Start Dual C'Way), Northbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Slochd SB - TTL

Location:A9 (Slochd Jct to Start Dual C'Way), Southbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 South if Bridge of Tacher Achavanich - Convoy Works

Location:A9 (Jct C14 Loch Stemster to Br Of Tacher) to A9 (Br Of Tacher to Jct B870 Mybster), Northbound

Start time:27th of May 2024, 7:00am

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A9 South of Achrimsdale Brora NB - Road Closure with Amnesties

Location:A9 (S Dalchalm Jct to S End Colliburn Imp), Northbound

Start time:19th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION -

Amnesties at 2000, 2100, 2200, 2300, 0000, 0200, 0400

A9 South of Achrimsdale Brora SB - Road Closure with Amnesties

Location:A9 (S Dalchalm Jct to S End Colliburn Imp), Southbound

Start time:19th of May 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION -

Amnesties at 2000, 2100, 2200, 2300, 0000, 0200, 0400

A9 South of Blackford- Convoy N/B

Location:A9 (U/C To Tarneybackle to B8081 Blackford), Northbound

Start time:15th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A9 Tomatin NB - Lane Closure

Location:A9 (Start Dual C'Way to R Findhorn Br) to A9 (R Findhorn Br to Start Single C'Way), Northbound

Start time:13th of May 2024, 7:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Lane Closure (50mph)

A9 Tomatin NB - TTL

Location:A9 (Tomatin Jct to Ruthven Jct), Northbound

Start time:10th of May 2024, 9:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Tomatin NB - TTL

Location:A9 (Tomatin Jct to Ruthven Jct), Northbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Tomatin SB - Lane Closure

Location:A9 (N End Dual to R Findhorn) to A9 (Slochd Jct to Start Dual C'Way), Southbound

Start time:9th of June 2024, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Lane Closure (50mph)

A9 Tomatin SB - TTL

Location:A9 (Tomatin Jct to Ruthven Jct), Southbound

Start time:10th of May 2024, 9:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Tomatin SB - TTL

Location:A9 (Tomatin Jct to Ruthven Jct), Southbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 off slip to B8033, Dunblane - slip closure

Location:A9 (On Slip From A820 to B8033 Junction) to A9 (Island Nosing to T Junction), Northbound

Start time:9th of June 2024, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

A90 Auchiries NB - Temporary traffic signals

Location:A90 (Jct Hatton to Jct Teuchan) to A90 (Jn X Teuchan/Cruden Bay to Jn R A975), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Ellon- TTL-N/B

Location:A90 (Ellon Roundabout South to Ellon Roundabout North), Northbound

Start time:3rd of June 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Ellon- TTL-S/B

Location:A90 (Ellon Roundabout South to Ellon Roundabout North), Southbound

Start time:3rd of June 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Fintry Road Roundabout NB - Lane closure

Location:A90 (Fintry Rd Rbt to Fintry Rd Rbt), Northbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A90 Fodoun NB - Lane closure

Location:A90 (A937 Jct (N) L'Kirk to Jct (L) Lr Powburn), Northbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A90 Forfar Bypass -Convoy N/B

Location:A90 (A932 Jct to A94 Jct), Northbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Convoy Working.

A90 Forfar No Obstruction N/B

Location:A90 (A932 Jct to A94 Jct), Northbound

Start time:21st of May 2024, 10:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Forfar No Obstruction S/B

Location:A90 (A94 Jct to A932 Jct), Southbound

Start time:21st of May 2024, 10:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Fraserburgh NB - Diversion signage for local road closure

Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs) to A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S))

Start time:3rd of June 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Gask, North of Hatton- TTL S/B

Location:A90 (Jct Hatton to Jct Teuchan), Southbound

Start time:14th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Glendoick NB - Hard shoulder closure

Location:A90 (Start Of Exit Slip to Start Of Two-Way Slip), Northbound

Start time:17th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Hard Shoulder Closure.

A90 Happas junction NB - Lane closure

Location:A90 (A928 Kirrie Jct to South Tarbrax Jct), Northbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A90 Kinfauns- Lane Closure N/B

Location:A90 (Kinfauns Jct to Off Slip B958), Northbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A90 Laurencekirk- Signage Only N/B

Location:A90 (B974 Jct Fettercairn to A937 Jct (S)) to A90 (A937 Jct (S) to B9120 Jct), Northbound

Start time:13th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Longhaven- Diversion Signage Only N/B

Location:A90 (Jct Hatton to Jct Teuchan) to A90 (Jn X Teuchan/Cruden Bay to Jn R A975), Northbound

Start time:27th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Longhaven- TTL N/B

Location:A90 (Jn X Teuchan/Cruden Bay to Jn R A975), Northbound

Start time:14th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Lonmay TTL S/B

Location:A90 (Jn R B9033 St. Combs to Start Of One Way (Wb)), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 North Rd, Peterhead- TTL N/B

Location:A90 (A982 North Rd to Jn L Kirktown), Northbound

Start time:10th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 North of Ellon- TTL N/B

Location:A90 (Ellon Roundabout North to Jcn (L) To Leys), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Peterhead - Diversionary Signage

Location:A90 (A950 Rbt to A982 North Rd) to A90 (Invernettie Rbt to A950 Rbt), Northbound

Start time:27th of May 2024, 9:30am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Peterhead Bypass - Diversion signage

Location:A90 (Invernettie Rbt to A950 Rbt) to A90 (A950 Rbt to A950 Rbt), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Peterhead- Diversion signage N/B

Location:A90 (Jn R B9108 Boddam to Invernettie Rbt) to A90 (Invernettie Rbt to A950 Rbt), Northbound

Start time:13th of June 2024, 6:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Peterhead- signage only S/B

Location:A90 (Jn R Leask to Jn X Hatton) to A90 (Jn A952 Toll Of Birness to Jn R Leask), Southbound

Start time:20th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Rathen- TTL N/B

Location:A90 (Jn T A952 Cortes to Jn L B9032 Memsie) to A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S))

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 St Fergus to Crimond - Diversion signage for local road closure

Location:A90 (A982 North Rd to Jn L Kirktown) to A90 (Jn R Starnafin to Jn R B9033 St.Combs), Northbound

Start time:27th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 St Madoes- lane Closure S/B

Location:A90 (Pitroddie Jct to B958 Glencarse) to A90 (Off Slip B958 to Pitroddie Fm Jct), Southbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Convoy Working.

A90 Stonehaven - N/B Lane 2 closure

Location:A90 (Jct (L) Auchenblae to Slip Rd L B979), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A90 Stonehaven - S/B Lane 2 closure

Location:A90 (Nb Slip Rd B979 to Jct (L) Spurryhillock), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A90 Stonehaven Rail Br- Lane Closure N/B

Location:A90 (On Slip From A92 to Jct (L) Auchenblae) to A90 (Jct (L) Auchenblae to Slip Rd L B979), Northbou

Start time:20th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A90 Stonehaven Rail Br- Lane Closure S/B

Location:A90 (Nb Slip Rd B979 to Jct (L) Spurryhillock) to A90 (Jct (L) Spurryhillock to Off Slip To A92), So

Start time:20th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A90 Toll of Birness, Hatton- TTL N/B

Location:A90 (Jn A952 Toll Of Birness to Jn R Leask), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Toll of Birness- TTL S/B

Location:A90 (Jct Leys to Jn A952 Toll Of Birness), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A90 northbound and southbound between Tipperty and Ellon Roundabout - lane 2 closures

Location:A90 (Start Dual Cway to Ellon Rbt (S)), Northbound

Start time:10th of May 2024, 9:30am

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A90/C9k Nth of Drumnagari, Laurencekirk - Off Slip closure

Location:A90 (B974 Jct Fettercairn to A937 Jct (S)), Northbound

Start time:22nd of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

Diversion Information:
N/B traffic diverted off A90 at B794 To Sauchieburn

A90/C9k Nth of Drumnagari, Laurencekirk - S/B right turn crossover closed.

Location:A90 (Jct A937 Montrose to Jct B974 Marykirk), Northbound

Start time:22nd of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

Diversion Information:
S/B traffic diverted off at A937 south of Laurencekirk onto B9120

A9000 (Forth Road Bridge) - NB - Lane closure

Location:A90 (Echline Ob to Forth Rd Bridge) to A90 (Frb Start Nb to Frb End), Northbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure (50mph)

A92 Annsmuir to Melville Lodges Roundabout NB - Temporary traffic signals

Location:A92 (Jct Q62 Angle Park to Np Melville Lodges Rbt), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A92 Cowdenbeath on slip closure N/B

Location:A92 (A909 Over Bridge (N) to On Slip From A909) to A92 (On Slip From A909 to Emergency Gap C/R), Nor

Start time:10th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic to head south on A92 to Crossgates roundabout, take the 2nd exit A92 Northbound and return to Cowdenbeath.

A92 Cowdenbeath to Lochgelly- Contraflow N/B

Location:A92 (On Slip From A909 to Emergency Gap C/R) to A92 (Emergency Gap C/R to Off Slip B9149), Northboun

Start time:10th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Contraflow (30mph)

A92 Cowdenbeath to Lochgelly- Contraflow S/B

Location:A92 (Emergency Open to Off Slip To A909), Southbound

Start time:10th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Contraflow (30mph)

A92 East Dock Street SB - Lane closure

Location:A92 (East Marketgait Jn to Broughty Ferry Rd), Southbound

Start time:10th of June 2024, 8:30am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A92 Greendykes Road. N/B Road Closure

Location:A92 (Greendykes Rd to Craigie Ave Rbt), Northbound

Start time:30th of May 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Road Closure.

Diversion Information:
N/B via Dalgleish Rd to Arbroath Rd. S/B via Craigie Avenue to Greendykes Rd

A92 Kingsway, Dundee- Lane Closure S/B

Location:A972 (East Milton Rbt to Pitkerro Rd Rbt), Southbound

Start time:10th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A92 Ladybank NB - Diversion signage for local road closure

Location:A92 (Jct B937 Newburgh to Jct Q61 Charlottetown) to A92 (Jct Q61 Charlottetown to Jct Q62 Angle Park

Start time:9th of June 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A92 Lochgelly Off Slip- Closure N/B

Location:A92 (Off Slip To B9149 to B9149 Crossroads), Northbound

Start time:10th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Continue Northbound to Chapel Interchange, take the off slip then the on slip returning to Lochgelly Southbound, and exit on the Southbound off slip.

A95 Advie- TTL N/B

Location:A95 (C49 Advie Stat Rd to Moray Boundary), Northbound

Start time:21st of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Advie- TTL N/B

Location:A95 (Haughs Cromdale Rd to C49 Advie Stat Rd), Northbound

Start time:21st of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Bridge of Avon - TTL S/B

Location:A95 (B9137 Cragganmore to B9008 Tomintoul), Southbound

Start time:22nd of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Drumuillie NB - Temporary traffic signals

Location:A95 (C39 Boat Of Garten to C36 Skye Of Curr Rd), Northbound

Start time:10th of June 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Mulben- TTL N/B

Location:A95 (Mulben Xroads to C54 Muldearie Rd), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Traffic Management Training

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Speybridge- TTL N/B

Location:A95 (B719 Jct to A939 Junction) to A95 (A939 Junction to Sp Rest Sign Cromdale), Northbound

Start time:22nd of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Alves EB - Diversion signage for local road closure

Location:A96 (Jct Alves Church to Jct Kinloss) to A96 (Jct B9013 Burghead to Kinfauns Jct), Eastbound

Start time:21st of May 2024, 8:00am

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A96 Blackhall Roundabout, Inverurie - Lane Narrowing

Location:A96 (Blackhall Rbt (E) to Blackhall Rbt (E)), Westbound

Start time:11th of May 2024, 7:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
Lane Closure.

A96 Brodie WB - Diversion signage for local road closure

Location:A96 (Jct Earnhill to Jct Dyke/Kintessack) to A96 (Highland Bdy to B9101 Auldearn Jn), Westbound

Start time:28th of May 2024, 7:00pm

Description:Works:
Utility Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A96 Cairnie EB - TTL's

Location:A96 (End Climb Lane to Jct Cairnie), Eastbound

Start time:20th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Clinterty WB - Lane closure

Location:A96 (Jct (L) B979 to Jct Clinterty Roundabout), Westbound

Start time:14th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A96 Delnies EB - Temporary traffic signals

Location:A96 (X-Rds At Tradespark to District Boundary), Eastbound

Start time:11th of June 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Don Bridge, Inverurie- TTL W/B

Location:A96 (Inverurie Rbt (W) to Blackhall Rbt (E)), Westbound

Start time:16th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Drimmies - Diversion Signs

Location:A96 (Jct Brandsbott to Jct Whiteford), Northbound

Start time:13th of June 2024, 6:00am

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

A96 East of Auldearn - TTL's

Location:A96 (Jct Feddan to Highland Bdy) to A96 (Jct Dyke Of Brodie to Jct Feddan), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Elgin - Diversion signage only

Location:A96 (Dr. Grays Roundabout to Dr. Grays Roundabout) to A96 (Northfield Rbt to Northfield Rbt), Eastbo

Start time:16th of May 2024, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A96 Huntly Bypass- TTL N/B

Location:A96 (Jct Battlehill to River Bogie Br (E)), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Huntly Railway Bridge EB - Temporary traffic signals

Location:A96 (River Bogie Br (W) to Huntly Rbt) to A96 (Jct Battlehill to River Bogie Br (E)), Eastbound

Start time:10th of June 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Huntly- TTL W/B

Location:A96 (Start Newongarry Climbing Lane to Jct A97 Banff), Westbound

Start time:20th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Inch Jcn, South of Huntly- TTL E/B

Location:A96 (End Climbing Lane to End Climbing Lane), Eastbound

Start time:10th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Inveramsay, Pitcaple- TTL E/B

Location:A96 (Jct Brandsbott to Jct Whiteford), Eastbound

Start time:16th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Kinellar WB - Lane closure

Location:A96 (Kinellar Rbt to Broomhill Rbt), Westbound

Start time:15th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A96 Layby Pitcaple- TTL E/B

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork) to A96 (Jct Brandsbott to Jct Whiteford), Eastbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Leys of Dummuies, Huntly - Diversion Signage

Location:A96 (Huntly Rbt to Huntly Rbt) to A96 (Start Newongarry Climbing Lane to Jct A97 Banff), Eastbound

Start time:3rd of June 2024, 10:00pm

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A96 Newton of Forgie WB - Temporary traffic signals

Location:A96 (Jct B9017 Newmill to Jn R B9016 Buckie) to A96 (Jn R B9016 Buckie to Jct Mulben), Westbound

Start time:13th of May 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Newtongarry, Huntly- Convoy N/B

Location:A96 (Start Newongarry Climbing Lane to Jct A97 Banff), Northbound

Start time:12th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A96 Newtongarry, Huntly- Convoy S/B

Location:A96 (Start Newongarry Climbing Lane to Jct A97 Banff), Southbound

Start time:12th of May 2024, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

Diversion Information:
When works are taking place across the Drumblade/Gartly junction, local traffic should use the A97.

When works are taking place across the Gartly junction, traffic should follow the A96 north to Huntly then turn left onto the Old Military Road to Gartly.

A96 Oyne Fork- TTL W/B

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork), Westbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Pitcaple- TTL E/B

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork) to A96 (Jct Brandsbott to Jct Whiteford), Eastbound

Start time:15th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Pitcaple- TTL E/B

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork), Eastbound

Start time:17th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Pitcaple- TTL E/B

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork), Eastbound

Start time:17th of May 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A96 South of Huntly- TTL E/B

Location:A96 (Start Newongarry Climbing Lane to Jct A97 Banff) to A96 (End Climbing Lane to End Climbing Lane

Start time:20th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A96 at Sandown Road Junction WB - Temporary traffic signals

Location:A96 (Nairn Mini Rbt to X-Rds At Tradespark) to A96 (X-Rds At Tradespark to District Boundary), Westb

Start time:15th of May 2024, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96- Huntly- TTL N/B

Location:A96 (Jct B9022 Portsoy to St Climb Lane), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A972 Pitkerro Rbt, Kingsway East, Dundee - E/B Lane 2 closure

Location:A972 (Pitkerro Rd Rbt to East Milton Rbt), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A972 Pitkerro Rbt, Kingsway East, Dundee - W/B Lane 2 closure

Location:A972 (East Milton Rbt to Pitkerro Rd Rbt) to A972 (Pitkerro Rd Rbt to Pitkerro Rd Rbt), Westbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A985 - E/B - Higgins Neuk to Longannet - Closure

Location:A985 (Higgins Neuk Roundabout to Kincardine Bridge) to A985 (Start Wb 3 Lane Sect to Longannet Road

Start time:20th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
WB – Longannet Roundabout – A977 Toll Road – Feregait – Kilbagie Roundabout – A876 Clackmannanshire Bridge – Higgins Neuk Roundabout

EB – A876 Higgins Neuk – Clackmannanshire Bridge – A977 Kilbaggie Roundabout – Feregait – Toll Road – Longannet Roundabout

The diversion will add 3.7miles and 6minutes of travelling time.

A985 - W/B - Longannet to Higgins Neuk- Closure

Location:A985 (Start Wb 3 Lane Sect to Longannet Road Roundabout) to A985 (Higgins Neuk Roundabout to Kincard

Start time:20th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
WB – Longannet Roundabout – A977 Toll Road – Feregait – Kilbagie Roundabout – A876 Clackmannanshire Bridge – Higgins Neuk Roundabout

EB – A876 Higgins Neuk – Clackmannanshire Bridge – A977 Kilbaggie Roundabout – Feregait – Toll Road – Longannet Roundabout

The diversion will add 3.7miles and 6minutes of travelling time.

A985 E/B Cairneyhill Roundabout. Temporary Traffic Lights

Location:A985 (2nd Layby East Of C38 to Cairneyhill Roundabout At D13) to A985 (Cairneyhill Roundabout At D13

Start time:14th of May 2024, 7:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A985 E/B Cairneyhill to Crombie. Temporary Traffic Lights.

Location:A985 (Cairneyhill Rbt to Jr D14 Crombie Pt), Eastbound

Start time:31st of May 2024, 9:30am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A985 W/B Cairneyhill Roundabout. Temporary Traffic Lights

Location:A985 (Cairneyhill Rbt to Jr D14 Crombie Pt) to A985 (Cairneyhill Roundabout At D13 to Cairneyhill Ro

Start time:14th of May 2024, 7:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A985 W/B Crombie to Cairneyhill. Temporary Traffic Lights.

Location:A985 (Cairneyhill Rbt to Jr D14 Crombie Pt), Westbound

Start time:31st of May 2024, 9:30am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A99 Reisgill Lybster NB - TTL

Location:A99 (X-Rds Before Swiney to X-Rds Lybster), Northbound

Start time:17th of May 2024, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A99 Reisgill Lybster SB - TTL

Location:A99 (X-Rds Before Swiney to X-Rds Lybster), Southbound

Start time:17th of May 2024, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

M73 Northbound Junction 2 Baillieston on-slip -Total closure

Location:A8 (Baillieston Int Rbt to Baillieston Int Rbt) to M73 (A8 Bailleston Rbt to On Slip M73 (Nb)), Nort

Start time:15th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 SB, Daldowie, M73 NB

M73 Northbound Junction 2 on-slip - Total closure

Location:M73 (A8 Bailleston Rbt to On Slip M73 (Nb)), Northbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M73 Southbound junction 2 on-slip, M73 SB to M74 NB link road, Daldowie off-slip & Return North onto M73

M73 Northbound Junction 2 to Junction 2A - Nearside lane closure

Location:M73 (N/B Baillieston Int to N/B Gartcosh Off Slip), Northbound

Start time:31st of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M73 Northbound Junction 2 to Junction 2A - Offside lane closure

Location:M73 (N/B Baillieston Int to N/B Gartcosh Off Slip), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M73 Southbound Junction 2 Baillieston off-slip - Total closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Southbound

Start time:10th of May 2024, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 SB, Daldowie, M73 northbound, Baillieston Interchange.

M73 Southbound Junction 2 off-slip - Total closure

Location:M73 (S/B Gartcosh Int On Ramp to Baillieston Interchange) to M73 (Off Slip From M73 to A8 Bailleston

Start time:20th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M73 Southbound, M73 SB to M74 NB link road, Daldowie off-slip & Return North onto M73

M73 Southbound Junction 2 off-slip - Total closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
M73 S/B to Daldowie, return N/B to Baillieston

M73 Southbound Junction 2A to Junction 2 - Offside lane closure

Location:M73 (S/B Gartcosh Int On Ramp to Baillieston Interchange), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M73 Southbound to M74 Northbound link road - Total closure

Location:M73 (M73 Jn 1 Off-Slip to End Two-Lane Slip) to M74 (Start Of Dedicated Slip to End Of Dedicated Sli

Start time:10th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 SB Link road to M74 SB, M74 SB Jct 5 Offslip, M74 NB Jct 5 Onslip.

M73 Southbound to M74 Southbound - Total closure

Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M74 (Blantype Farm Rd O/B to Fallside Rd O/B),

Start time:3rd of June 2024, 8:00pm

Description:Works:
High Friction Works

Traffic Management:
Road Closure.

Diversion Information:
M73 Southbound to M74 Northbound Link road, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip, M74 Southbound

M73 Southbound to M74 Southbound link road - Total closure

Location:M73 (M73 Jn 1 Off-Slip to End Two-Lane Slip) to M74 (Blantype Farm Rd O/B to Fallside Rd O/B), South

Start time:12th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 SB Link road to M74 NB, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip

M73 Southbound to M74 Southbound link road - Total closure

Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M74 (Start Of Hs to Blantype Farm Rd O/B), Sou

Start time:3rd of June 2024, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
M73 SB Link road to M74 NB, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip.

M74 EB Between Jct3a and 2a - Route Part of Diversion

Location:M74 (A74 Rbt to Start Of M74) to M74 (A763 Underbridge to M8 Ppp Boundary), Westbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

M74 J1 SB onslip - Closure

Location:M8 (Slip Off M8 Wb to End Slip ?????) to M74 (2 To 1 Lane to Slip On), Southbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
Join M74 NB via Carnoustie St and follow to M8 J23, leave at J23 turn RIGHT onto Dumbreck Rd and RIGHT again to re-join M8 EB and bear LEFT onto M74 SB - end

M74 JCT1 NB offslip - Slip Closure

Location:M74 (Slip Off to Slip 2-Lane) to M74 (Slip 1-Lane to T-Junction), Northbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
Turn left onto Carnoustie St and then right onto Scotland St the right onto Seaward St to join Paisley Rd West - end

M74 Jct 10 Nethan Bridge SB - Lane Closure

Location:M74 (Slip On From B7078 to Nethan Bridge North) to M74 (Nethan Bridge to Brocketsbrae U'Pass), South

Start time:22nd of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M74 Jct 10 onslip SB - Total Closure

Location:M74 (B7078 Rbt (E) to Entry M74 Sb) to M74 (Slip On From B7078 to Nethan Bridge North), Southbound

Start time:22nd of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
follow diversion -

Carlisle Rd - Wellburn Interchange - Join M74 Jct 10 NB - Follow M74 NB down to Jct 8 - Canderside Toll - A71 - Rejoin M74 SB at Jct 8

end

M74 Jct 6 NB from Hamilton to M74 - Slip Closure

Location:M74 (A723 E/B On Slip Nth/Sth Split to M74 Nb Entry) to M74 (Slip On From A723 to B7012 Underpass),

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A723- at traffic lights turn right on Airbles rd- at rbt cirle and take 4th exit- at traffic liights turn left onto A723- turn left onto M74 jct 6 on slips- take north exit- end

M74 Jct 6 Off Slip SB - Slip Closure

Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (Start Off Slip to S/B Slp East/Wst Split), Southbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 south- leave at jct 8- at rbt take 2nd exit onto M74 north- leave M74 at jct 6- end

M74 Jct 6 On Slip NB from Hamilton - Slip Closure

Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt), Northbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A723- at traffic lights turn right on Airbles rd- at rbt cirle and take 4th exit- at traffic lights turn left onto A723- turn left onto M74 jct 6 on slips- end

M74 Jct 6 SB from Hamilton to M74 - Slip Closure

Location:M74 (A723 Eb Split to M74 Sb) to M74 (A723 Slip Off to A723 O'Bridge), Southbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A723- at traffic lights turn right on Airbles rd- at rbt cirle and take 4th exit- at traffic liights turn left onto A723- turn left onto M74 jct 6 on slips- take exit for M74 south- end

M74 Jct 6 off slip to Hamilton SB - Slip Closure

Location:M74 (Start Off Slip to S/B Slp East/Wst Split) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), So

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 south- leave at jct 8- at rbt take 2nd exit onto M74 north- leave M74 at jct 6- end

M74 Jct 6 off slip to Motherwell SB - Slip Closure

Location:M74 (Start Off Slip to S/B Slp East/Wst Split) to M74 (S/B Slp East/Wst Split to A723 Eb To Motherwe

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 south- leave at jct 8- at rbt take 2nd exit onto M74 north- leave M74 at jct 6- end

M74 Junction 8 onslip closure

Location:M74 (A71 Swinhill Rd to Entry M74 Sb) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge), Sout

Start time:19th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Continue down A71 to Canderside Toll Rbt and then take 5th exit onto Swinhill Rd and Rejoin M74 onslip NB and continue down M74 to jucntion 6 offslip and take 1st exit to Motherwell Rd and then join A723 and then at next rbt and take 4th exit and rejoin M74 SB onslip

M74 NB Jct 10 off slip Slip Closure

Location:M74 (Slip Off To B7078 to B7078 O'Bridge) to M74 (Slip Off To B7078 to B708 Rbt (W)), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 north- leave M74 at jct 8- at rbt take 4th exit onto A71- rejoin M74 south- leave M74 at jct 9- at jct turn right- at rbt take 2nd exit- end

M74 NB Jct 6 off slip to Hamilton Slip Closure

Location:M74 (Off Slip To A723 to N/B Slip Est/Wst Split) to M74 (N/B Slip Est/Wst Split to Off Slip To Hamil

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 north- leve M74 jct 3- at jct turn right and join M74 south- leave M74 jct 6- take exit for hamilton- end

M74 NB Jct 6 from Motherwell on Slip - -Slip Closure

Location:M74 (A723 W/B On Slip Nth/Sth Split to Entry M74 Nb) to M74 (A723 Overbridge to Slip On From A723),

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end

M74 NB Jct 8 on slip Slip Closure

Location:M74 (A71 Swinhill Rd to Entry M74 Nb), Northbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A71 Ayr rd- at rbt take 1st exit onto A72 Lanark rd- rejoin M74 north at jct 7

M74 NB Jct 8 to Jct 7 Road Closure

Location:M74 (Lochhead O'Bridge to Entry From A71) to M74 (A72 O'Bridge to Merryton Farm O'Bridge), Northboun

Start time:27th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 Jct 8- take 4th exit onto A71 Ayr Rd- at Rbt take 1st exit onto A72 Lanark rd- rejoin M74 north at Jct 7

M74 NB J10 on slip - Slip Closure

Location:M74 (B7078 Rbt (W) to Entry M74 Nb) to M74 (Slip From B7078 to B7086 Underpass), Northbound

Start time:31st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 jct 10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- rejoin M74 jct 8- end

M74 NB J10 to J8 - Road Closure

Location:M74 (Slip Off To B7078 to B7078 O'Bridge) to M74 (B7019 Overbridge to Off Slip To A71), Northbound

Start time:31st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 J10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- rejoin M74 J8- end

M74 NB J12 EXIT SLIP ROAD - Road Closure

Location:M74 (N/B Slip Road Off to A70 Overbridge) to M74 (N/B Slip Road Off to A70 Millbank Rbt(W)), Northbo

Start time:11th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
J13 EXIT SLIP ROAD - B7078 - A70

M74 NB J13-J12 - Single Lane Running

Location:M74 (Maidengill Underpass to N/B Slip Road Off) to M74 (N/B Slip Road Off to A70 Overbridge), Northb

Start time:11th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Single Lane Running (50mph)

M74 NB J13-J12 - Single Lane Running

Location:M74 (Maidengill Underpass to N/B Slip Road Off), Northbound

Start time:11th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Single Lane Running (50mph)

M74 NB J15-J14 - Single Lane Running

Location:M74 (Moffat Onslip Nb to Coatsgate Bridge Nb) to M74 (Coatsgate Bridge Nb to Crossburn Culvert Nb),

Start time:11th of May 2024, 6:00am

Description:Works:
Pothole Repairs

Traffic Management:
Single Lane Running (50mph)

M74 NB J15-J14 - Single Lane Running

Location:M74 (B7076 O'Bridge to Beattock Summit Culvert Sb) to M74 (B7076 O'Bridge to Off Slip To A703), Nort

Start time:11th of May 2024, 5:00am

Description:Works:
Inspections: Structures

Traffic Management:
Single Lane Running (50mph)

M74 NB J15-J14 - Single Lane Running

Location:M74 (B7076 O'Bridge to Off Slip To A703), Northbound

Start time:19th of May 2024, 8:00pm

Description:Works:
Remedials to Traffic Measurement Sites

Traffic Management:
Single Lane Running (50mph)

M74 NB J2 off slip - Slip Closure

Location:M74 (Fullarton Junc to A724 Junc) to M74 (End Of 2-Lane to T-Junction), Northbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 NB - leave M74 at J1 - turn left Carnoustie St- turn left onto Scotland St- turn left onto Wallace St- turn left and rejoin M74 SB - leave M74 at J2- end

M74 NB J2 on slip - Slip Closure

Location:M74 (T-Junction to Slip On From A724) to M74 (A724 O/B to Glasgow Rd O/B), Northbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A724- turn right onto M74 SB- leave M74 J3a- turn right onto A721- turn right and rejoin M74 NB - end

M74 NB J3 off slip - Slip Closure

Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip Off M74 to A763 Jct), Northbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 NB - leave M74 at J2a- at rbt take 3rd exit- at rbt take 1st exit- turn right onto A74- turn right onto A763- end

M74 NB J7 on slip - Slip Closure

Location:M74 (A72 Exit Jct to Entry M74 On Slip) to M74 (A72 O'Bridge to Merryton Farm O'Bridge), Northbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A72 Lanark Rd- at jct turn right onto Carlisle Rd- at jct turn right onto A723 at rbt take 3rd exit onto Motherwell Rd- take exit for M74 NB -end

M74 NB J8 off slip - Slip Closure

Location:M74 (Lochhead O'Bridge to Entry From A71) to M74 (Start Off Slip to A71 Canderside Toll Rbt), Northb

Start time:31st of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 jct 10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- M74 jct 8- end

M74 NB Jct 1 Link Road to M8 WB Total Closure

Location:M74 (End Of 3 Lane to Start Of Dedicated C/Way), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Follow Diversion Exit Jct 1 - Left into Carnoustie St - Join M8 WB

M74 NB Jct 11 on slip Slip Closure

Location:M74 (B7078 Rbt (W) to Entry M74 Nb) to M74 (Start Slip On B7078 to Brocketsbrae Underpass), Northbou

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
at slip rd turn left onto B7078- continue B7078 to rbt- at rbt take 2nd exit onto M74 north at jct 10- end

M74 NB Jct 6 off slip Slip Closure

Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (Off Slip To A723 to N/B Slip Est/Wst Split),

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 north- leave M74 jct 3- turn right at jct and join M74 south- leave M74 jct 6- end

M74 NB Jct 6 off slip to Motherwell Slip Closure

Location:M74 (Off Slip To A723 to N/B Slip Est/Wst Split) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton),

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 north- leve M74 jct 3- at jct turn right and join M74 south- leave M74 jct 6- take exit for motherwell- end

M74 NB Jct 6 on slip from Hamilton - Total Closure

Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (A723 E/B On Slip Nth/Sth Split to M74 Nb Entry

Start time:24th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
TRO 3560616 3560636 3560662

24th & 28th May
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End

29th May
A723 WB – A723 EB – M74 Jct 6 sb on slip from Hamilton – M74 Jct 8 SB off slip – M74 Jct 8 NB on slip – Diversion End

30th May

A723 EB – Airbles Rd Rbt – A723 WB – M74 Jct 6 SB on slip from Motherwell – M74 Jct 7 SB off slip – M74 Jct 7 NB on slip – Diversion End

31st May
A723 WB – A723 EB – M74 Jct 6 NB on slip from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip – Diversion End

1st June until 3rd June
A723 WB – A723 EB – M74 Jct 6 NB on slips from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip - Diversion end


M74 NB Jct 6 on slip from Motherwell- Closure

Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 Overbridge to Slip On From A723), North

Start time:29th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
24th & 28th May
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End

29th May
A723 WB – A723 EB – M74 Jct 6 sb on slip from Hamilton – M74 Jct 8 SB off slip – M74 Jct 8 NB on slip – Diversion End

30th May

A723 EB – Airbles Rd Rbt – A723 WB – M74 Jct 6 SB on slip from Motherwell – M74 Jct 7 SB off slip – M74 Jct 7 NB on slip – Diversion End

31st May
A723 WB – A723 EB – M74 Jct 6 NB on slip from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip – Diversion End

1st June until 3rd June
A723 WB – A723 EB – M74 Jct 6 NB on slips from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip - Diversion end

M74 NB Jct 7 onslip - Slip Closure

Location:M74 (A72 Exit Jct to Entry M74 On Slip), Northbound

Start time:16th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

M74 NB Jct 8 - 6 Closure

Location:M74 (Lochhead O'Bridge to Entry From A71) to M74 (Merryton Farm O'Bridge to A723 Underpass), Northbo

Start time:16th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic will depart from M74 at Junction 8 Canderside Toll.
Traffic will then take exit 5 onto A71 Ayr Road, then turn left onto A72 Lanark Road.
Traffic will then turn right onto A72 Carlisle Road towards Hamilton.
Traffic will then turn right onto A723 & enter M74 at Junction 6.

M74 NB Jct 8 onslip - Slip Closure

Location:M74 (A71 Swinhill Rd to Entry M74 Nb) to M74 (A71 On Slip to B7019 Overbridge), Northbound

Start time:16th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic will depart from M74 at Junction 8 Canderside Toll.
Traffic will then take exit 5 onto A71 Ayr Road, then turn left onto A72 Lanark Road.
Traffic will then turn right onto A72 Carlisle Road towards Hamilton.
Traffic will then turn right onto A723 & enter M74 at Junction 6.

M74 Northbound Junction 3A on-slip -Total closure

Location:M74 (A74 Rbt (S) to Slip Road Diverge) to M74 (Secondary Lane to M8ppp Boundary), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 NB Daldowie On-slip, M73 Jct 2 NB Off-slip, Baillieston Rbt, M73 Jct 2 SB On-slip, M73 SB Link Road to M74 NB.

M74 Northbound Junction 5 off-slip - Progressive nearside & offside closure

Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M74 Nb Off Slip to B702 Rbt), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M74 Northbound Junction 5 on-slip - Total closure

Location:M74 (B7012 Rbt to Entry M74 Nb), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M74 SB Jct 5 On-slip, M74 SB Jct 6 Off-slip, A723, M74 NB Jct 6 On-slip

M74 Northbound Junction 5 to Junction 4 - Lanes 1,2 & 3 closure

Location:M74 (Fall Side Rd Bridge to Start Of Dedicated Slip & 2 Mainlanes) to M74 (Start Of Dedicated Slip t

Start time:3rd of June 2024, 8:00pm

Description:Works:
High Friction Works

Traffic Management:
Single Lane Running.

M74 SB Jct 10 on slip Slip Closure

Location:M74 (B7078 Rbt (E) to Entry M74 Sb) to M74 (Slip On From B7078 to Nethan Bridge North), Southbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on carlisle road- at rbt take 3rd exit onto M74 north- leave M74 at jct 8- at rbt take 3rd exit onto A71- rejoin M74 south- end

M74 SB Jct 11 off slip - Slip Closure

Location:M74 (Brocketsbrae Underpass to Slip Off To B7078) to M74 (Start Off Slip To B7078 to B7078 Rbt (E)),

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 south- leave M74 at jct 13- at rbt take 5th exit- at rbt take 3rd exit onto bM74 north- leave M74 at jct 12- at rbt take 2nd exit onto Ayr rd- at rbt take 1st exit onto B7078- end

M74 SB Junction 8 lane closures

Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge),

Start time:18th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

M74 SB Junction 8 offslip closure

Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Off Slip To A71 to A71 U'Pass), Southbound

Start time:18th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Continue down M74 SB, take jct 9 offslip, go left on to B7078 Carlisle road and all the way to Canderside toll rbt and take 5th exit to rejoin M74 NB onslip

M74 SB Between Jct 6 & 7 - Lane closure

Location:M8 (On Slip From M80 to Jct 14 Off Slip) to M8 (New Park Avenue to Entry M8 Wb), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M74 SB J12 ENTRY SLIP ROAD - Road Closure

Location:M74 (A70 Millbank Rbt (E) to S/B Millbank On Slip) to M74 (Slip On From A70 Millbank to Maidengill U

Start time:12th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A70 - B7078 - J13 SB ENTRY SLIP ROAD

M74 SB J12-J13 - Single Lane Running

Location:M74 (B7078 Underpass to A70 Overbridge) to M74 (Slip On From A70 Millbank to Maidengill Underpass),

Start time:12th of May 2024, 9:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Single Lane Running (50mph)

M74 SB J14-J15 - Single Lane Running

Location:M74 (Slip Entry From B7076 to B7076 O'Bridge) to M74 (B7076 O'Bridge to Beattock Summit Culvert Sb),

Start time:11th of May 2024, 5:00am

Description:Works:
Inspections: Structures

Traffic Management:
Single Lane Running (50mph)

M74 SB J1a off slip - Slip Closure

Location:M74 (Start Of 3 Lanes to Polmadie Junc) to M74 (Slip 2-Lane to T-Junction), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 south- leave M74 jct 2- at jct turn right- turn right onto M74 north- leave M74 jct 1a- end

M74 SB J1a onslip - Slip Closure

Location:M74 (Slip 1-Lane to Slip On) to M74 (Polmadie Junc to Glasgow Rd O/B), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A728- turn right on M74 north- leave M74 jct 1- at jct turn left onto Carnoustie st- turn left onto Scotland st- continue onto West st- turn left onto Wallace st- turn left and rejoin M74 south- end

M74 SB J22-J45 - Lane Closure

Location:M74 (Sb Off Slip To Springfield to Gretna Railway Br) to M74 (Nosing to Entry To Main Cway), Southbo

Start time:12th of May 2024, 8:00pm

Description:Works:
Remedials to Traffic Measurement Sites

Traffic Management:
Lane Closure.

M74 SB J3 on slip - Slip Closure

Location:M74 (A763 Jct to Entry M74 Sb) to M74 (Sb Start Entry Slip From A763 to End Slip From A763), Southbo

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A763- turn left onto A74- turn left at traffic light Fullarton rd- join M74 south- end

M74 SB J7 off slip - Slip Closure

Location:M74 (Off Slip To A72 to A72 Lanark Road), Southbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 SB- leave M74 at J8 - at rbt take 5th exit onto A71- at rbt take 1st exit onto A72- end

M74 SB J9 off slip - Slip Closure

Location:M74 (Off Slip To B7078 to Jct B7078), Southbound

Start time:30th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 SB - leave M74 at J11 - at rbt take 2nd exit - at rbt take 2nd exit and join M74 NB - leave M74 north at J10- at rbt take 4th exit for Carlisle Rd- at rbt take 1st exit - end

M74 SB Jct 2a off slip Slip Closure

Location:M74 (A724 Junc to Fullarton Junc) to M74 (Slip Off to T Junction), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue m74 south- leave M74 jct 3a- turn right onto A721- turn right M74 north- leave M74 jct 2a- end

M74 SB Jct 2a on slip Slip Closure

Location:M74 (A74 Rbt to Start Of M74) to M74 (Fullarton Junc to A763 Junc), Southbound

Start time:28th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
take 2nd exit onto M74 north- continue M74 north- leave M74 jct 1- turn left carnoustie st- turn left onto scotland st- turn =left onto wallace st- turn left and rejoin M74 south- leave m74 jct 2a- end

M74 SB Jct 6 - 8 Closure

Location:M74 (A723 Underpass to Slip Entry From A723) to M74 (B7019 Overbridge to Off Slip To A71), Southboun

Start time:17th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic will depart from M74 at Junction 6 towards Hamilton.
Traffic will take exit 1 onto A723 Blackswell Ln towards Town Centre.
Traffic will then turn left onto A72 Carlisle Road towards Larkhall.
Traffic will then turn left onto A72 Lanark Road.
Traffic will then turn right onto A71 Ayr Road.
Traffic will then turn left onto M74 Junction 8 Canderside Toll.

M74 SB Jct 6 combined slip from Motherwell Slip Closure

Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split), Southbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end

M74 SB Jct 6 from Motherwell on slip - Slip Closure

Location:M74 (A723 W/B On Slip Nth/Sth Split to Start Entry M74 Sb), Southbound

Start time:29th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end

M74 SB Jct 6 on slip from Hamilton - Total Closure

Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (A723 Eb Split to M74 Sb), Southbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
24th & 28th May
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End

29th May
A723 WB – A723 EB – M74 Jct 6 sb on slip from Hamilton – M74 Jct 8 SB off slip – M74 Jct 8 NB on slip – Diversion End

30th May

A723 EB – Airbles Rd Rbt – A723 WB – M74 Jct 6 SB on slip from Motherwell – M74 Jct 7 SB off slip – M74 Jct 7 NB on slip – Diversion End

31st May
A723 WB – A723 EB – M74 Jct 6 NB on slip from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip – Diversion End

1st June until 3rd June
A723 WB – A723 EB – M74 Jct 6 NB on slips from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip - Diversion end

M74 SB Jct 6 on slip from Motherwell - Total Closure

Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 Underpass to Slip Entry From A723), Sou

Start time:29th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
24th & 28th May
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End

29th May
A723 WB – A723 EB – M74 Jct 6 sb on slip from Hamilton – M74 Jct 8 SB off slip – M74 Jct 8 NB on slip – Diversion End

30th May

A723 EB – Airbles Rd Rbt – A723 WB – M74 Jct 6 SB on slip from Motherwell – M74 Jct 7 SB off slip – M74 Jct 7 NB on slip – Diversion End

31st May
A723 WB – A723 EB – M74 Jct 6 NB on slip from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip – Diversion End

1st June until 3rd June
A723 WB – A723 EB – M74 Jct 6 NB on slips from Hamilton – M74 Jct 5 NB off slip – M74 Jct 5 SB on slip - Diversion end

M74 SB Jct 6 onslip from Hamilton - Slip Closure

Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (A723 Underpass to Slip Entry From A723), South

Start time:17th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic will depart from M74 at Junction 6 towards Hamilton.
Traffic will take exit 1 onto A723 Blackswell Ln towards Town Centre.
Traffic will then turn left onto A72 Carlisle Road towards Larkhall.
Traffic will then turn left onto A72 Lanark Road.
Traffic will then turn right onto A71 Ayr Road.
Traffic will then turn left onto M74 Junction 8 Canderside Toll.

M74 SB Jct 6 onslip from Motherwell - Slip Closure

Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 W/B On Slip Nth/Sth Split to Start Entr

Start time:17th of May 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic will depart from M74 at Junction 6 towards Hamilton.
Traffic will take exit 1 onto A723 Blackswell Ln towards Town Centre.
Traffic will then turn left onto A72 Carlisle Road towards Larkhall.
Traffic will then turn left onto A72 Lanark Road.
Traffic will then turn right onto A71 Ayr Road.
Traffic will then turn left onto M74 Junction 8 Canderside Toll.

M74 SB Jct 7 to Jct 8 - Road closure

Location:M74 (Off Slip to A72 Overbridge) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge), Southboun

Start time:27th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 Jct 7- at jct turn left onto A72 lanark Rd- at jct turn left onto onto B7808 Ayr rd- at rbt take 1st exit onto A71- rejoin M74 south jct 8 on slip.

M74 SB Jct 8 -9 Lane Closures

Location:M74 (Canderside Off Slip To A71 to Lochhead O'Bridge) to M74 (Lochhead O'Bridge to Draffan Underpass

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M74 SB Jct 8 HS Closure

Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge),

Start time:17th of May 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Hard Shoulder Closure.

M74 SB Jct 8 off slip - road closure

Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Off Slip To A71 to A71 U'Pass), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 Jct 7- at jct turn left onto A72 lanark Rd- at jct turn left onto onto B7808 Ayr rd- at rbt take 1st exit onto A71- end

M74 Southbound Junction 5 off-slip -Total closure

Location:M74 (Fallside Rd Bridge to B7012 Underpass) to A725 (Raith Rbt to Raith Rbt), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M74 SB Jct 6 Off-slip, A723, M74 NB Jct 6 On-slip

M74 Southbound Junction 5 on-slip - Total closure

Location:M74 (B7012 Rbt to Entry M74 Sb) to M74 (B7012 Underpass to A723 Slip Off), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M74 NB Jct 5 On-slip, M74 NB Link to M73 NB, M73 NB Jct 2 Off-slip, Baillieston Rbt, M73 SB Jct 2 On-slip, M73 SB Link Road to M74 SB, M74 SB

M74 Southbound Maryville - Nearside lane closure

Location:M74 (Start Of Hs to Blantype Farm Rd O/B) to M74 (Blantype Farm Rd O/B to Fallside Rd O/B), Southbou

Start time:3rd of June 2024, 8:00pm

Description:Works:
High Friction Works

Traffic Management:
Lane Closure.

M74 WB Between Jct3a and 2a - Route Part of Diversion

Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip 3-Lane to Fullarton Rbt), Westbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Road Part of a Diversion Route

Traffic Management:
No Obstruction on Carriageway or Footway.

M77 - Junction 5 off-slip

Location:M77 (Cairn Road Underbridge to Maidenhill Interchange Overbridge) to A77 (Start Off Slip Malletsheug

Start time:11th of May 2024, 6:00am

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M77 Junction 3 Northbound Off-slip - M77 Junction 3 Southbound On-slip - M77 Junction 5 Southbound Off - slip

M77 - Junction 5 on-slip

Location:A726 (Maudenhill Interchange Roundabout to Maidenhill Roundabout Interchange) to M77 (Maidenhill Int

Start time:11th of May 2024, 6:00am

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M77 - Junction 5 Southbound on-slip - M77 Junction 6 Southbound off-slip - M77 Junction 6 Northbound on-slip - M77.

M77 N/B J4-1 Mobile Hard Shoulder Closures

Location:M77 (A77 Overbridge to Crookfur Int.) to M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)),

Start time:13th of May 2024, 12:30pm

Description:Works:
Traffic Management Training

Traffic Management:
Hard Shoulder Closure.

M77 NB Jct 1 onslip from Dumbreck Road - Slip Closure

Location:M77 (N/B Slip Road On To M77 From Dumbreck Road to N/B Slip Road On To M77), Northbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue Dumbeck road- join M8 east at jct 23- end

M77 NB Jct 1 to M8 EB sec c/way- Closure

Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Lhs Slip To M8 to Entry To M8), Northbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct 1- at jct turn left onto dumbeck road- return M8 east at jct 23- end

M77 NB Jct 1 to M8 Jct 22- Road Closure

Location:M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)) to M77 (B768 Dumbreck Rd Int (N) to Slip

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct 1- at jct turn left onto dumbeck road- return M8 east at jct 23- end

M77 NB Jct 2 - Slip Closure

Location:M77 (Nitshill Rd Int (N) to B762 Barrhead Rd Int (S)) to M77 (Start Exit Slip To Silverburn Rbt to S

Start time:13th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
M77 northbound diversion via M77 NB to Jct 1, south on drumbreck road back onto M77 SB via jct 1 SB on slip

M77 NB Link Road to M8 EB Jct 22 - Closure

Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Northb

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct 1- at jct turn left onto dumbeck road- return M8 east at jct 23- end

M77 NB at Jct 3 - Lane closure

Location:A77 (E. Ayrshire Bdy to 300m N Whatriggs Br), Northbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M77 NB between the slips at Jct 4 - Lane closure

Location:M77 (A77 Overbridge to Crookfur Int.) to M77 (Crookfur Int. to Nitshill Rd Int (S)), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M77 S/B J1-4 Mobile Hard Shoulder Closures

Location:M77 (B768 Dumbreck Rd Int (N) to B768 Dumbreck Rd Int (S)) to M77 (Crookfur Int. to A77 Overbridge),

Start time:13th of May 2024, 12:30pm

Description:Works:
Traffic Management Training

Traffic Management:
Hard Shoulder Closure.

M77 SB at Jct 3 - Lane closure

Location:M77 (Nitshill Int (S) to Crookfur Int.), Northbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 EB Jct 17 onslip from A82 Great Western Road Slip Closure

Location:M8 (A82 Exit to Entry M8 Eb), Eastbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A82- at jct turn left onto Garscube rd- at rbt take 3rd exit onto A804- at jct turn left- rejoin M8 east at jct 16- end

M8 Jct 26 - Jct 27 WB - Lane Closure

Location:M8 (Wb Off Slip to Mid Point Hillington Int Bridges) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfre

Start time:16th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 Jct 31 West Ferry WB - Lane Closure

Location:M8 (Slip From M898 to Slip Off To Ferry Int), Westbound

Start time:21st of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 WB Jct 25 On Slip From Fifty Pitches Road - Slip Closure

Location:M8 (Jct 25 Off Slip to A739 Rbt) to M8 (Jct 25 Wb On Slip to Jct 26 Off Slip), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
exit rbt for fifty pitches rd- turn left onto shieldhall rd- at rbt take 1st exit onto renfrew rd- at rbt take 1st exit onto hillington road- end

M8 WB Jct 25a Offslip To Braehead - Slip Closure

Location:M8 (W/B Off Slip From M8 to Braehead Rbt), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 West- leave M8 jct 26- at rbt take 3rd exit- at rbt take 2nd exit- join - follow signs- end

M8 - EB - Jct 1 - Hard shoulder closure

Location:M8 (Gogar Slip Road to Hermiston Roundabout), Eastbound

Start time:14th of May 2024, 7:00pm

Description:Works:
Barrier Repair

Traffic Management:
Hard Shoulder Closure.

M8 - EB - Jct 2 on slip - Hard shoulder closure

Location:M8 (East Of Claylands Jct to On To M8 E.Bound) to M8 (East Of Claylands Jct to Freelands Road Br.),

Start time:13th of May 2024, 7:00pm

Description:Works:
Barrier Repair

Traffic Management:
Hard Shoulder Closure.

M8 - EB - Jct 6 to Hermiston Gait Roundabout - Mobile Lane Closure

Location:M8 (Newhouse Interchange to End Of Ppp) to M8 (Gogar Slip Road to Hermiston Roundabout), Eastbound

Start time:7th of June 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

M8 - WB - Hermiston Gait Roundabout to Jct 6 - Mobile Lane Closure

Location:M9 (End Of 4 Lane Eb to 2 Lane Dual) to M8 (Off Slip To A73 to A73 Rbt), Westbound

Start time:7th of June 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

M8 - WB - JCT 1 to 2 - Lane closure

Location:M8 (Freelands Rd Br. to Wb Slip To Newbridge), Westbound

Start time:12th of May 2024, 7:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 - WB - Jct 2 to 3 - Lane closure

Location:M8 (Almond Bridge to Canal Culvert) to M8 (Canal Culvert to Drumshoreland Br), Westbound

Start time:15th of May 2024, 7:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 - WB- Jct 3 to 3A - Lane closure

Location:M8 (Uphall Stat. Br to Westbound Slip) to M8 (Starlaw Bridge to Easter Inch Footbridge), Westbound

Start time:10th of May 2024, 6:00am

Description:Works:
Resurfacing

Traffic Management:
Lane Closure (50mph)

M8 E/B J27-J26 Total Closure

Location:M8 (A741 Renfrew Rd O'Br to Slip Rd Off M8 Eb) to M8 (Arkleston On Slip to Off To Hillington Int), E

Start time:15th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Renfrew Rd, Incle St, Glasgow Rd, Sandwood Rd, Hillington Rd, End.

M8 E/B J28 on slip Closure

Location:M8 (Airport Rbt to Entry M8 Eb) to M8 (Start White Cart Viad Eb to End Of Viaduct Ebnd), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
St James Interchange, M8 Jct 29 EB on slip, End

M8 E/B J28 onslip to J27 off slip lane 2 and 3 closure

Location:M8 (Slip Rd From A/Prt to Start White Cart Viad Eb) to M8 (A741 Renfrew Rd O'Br to Slip Rd Off M8 Eb

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

M8 EB Jct 15 off slip to Stirling Road/Castle Street - Slip Closure

Location:M8 (Off Slip M8 Eb to Slip To A803) to M8 (A803 Exit to Entry Eb M8), Eastbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 14- at jct turn right- return M8 west- leave M8 west jct 15 castle st- end

M8 EB Jct 18 to Jct 13 - Lane Closure

Location:M8 (Eb On Slip to Entry From A82) to M8 (Jct 14 Off Slip to Off Slip To M80), Eastbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Jct 23 on slip from Dumbreck Road - Slip Closure

Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end

M8 EB Jct 24 on slip from Helen Street - Slip Closure

Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue onto Helen st- at rbt take 3rd exit onto Edminston dr- at rbt take 3rd exit onto Broomloan Rd- at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end

M8 EB Jct 24 to Jct 22 - Lane Closure

Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB - JCT 31 off slip - lane closures

Location:M8 (Slip Off To A8 to Slip Entry From A8) to A8 (Slip Off To A8 to A8 Rbt), Eastbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB J10 off slip - Slip Closure

Location:M8 (Exit M8 Eb to End Eb Off Slip), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave m8 at jct 9- at jct turn right- rejoin M8 west- leave m8 at jct 10- end

M8 EB J11 off slip - Slip Closure

Location:M8 (Jct 12 Off Slip to Jct 11 On Slip) to M8 (Slip Rd Off M8 Eb to Stepps Rd Jct), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 EB - leave M8 at J9- at jct turn right - rejoin M8 going WB - leave M8 at J11- end

M8 EB J11 on slip - Slip Closure

Location:M8 (Stepps Rd Jct to Entry M8 Eb) to M8 (Jct 11 Eb Off Slip to Jct 11 Eb Entry), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:

continue B765 - at jct turn left onto Edinburgh rd A8- at jct turn right - turn left onto Bartiebeith rd- rejoin M8 at jct 10- end

M8 EB J12 off slip - Slip Closure

Location:M8 (Jct 12 Eb Off Slip to Jct 12 Eb Entry Slip) to M8 (Slip Off M8 Eb to Cumbanauld Rd), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 EB - leave M8 at J9- at jct turn right - rejoin M8 going WB - leave M8 At J12- end

M8 EB J13 onslip - Slip Closure

Location:M8 (Start Provan Rd Underpass to End Provan Rd Underpass), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on Provan Rd - at jct turn right onto A80 Cumbernauld Rd - at jct turn left onto Edinburgh Rd - turn left onto B765 Stepps Rd - rejoin M8 EB via J11 on slip east - end

M8 EB J13 to J12 - Lane Closure

Location:M8 (Slip On From M80 to Off Slip Jct 12), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB J24 off slip - Slip Closure

Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (Jct 24 Eb Off Slip to Helen St Jct), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- at jct 22 take left lane to M8 sec c/way- leave M8 at seaward st- stay in lane 2 for slip to M8 sec c/way east- stay in lane 2 for M8 east- follow signs for jct 24- end

M8 EB J25 off slip - Slip Closure

Location:M8 (Jct 25 Eb Off Slip to A739 Entry), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- at jct 22 take left lane to M8 sec c/way- leave M8 at seaward st- stay in lane 2 for slip to M8 sec c/way east- stay in lane 2 for M8 east- follow signs for jct 25- end

M8 EB J25 on slip - Slip Closure

Location:M8 (A739 Exit to Entry M8 Eb), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A739-at rbt take 2nd exit onto fifty pitches road- at jct turn right onto shieldhall rd-- at rbt take 2nd exit follow shieldhall rd- at rbt take 3rd exit onto helen st- follow helen st to M8 e/b onslip end

M8 EB J25a on slip - Slip Closure

Location:M8 (Braehead Rbt to E/B On Slip To M8) to M8 (Jct 26 Entry Slip to Jct 25 Off Slip), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow old govan rd- at jct turn left onto kings inch rd- at rbt take 1st exit onto shieldhall rd- at rbt take 2nd exit follow shieldhall rd- at rbt take 3rd exit onto helen st- follow helen st to M8 e/b onslip end

M8 EB J26 off slip - Slip Closure

Location:M8 (Slip Off M8 Eb to Hillington Int Rbt), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- at jct 22 take left lane to M8 sec c/way- leave M8 at seaward st- stay in lane 2 for slip to M8 sec c/way east- stay in lane 2 for M8 east- follow signs for jct 26- end

M8 EB J26 on slip - Slip Closure

Location:M8 (Hillington Int Rbt to Entry M8 Eb), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave hillington rbt onto hillington road- at rbt take 3rd exit onto refrew rd- at rbt take 3rd exit onto shieldhall rd- at rbt take 2nd exit follow shieldhall rd- at rbt take 3rd exit onto helen st- follow helen st to M8 e/b onslip end

M8 EB J26 to J24 - Lane Closure

Location:M8 (Arkleston On Slip to Off To Hillington Int) to M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip), Eas

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB J30 Craigton off slip - Slip Closure

Location:M8 (Slip Off M8 Eb to Greenock Rd O'Br) to M8 (Slip Off M8 Wb to Greenock Rd O'Bridge), Eastbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 29- at rbt take 5th exit and rejoin M8 west- leave M8 at jct 30- end

M8 EB Jct 22 to Jct 20 - Lane 1 Closure

Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Jct 12 - 10 Mobile Lane Closures

Location:M8 (Jct 12 Eb Off Slip to Jct 12 Eb Entry Slip) to M8 (End Of Nosing to Jnct 10 On Slip (Nosing)), E

Start time:15th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

M8 EB Jct 13 Link Road to M80 NB Jct 2 - Closure

Location:M8 (Jct 14 Off Slip to Off Slip To M80) to M80 (South Extent Of M80 Dbfo to E.Dunbartonshire Council

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto royston road- at rbt take 2nd exit onto B765 robroyston rd- at rbt take 4th exit onto B765- at rbt take 2nd exit onto M80 north- end

M8 EB Jct 14 offslip to Viewpark Avenue - Closure

Location:M8 (Eb Jct 14 Off Slip to Viewpark Avenue), Eastbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn right- at jct turn left onto M8 west- leave M8 west jct 13- turn right at jct- at rbt take 1st exit blochairn rd- at rbt take 1st exit viewpark rd- end

M8 EB Jct 15 offslip to Springburn Expressway - Closure

Location:M8 (Slip Off M8 Eb to A803 Jct), Eastbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn right- at jct turn left onto M8 west- leave M8 west jct 15 stirling rd- turn left onto cathederal st- turn left onto castle st- turn right onto A803 springburn expressway- end

M8 EB Jct 15 onslip from Castle Street - Closure

Location:M8 (Castle St Jct to Entry M8 Eb Jct 15) to M8MONKLANDS (Junction 15 Secondary Carriageway to South

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow castle st- at jct turn right onto A804 royston rd- turn right onto Blochairn rd- at rbt turn left- at rbt turn right onto provan rd- turn left and rejoin M8 east at jct 13- end

M8 EB Jct 15 onslip from Stirling Road - Closure

Location:M8 (A803 Exit to Entry Eb M8) to M8MONKLANDS (Junction 16 Eastbound On Slip to Junction 15 Secondary

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A803- leave A803 for A804- turn left onto A804 baird st- - follow road to A804 royston rd- turn right onto Blochairn rd- at rbt turn left- at rbt turn right onto provan rd- turn left and rejoin M8 east at jct 13- end

M8 EB Jct 16 onslip from Craighall Closure

Location:M8 (Craighall Rd Underpass to Eb On Slip Jct 16) to M8 (Jct 16 On Slip to Jct 15 Off Slip), Eastboun

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A804- at jct right onto A804 Dobbies loan- turn left onto A804 Baird St-follow Road to A804 Royston rd- turn right onto Blochairn Rd- at Rbt turn left- at Rbt turn right onto Provan Rd- turn left and rejoin M8 east at Jct 13- end

M8 EB Jct 18 onslip from Charing Cross - Closure

Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Eb On Slip to Entry From A82), Eastbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A804 North st- at Jct turn right onto A804 phoenix road- at Rbt take 3rd exit onto Garscube rd- at Jct jct left onto Cowcaddens rd- turn left onto A804 - follow road to A804 Royston Rd- turn right onto Blochairn rd- at Rbt turn left- at Rbt turn right onto Provan rd- turn left and rejoin M8 east at Jct 13- end

M8 EB Jct 21 off slip ro Paisley Road - lane Closure

Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (Slip 2-Lane to T-Junction), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Jct 22 off slip Seaward St - Slip Closure

Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue to M74 and leave at Jct 1a- at Jct turn right- rejoin M74 north- leave M74 at Jct 1- follow directional signs

M8 EB Jct 22 to M74 Jct 1 - Closure

Location:M74 (Start Of M74 to 2 To 3 Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 19 Bothwell st- turn left at Pitt st- turn left onto st Vincent st- turn left onto M8 West- leave M8 at jct 20 west st- follow directional signs

M8 EB Jct 23 on slip - Total Closure

Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Dumbrek Rd - M77 Jct 1 NB off slip - Diversion End

M8 EB Jct 23 to 19 - Total Closure

Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M8 (Jct 20 Slip Rd Entry to Jct 19 Off Slip), Eastbound

Start time:11th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 Eastbound Junction 21 Off Slip To Paisley Road - Paisley Rd - Kingston St - Broomielaw - North St - M8 Jct 19 Anderston EB on slip - Diversion End

M8 EB Jct 23 to M74 SB Jct 1 - Total Closure

Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M74 (End Of Dedicated C/Way to Start Of 3 Lanes), Eastbo

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 traffic heading to M74 will continue on M8 mainline - M8 EB Jct 19 off slip - Pitt St - St Vincent St - M8 WB Jct 18 on slip - M8 Jct 20 WB off slip - West St - Wallace St - M74 Jct 1 SB on slip - Diversion End

M8 EB Jct 24 on slip - Total Closure

Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Helen St - Edminston Dr - Broomloan Rd - Dumbrek Rd - M77 Jct 1 NB off slip - Diversion End

M8 EB Jct 29 - 24 - Mobile Lane Closures

Location:M8 (Slip Rd Off M8 Eb to Mid Point A737 Bridges) to M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip), Ea

Start time:15th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

M8 EB Jct 29 On Slip St James IC HS Closure

Location:M8 (A737 2 Way Slip to Entry M8 Eb), Eastbound

Start time:13th of May 2024, 9:30am

Description:Works:
Grass Cutting

Traffic Management:
Hard Shoulder Closure.

M8 EB Jct 29 St James IC HS Closure

Location:M8 (Slip Rd Off M8 Eb to Mid Point A737 Bridges) to M8 (Mid Point A737 Bridges to Slip Entry From A7

Start time:13th of May 2024, 9:30am

Description:Works:
Grass Cutting

Traffic Management:
Hard Shoulder Closure.

M8 EB Jct 29 St James Int on slip to M8 – Slip Closure

Location:M8 (A737 2 Way Slip to Entry M8 Eb) to M8 (Mid Point A737 Bridges to Slip Entry From A737), Eastboun

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Greenock Rd, Caledonia St, St James St, A726 Niddry St, Renfrew Rd, M8 Jct 27 EB on slip, End.

M8 EB Jct 29 – Jct 28 – Road Closure

Location:M8 (Slip Off M8 Eb to A737 Rbt) to M8 (Start Airport Int Br. Eb to Slip Rd Entry From A/Prt), Eastbo

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Greenock Rd, Caledonia St, St James St, A726 Niddry St, Renfrew Rd, M8 Jct 27 EB on slip, End.

M8 EB Jct 30 to 29a Total Closure

Location:M8 (Slip To M898 to Craigton Int Underpass) to M8 (A8 Commonside Roundabout to M8 Mainline), Eastbou

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Follow Diversions Exit Jct 30 M898 - Exit to Spectacles A898 - A726 - Southbar Rd - Greenock Rd - Join M8 EB Jct 29a On slip – End

M8 EB Jct 31 Westferry on slip to M8 EB - Closure

Location:M8 (A8 Old Glamis Rd Rbt to Slip Onto M8 Eb) to M8 (Slip On From Ferryhill to Slip Off At Ferry Int)

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave rbt at 3rd exit onto A8 west- at rbt take 3rd exit onto A8 east- end

M8 EB Prior to Jct 17 on slip to Jct 15 - OSL Closure

Location:M8 (A82 Exit to Entry M8 Eb) to M8 (Off Slip To A803 to On Slip From A803), Eastbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Sec c/way Seaward st link to Sec c/way M8 SB Slip Closure

Location:M74 (End Of 2-Lane to Start Of 1-Lane), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
continue to Seaward st Rbt- at Rbt take 2nd exit onto Scotland St- at Jct turn left onto Carnoustie St- rejoin M8 West at Jct 21 on slip end.

M8 EB approach to Jct 29 St James Int – Lane closure

Location:Off Network to M8 (Slip Off M8 Eb to A737 Rbt), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

M8 EB on slip from M77 - Total Closure

Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Eas

Start time:11th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 Eastbound Junction 21 Off Slip To Paisley Road - Paisley Rd - Kingston St - Broomielaw - North St - M8 Jct 19 Anderston EB on slip - Diversion End

M8 Eastbound Eurocentral to Newhouse - Progressive nearside & offside lane closures

Location:A8 (Eurocentral Overbridge to Orchard Farm Access) to M8 (Duntilland Road to End Of Se Unit), Eastbo

Start time:20th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 Eastbound Junction 10 on-slip - Total closure

Location:M8 (Jct Westerhouse Rd to Entry Eb M8), Eastbound

Start time:5th of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Westerhouse road, Edinburgh Road, Glasgow & Edinburgh Road, Swinton Rbt, Bargeddie Rbt, A8 Eastbound Junction 6 Merge with M8.

M8 Eastbound Junction 11 on-slip - Total closure

Location:M8 (Stepps Rd Jct to Entry M8 Eb) to M8 (Jnct 11 On Slip to End Of Nosing), Eastbound

Start time:5th of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
B765 Stepps road, Edinburgh Road, Glasgow & Edinburgh Road, Swinton Rbt, Bargeddie Rbt, A8 Eastbound Junction 6 Merge with M8.

M8 Eastbound Junction 7 Eurocentral Main line - Total Closure

Location:A8 (Eurocentral Overbridge to Orchard Farm Access) to M8 (End Of Se Unit to A73 On Slip), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M8 Eastbound Junction 7 off-slip, A8 Eastbound to M8 Merge

M8 Eastbound Junction 8 off-slip - Total closure

Location:M8 (Slip Off Jct 9 to Railway Bridge) to M8 (Slip From M8 Eb to Slip To M8), Eastbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M8 EB Jct 7 Eurocentral Offslip, WB Jct 7 Eurocental onslip, WB Jct 8 Offslip.

M8 Eastbound Junction 8 on-slip - Total closure

Location:A8 (Bailleston Rbt to Entry A8 Eb) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Eastbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Lighting Works

Traffic Management:
Road Closure.

Diversion Information:
Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 EB

M8 Eastbound Main line Junction 11 - Total closure

Location:M8 (Slip Rd Off M8 Eb to Stepps Rd Jct) to M8 (Newhouse Interchange to End Of Ppp), Eastbound

Start time:5th of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
B765 Stepps road, Edinburgh Road, Glasgow & Edinburgh Road, Swinton Rbt, Bargeddie Rbt, A8 Eastbound Junction 6 Merge with M8.

M8 Eastbound Marker post 57/3 - Progressive lane closures

Location:A8 (Bargeddie Underbridge to Baillieston Off Slip) to A725 (Start 2 Lane to Diamond Int. O/B), Eastb

Start time:31st of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 J13 -J14 Westbound - lane closure

Location:M8 (Off Slip To M80 to Entry Slip From M80) to M8 (On Slip From M80 to Jct 14 Off Slip), Westbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 J14-J13 Eastbound - Lane closure

Location:M8 (Jct 14 Off Slip to Off Slip To M80) to M8 (Off Slip To M80 to Entry From M80), Eastbound

Start time:12th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 J17 WB Loop to Charing X - Total Closure

Location:M8 (Wb M8 Entry Slip to Jct 118 Int O'Bridge) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westb

Start time:27th of May 2024, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Continue on West Graham St - left on to A81 Garscube road - left onto A804 St Georges road - Diversion end

M8 J17 WB onslip from West Graham Street Total closure

Location:M8 (Wb M8 Entry Slip to Jct 118 Int O'Bridge) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westb

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
continue on link road to Charing x - join A804 Newton St - Take M8 J19 WB on slip - diversion ends

M8 J19 WB offslip to Anderston - Lane Closure

Location:M8 (Jct 19 Off Slip to Jct 19 On Slip), Westbound

Start time:11th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M8 J27 E/B on slip Total Closure

Location:M8 (A741 Arkleston Rd to Entry M8 Eb), Eastbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
A741 Renfrew Rd, A761 Glasgow Rd, Sandwood Rd, A736 Hillington Rd, M8 Jct 26 E/B onslip diversion End.

M8 Jct 11 - 12 WB Lane Closure

Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off Slip), We

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 Jct 11 onslip WB - Total Closure

Location:M8 (Start Wb On Slip Junction 11 to End Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off

Start time:17th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Diversion 1 for Traffic going NB on B765 Stepps Rd -

Continue on B765 Stepps Rd NB – Left onto Gartloch Rd – Continue on Gartloch Rd – Left onto A80 Cumbernauld Rd – Join M8 WB at Jct 12 onslip

End



Diversion 2 for Traffic going SB on B765 Stepps Rd -

Continue on B765 Stepps Rd SB – Right onto Edinburgh Rd – Continue on Edinburgh Rd – Right onto A80 Cumbernauld Rd – Join M8 WB at Jct 12 onslip

End

M8 Jct 26 onslip WB - Total Closure

Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We

Start time:16th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
follow diversion -

Hillington Interchange - Join M8 EB Jct 26 - Continue down to Jct 24 - Leave M8 EB Jct 24 - Right onto Helen St - Right onto M8 WB Jct 24

end

M8 Junction 7 Eurocentral on-slip - Total closure

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start), Westbound

Start time:3rd of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Eurocentral South Rbt, A8 Westbound, Bargeddie rbt, A8(M) Junction 8 on-slip Westbound.

M8 Junction 8 on-slip - Total closure

Location:A8 (Bailleston Rbt to Entry A8 Eb) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Eastbound

Start time:5th of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 Eastbound to M8 Merge Junction 6

M8 WB J15 on slip from Springburn Expressway - Slip Closure

Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (M8 Overbridge to Entry M8 Wb), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A803 - at jct turn right onto Castle St - continue Alexandria Parade- turn left onto Alexandria Park St - join M8 WB at J14 end

M8 WB Jct 13 to Jct 15 - Lane 1 & 2 Closure

Location:M8 (On Slip From M80 to Jct 14 Off Slip) to M8 (On Slip Jct 14 to Off Slip Jct 15), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 14 onslip from Viewpark - Slip Closure

Location:M8 (New Park Avenue to Entry M8 Wb) to M8 (On Slip From M80 to Jct 14 Off Slip), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue viewpark ave/ Alexandria park st- turn left onto Alexandria parade- at jct turn left onto A80 cumbernauld road- rejoin M8 at jct 12 on slip- end

M8 WB Jct 15 to Jct 18 offside and adjacent - Lane Closures

Location:M8 (M8 Overbridge to Entry M8 Wb) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 17 offslip - Slip Closure

Location:M8 (Start Slip To M8 to Entry M8 Wb), Westbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave m8 at jct 19 for Argyle st-8 turn right at jct onto Argyle st- turn right at jct onto North street- follow to Charing cross- end

M8 WB Jct 21 to Jct 22 Lane 3 & 4 Closure

Location:M74 (Start Ded. Lane to M8 & M77 Split) to M74 (M8 & M77 Split to End Of M74), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 21 onslip from Carnoustie St on slip - Slip Closure

Location:M74 (Carnoustie St Crossroads to Entry M8 Slip), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
North diversion; follow Carnoustie st- at Jct turn left onto Paisley Rd- turn left onto Seaward st-re Join M8 west- end.
South diversion; follow Carnoustie- at Jct turn right onto Scotland st- rejoin M8 west- end

M8 WB Junction 25 Off Slip To Fifty Pitches Road- Slip Closure

Location:M8 (Jct 25 Off Slip to A739 Rbt), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow M8 west- leave at jct 27- at rbt take 4th exit and follow signs for M8 east- join m8 east- leave m8 at jct 25- end

M8 WB Between Jct 30 & 31 - Lane closure

Location:M8 (Slip From M898 to Slip Off To Ferry Int), Westbound

Start time:19th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 WB J11 off slip - Slip Closure

Location:M8 (Start Wb Off Slip Junction 11 to End Wb Off Slip Junction 11), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave M8 jct 15 castle st- turn right at jct- return M8 Jct 15 east- leave M8 jct 11- end

M8 WB J11 on slip - Slip Closure

Location:M8 (Start Wb On Slip Junction 11 to End Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on B765 - join M8 EB J11 - leave M8 J10 Auchinlea Way - turn right onto Westerhouse Rbt - rejoin M8 WB- end

M8 WB J12 off slip - Slip Closure

Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (2 Way Slip to Cumbanauld Rd Jct), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave M8 jct 15 castle st- turn right at jct- return M8 Jct 15 east- leave M8 jct 12- end

M8 WB J12 on slip - Slip Closure

Location:M8 (Cumbanauld Rd to 2 Way Slip) to M8 (Jct 12 Off Slip to Jct 12 Entry Slip), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A80 cumbernauld road- at jct turn right Alexandra parade- turn right onto Alexandra park st- rejoin M8 west at jct 14- end

M8 WB J12 to J13 - Lane Closure

Location:M8 (Jct 12 Wb On Slip to Off Slip To M80) to M8 (Off Slip To M80 to Entry Slip From M80), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB J13 off slip - Slip Closure

Location:M8 (Off Slip To M80 to Entry Slip From M80) to M8 (Start M8 Slip to End Slip), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave M8 jct 15 castle st- turn right at jct- turn right onto Royston rd- at rbt take 1st exit onto blochairn rd- at rbt take 2nd exit provan rd- end

M8 WB J15 to J16 - Lane Closure

Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (Jct 16 Wb Off Slip to Slip To Craighall Rd), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB J16 off slip - Lane closure

Location:M8 (Jct 16 Wb Off Slip to Slip To Craighall Rd) to M8 (Off Slip M8 Wb to Canal Rd Jct), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB J19 Anderston Offslip - Lane Closures

Location:M8 (Jct 19 Off Slip to Jct 19 On Slip), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M8 WB J29 off slip to St James IC - Slip Closure

Location:M8 (Slip Off M8 Wb to A737 Rbt), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave M8 jct 30 to M898- leave M898 to spectacles- at rbt take 3rd exit- at rbt take 2nd exit onto M898 north- rejoin M8 east- leave M8 at jct 29- end

M8 WB J29 on slip St James IC - Slip Closure

Location:M8 (A737 Rbt to M8 Wb From St A737), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on St James Rbt - take 2nd exit for M8 east - leave M8 at J27- at rbt take 1st exit Renfrew Rd - at take rbt 3rd exit onto M8 west- end

M8 WB Jct 10 - 14 Moble Lane Closures

Location:M8 (Wb Off Slip Junction 10 to Wb On Slip Junction 10) to M8 (Off Slip To M80 to Entry Slip From M80

Start time:15th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

M8 WB Jct 15 offslip to Stirling Road - Slip Closure

Location:M8 (Jct 15 Off Slip to Stirling Rd Jct), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave m8 at jct 16- turn right at jct and rejoin M8 east- tale lane 4 and leave M8 at jct 15 off slip to A803 south- end

M8 WB Jct 15 on slip from Stirling Rd - Slip Closure

Location:M8 (A803 Exit to Entry Wb M8) to M8 (Entry M8 Wb to Jct 16 Off Slip), Westbound

Start time:17th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A803 north- leave A803 for A804- turn left onto royston rd- turn left onto A803 south- rejoin M8 at jct 15 lane onslip- end

M8 WB Jct 19 Newton St on slip - Total Closure

Location:M8 (Jct 19 Off Slip to Jct 19 On Slip) to M8 (Slip On M8 Wb to M8 Eb Entry), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
A804 – Anderston Quay – Broomielaw – A77 Glasgow Bridge – Nelson St - Morrison St. – Paisley Rd West – Berryknows Rd – M8 Jct 25 WB on slip – Diversion End

M8 WB Jct 19 Stobbcross on slip - Total Closure

Location:M8 (A814 Exit to Entry M8 Wb), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
A804 - Broomielaw - Morrison St. – Paisley Rd West – Berryknows Rd – M8 Jct 25 WB on slip – Diversion End

M8 WB Jct 19 Waterloo St on slip - Total Closure

Location:M8 (Bishop Lane to Entry M8 Wb) to M8 (Slip On M8 Wb to M8 Eb Entry), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Douglass St - St Vincent Street - A804 - Broomielaw - Morrison St. – Paisley Rd West – Berryknows Rd – M8 Jct 25 WB on slip – Diversion End

M8 WB Jct 20 to Jct 23 - Total Closure

Location:M8 (On Slip Jct 19 to Off Slip Jct 20) to M8 (Jct 23 Off Slip to A8 O'Bridge), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 WB Mainline:

M8 Jct 20 WB off slip to West St. – Morrison St. – Paisley Rd West – Berryknows Rd – M8 Jct 25 WB on slip – Diversion end

M8 WB Jct 22 - HS Closure

Location:M8 (M77 Int Off Slip to M77 Int On Slip), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Hard Shoulder Closure.

M8 WB Jct 22 Seward Street- Slip Closure

Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance, Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
circle Rbt and take 2nd exit onto Scotland st- turn left onto Carnoustie st- rejoin M8 sec c/way east - end

M8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure

Location:M74 (M8 & M77 Split to End Of M74) to M77 (Off Slip From M8 Wb to Entry To M77 Sb), Westbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching, Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 22 off slip to M77 - Total Closure

Location:M77 (Off Slip From M8 Wb to Entry To M77 Sb), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
M8 Jct 20 off slip to West St. – Morrison St. – Paisley Rd West – Dumbrek Rd - M77 Jct 1 SB on slip - Diversion End

M8 WB Jct 23 offslip to Dumbreck Road - Slip Closure

Location:M8 (Jct 23 Off Slip to B768 Dumbrek Rd), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue onto M77 south- leave M77 at jct 1- at jct turn right onto dumbreck rd- end

M8 WB Jct 24 - 25 - Lane Closure

Location:M8 (Jct 24 Slip Rd Entry to Jct 25 Off Slip) to M8 (Wb Jct 25 Off Slip to Wb Jct 25 On Slip), Westbo

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 24 Offslip to Helen Street - Slip Closure

Location:M8 (Wb Jct 24 Off Slip to Helen St Jct), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave m8 at jct 26- circle rbt and rejoin m8 east- follow m8 east- leave m8 at jct 24- end

M8 WB Jct 24 on slip from Helen Street -Slip Closure

Location:M8 (Wb Jct 24 Off Slip to Wb Jct 24 On Slip) to M8 (Jct 24 Slip Rd Entry to Jct 25 Off Slip), Westbo

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow Helen St- At rbt take 1st exit onto Edmiston Dr- at rbt take 2nd exit onto Shieldhall rd- at Rbt take 1st exit onto Renfrew Rd- at Rbt take 1st exit onto Hillington road- end

M8 WB Jct 25 to Jct 26 on slip - Lane Closure

Location:M8 (Wb Jct 25 Off Slip to Wb Jct 25 On Slip) to M8 (Mid Point H.Int Bridges to Slip From Hillington

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 26 - 29 Mobile Lane Closures

Location:M8 (Wb Off Slip to Mid Point Hillington Int Bridges) to M8 (Mid Point A737 Bridges to Entry Slip), W

Start time:15th of May 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures.

M8 WB Jct 26 Offslip - No Obstruction footway or carriageway

Location:M8 (Jct 25 Wb On Slip to Jct 26 Off Slip) to M8 (Slip Off M8 Wb to Hillington Int Rbt), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
No Obstruction on Carriageway or Footway.

M8 WB Jct 26 on slip from Hillington IC - Slip Closure

Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue onto Hillington road- at roundabout take 1st exit onto Glasgow rd- rbt 2nd exit onto Glebe st- jct turn left onto A741 Paisley rd- rbt take 2nd exit- end

M8 WB Jct 29 St James IC HS Closure

Location:M8 (Slip Off Wb M8 to Mid Point A737 Bridges) to M8 (Mid Point A737 Bridges to Entry Slip), Westboun

Start time:13th of May 2024, 9:30am

Description:Works:
Grass Cutting

Traffic Management:
Hard Shoulder Closure.

M8 WB Jct 30 - 31 Lane Closures

Location:M8 (Slip From M898 to Slip Off To Ferry Int), Westbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 WB Jct 30 off slip Slip Closure

Location:M8 (Slip Off M8 Wb to Greenock Rd O'Bridge), Westbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 west- leave M8 at jct 31- take 4th exit onto M8 east- leave M8 at jct 30- end

M8 WB Jct 31 Westferry Offslip - Closure

Location:M8 (Slip From M8 Wb to A8 Rbt), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow A8 to Langbank rbt- take 3rd exit onto A8 east- leave A8 at westferry- end

M8 WB M74 Jct 1 - 22 Sec Cway - Closure

Location:M74 (M8 & M77 Split to End Of M74) to M8 (Wb Jct 24 Off Slip to Wb Jct 24 On Slip), Westbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
Continue onto M77 south- leave M77 Jct 1- at Jct turn right onto Dumbeck rd- at Jct turn left onto Paisley Rd- at Rbt take 2nd exit onto Helen st- rejoin M8 west Jct 24- end.

M8 WB Sec C/way - Carnoustie st to M77 on slip - Lane Closure

Location:M74 (Start Ded. Lane to M8 & M77 Split), Westbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 WB onslip from J31 - Lane Closure

Location:A8 (West Ferry Toll Rbt to Slip On To A8), Westbound

Start time:10th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 Westbound Junction 6 Newhouse Main line - Total closure

Location:M8 (Duntilland Road to End Of Se Unit) to M8 (Railway Bridge to End Of M8), Westbound

Start time:3rd of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
A8 Junction 6 Westbound, A8 Westbound, Bargeddie Rbt, A8(M) Junction 8 on-slip

M8 Westbound Junction 6A on-slip - Total Closure

Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip) to A8 (Chapelhall Overbridge to Eurocentra

Start time:3rd of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Chapelhall South rbt, A8 Westbound, bargeddie Rbt, A8(M) Junction 8 on-slip Westbound

M8 Westbound Junction 6A to Junction 8 - Progressive lane clsoures

Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip) to M8 (Start M8 Bailleston to Railway Unde

Start time:2nd of June 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M8 Westbound Junction 8 Baillieston off-slip - Total closure

Location:A8 (Bargeddie Underbridge to Baillieston Off Slip) to A8 (Slip Rd Off A8 Wb to Bailleston Rbt), West

Start time:27th of May 2024, 8:00pm

Description:Works:
Lighting Works

Traffic Management:
Road Closure.

Diversion Information:
M8 WB Junction 10 Off-slip, M8 EB Junction 10 On-slip.

M8 Westbound Junction 8 off-slip - Total closure

Location:A8 (Bargeddie Underbridge to Baillieston Off Slip) to A8 (Slip Rd Off A8 Wb to Bailleston Rbt), West

Start time:12th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M8 WB Junction 10 Off-slip, M8 EB Junction 10 On-slip.

M8 Westbound to A725 Southbound link road - Total closure

Location:A8 (Orchard Farm Access to Shawhead Overbridge) to A725 (Start 2 Lane to Diamond Int. O/B), Westboun

Start time:30th of May 2024, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M8 Westbound, M8 Westbound Junction 8 off-slip, M73 Southbound junction 2 on-slip, M73 to M73 Southbound link road, M74 Southbound.

M8 Woodside - M8 EB Jct 18 (Charing X) On Slip Closure

Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Eb On Slip to Entry From A82), Eastbound

Start time:26th of May 2024, 10:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Traffic diverted to NB St Georges Rd to then join Mainline diversion to Jct 16 (Craighall)

No LEZ cameras affected by the diversion.

M8 Woodside - M8 EB Jct 18 to 16 - Road Closure

Location:M8 (Start Slip To M8 to Entry M8 Wb) to M8 (Jct 16 On Slip to Jct 15 Off Slip), Eastbound

Start time:26th of May 2024, 10:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
M8 EB traffic taken off at Jct 18 (St Georges Rd)/NB St gEorges Rd/SB Garscube Rd/EB Dobbie's Loan and back on again at Jct 16 (Craighall).

No LEZ Camera's affected by the diversion.

M8 Woodside - M8 EB Jct 19 (Anderston) On Slip Closure

Location:M8 (Slip Off M8 Eb to Bothwell St) to M8 (Eb Jct 19 Off Slip to Eb Jct 19 On Slip), Eastbound

Start time:26th of May 2024, 10:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Traffic diverted NB North St/NB St Georges Rd to join mainline diversion to JCT 16 (Craighall).

No LEZ camera's affected by the diversion.

M8/A8(M) Baillieston roundabout inner ring closure & approaches

Location:A8 (Baillieston Int Rbt to Baillieston Int Rbt) to M8 (Railway Bridge to End Of M8), Eastbound

Start time:19th of May 2024, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M8/A804 North St St Georges Rd EB to M8 J18 EB onslip - Closure

Location:M8 (Sauchiehall Jct to Entry M8 Eb), Northbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Continue on A804 St Georges road- right onto A81 Garscube road - right onto A804 Dobbie loan road - Take the M8 J16 EB onslip at Craighall road - diversion ends

M8/A804 North Street to Woodlands Rd at Charing x Footbridge - Total Closure

Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Sauchiehall St to M8 Split), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Lane Closure.

Diversion Information:
Left onto Sauchiehall St - left onto Rose St - Right onto Renfrew St - left onto Hope St - left on to Cowcaddens road - join A81 Garscube road- left on St Georges road - Diversion ends

M8/A804 St Georges Road WB to A804 Newton St - Lane closure

Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westbound

Start time:20th of May 2024, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Lane Closure.

M8/A804 WB St Georges Road at Charing X FB - Lane closure

Location:M8 (Woodlands Rd O'Bridge to Entry M8 Eb) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Lane Closure.

M8/A814 Argyle St WB - Lane Closures

Location:M8 (A814 Exit to Entry M8 Wb) to M8 (Jct 19 Off Slip Split to Stobcross St), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M8/A814 Argyle St WB CLOSURE

Location:M8 (Jct 19 Off Slip Split to Stobcross St) to M8 (Slip Off To A814 to Jct 19 Off Slip), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
LEFT onto Newton St, RIGHT onto Broomielaw, RIGHT onto NOrth St and rejoin A814 - end

M8/A814 Argyle St WB CLOSURE

Location:M8 (Jct 19 Off Slip Split to Stobcross St) to M8 (Slip Off To A814 to Jct 19 Off Slip), Westbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

M8/A814 Clydeside Expressway EB - Lane Closures

Location:M8 (A814 Exit to Entry M8 Wb), Eastbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M80 - NB - Jct 8 - 9 - Hard Shoulder Closure

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br

Start time:3rd of June 2024, 6:01am

Description:Works:
Drainage Works

Traffic Management:
Hard Shoulder Closure (50mph)

M80 - NB - Jct 8 - 9 - Lane Closure

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br

Start time:26th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure (50mph)

M80 - NB - Jct 8 - 9 - Lane Closure

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br

Start time:3rd of June 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure (50mph)

M80 - NB - Jct 8 to 9 - Closure

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br

Start time:26th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
SB Diversion to M876 Jct 3 (Bowtrees Roundabout) to M876 SB to rejoin at M80 Jct 8 Bankhead

NB Diversion to M876 jct 3 Bowtrees to M9 Northbound to Jct 9 Pirnhall

M80 - NB - Jct 8 to 9 - Closure

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Nb Off Slip To A872 to A872 Rbt), North

Start time:26th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
SB Diversion to M876 Jct 3 (Bowtrees Roundabout) to M876 SB to rejoin at M80 Jct 8 Bankhead

NB Diversion to M876 jct 3 Bowtrees to M9 Northbound to Jct 9 Pirnhall

M80 - SB - Jct 9 - 8 - Hard Shoulder Closure

Location:M80 (Foot Green O'Bridge to Northfield Underpass) to M80 (Dunipace O'Bridge to Slip Off To M876), So

Start time:10th of June 2024, 6:01am

Description:Works:
Drainage Works

Traffic Management:
Hard Shoulder Closure (50mph)

M80 - SB - Jct 9 - 8 - Lane Closure

Location:M80 (Foot Green O'Bridge to Northfield Underpass) to M80 (Dunipace O'Bridge to Slip Off To M876), So

Start time:26th of May 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure (50mph)

M80 - SB - Jct 9 - 8 - Lane Closure

Location:M80 (Foot Green O'Bridge to Northfield Underpass) to M80 (Dunipace O'Bridge to Slip Off To M876), So

Start time:10th of June 2024, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure (50mph)

M80 - SB - Jct 9 to 8 - Closure

Location:M80 (Foot Green O'Bridge to Northfield Underpass) to M80 (Dunipace O'Bridge to Slip Off To M876), So

Start time:26th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
SB Diversion to M876 Jct 3 (Bowtrees Roundabout) to M876 SB to rejoin at M80 Jct 8 Bankhead

NB Diversion to M876 jct 3 Bowtrees to M9 Northbound to Jct 9 Pirnhall

M80 - SB -Jct 9 to 8 - Closure

Location:M80 (A872 Rbt to Slip Entry From A872) to M80 (Dunipace O'Bridge to Slip Off To M876), Southbound

Start time:26th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
SB Diversion to M876 Jct 3 (Bowtrees Roundabout) to M876 SB to rejoin at M80 Jct 8 Bankhead

NB Diversion to M876 jct 3 Bowtrees to M9 Northbound to Jct 9 Pirnhall

M80 NB J2 on slip - Slip Closure

Location:M80 (B765 Rbt (N) to M80 Nb Slip Entry), Northbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue B765 - join M80 SB J2 - leave M80 SB at J1 - at rbt take 2nd exit - at jct turn right onto Provan Road - at mini rbt take 2nd exit onto M80 NB J1 onslip - end

M80 NB Jct 1 on slip from Blochairn Road - Slip Closure

Location:M80 (Blochairn Road to Slip Rd Entry M80 Nb) to M80 (M80 Nb Slip Entry to Slip Off To B765), Northbo

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
at rbt follow provan rd- turn left and join M8 east at jct 13- continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto royston road- at rbt take 2nd exit onto B765 robroyston rd- at rbt take 4th exit onto B765- at rbt take 2nd exit onto M80 north- end

M80 NB Jct 2 offslip to Robroyston Link Road - Slip Closure

Location:M80 (Slip Off To B765 to South Extent Of M80 Dbfo) to M80 (Slip Off M80 Nb to B765 Rbt (N)), Northbo

Start time:16th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto royston road- at rbt take 2nd exit onto B765 robroyston rd- at rbt take 4th exit onto B765- end

M80 Robroyston Rd SB - Lane closure

Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

M80 SB Jct 1 - Lane Closure

Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M80 SB J1 off slip - Slip Closure

Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb) to M80 (Slip Off M80 Sb to Maxwelton Rbt), Southbou

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M80 onto M8 WB - leave M8 J15 Castle St - turn right onto Castle St - turn right onto M8 EB J15 - leave M8 at J14 - turn right onto Alexandria Park St - turn left onto Alexandra Parade - turn left onto A80 - turn left onto Provan Road - end

M80 SB J2 off slip - Slip Closure

Location:M80 (Slip Off From M80 Sb to B765 Rbt (S)), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M80 SB - leave M80 J1 - Rbt take 2nd exit - at Jct turn right onto Provan Rd - at mini Bbt take 2nd exit onto M80 NB J1 on slip - leave M80 NB J2 - end

M80 SB J2 on slip - Slip Closure

Location:M80 (B765 Rbt (S) to Entry M80 Sb) to M80 (Slip Entry From B765 to Slip Rd Off M80 Sb), Southbound

Start time:15th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on B765 - rbt 1st exit - rbt 1st exit - rbt 1st exit onto Robroyston Rd - jct turn right onto A80, Cumbernauld Rd - follow signs for M8 east/west - end

M80 SB Jct 1 Link Road to M8 WB - Closure

Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb) to M8 (On Slip From M80 to Jct 14 Off Slip), Southb

Start time:13th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M80 jct 1- at rbt take 2nd exit and join M8 east jct 13- leave m8 east at jct 12- at jct turn right on A80- cross bridge and rejoin M8 at jct 12 west-end

M876 - EB - After m80 split - Lane closure

Location:M876 (M876 Jct Bankhead to River Carron O'Br), Eastbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure (50mph)

M898 EB off slip to M8 Jct 30 Slip Closure

Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Eastbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on M8 west- leave M8 at jct 31- take 4th exit onto M8 east- end

M898 NB off slip to A726 - Slip Closure

Location:M898 (Craigend O'Bridge to A726 Rbt) to M898 (Slip Off From M898 Sb to A726 Rbt), Northbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A898 north- leave A898 and join A82 SB - leave A82 at Mountblow Road- turn right and join A82 north - turn left onto A898 Erskine Br- leave A898 at Spectacles off slip - end

M898 NB Craigton IC to Erskine Bridge - Lane Closure

Location:M8 (Slip Off M8 Wb to Greenock Rd O'Bridge) to A898 (M898 to Start Of Cycle Way), Northbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M898 NB Spectacles on slip - Slip Closure

Location:A898 (A726 Rbt to On Slip To A898) to A898 (M898 to Start Of Cycle Way), Northbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
circle rbt and stay on A726- at rbt take 1st exit- at Barholm Rbt take 2nd exit- at Centreholm Rbt take 2nd exit- at Southholm Rbt take 2nd exit- at Red Smiddy Rbt take 1st exit onto Greenock Rd- at rbt take 1st exit Greenock Rd at jct turn left onto Inchinnan Rd- at rbt take 2nd exit- at jct go straight ahead onto Glebe St- at rbt take 2nd exit for Glasgow Rd- at rbt take 2nd exit for Renfrew Rd- at rbt take 2nd exit on Shieldhall Rd- at rbt take 1st exit onto A739 Clyde Tunnel- continue onto Crow Rd- take left onto A82 Great Western Rd- at rbt take 2nd exit- at Kilbowie Rbt take 3rd exit- end

M898 SB onslip from A726 Slip Closure

Location:M898 (A726 Rbt to Entry M898 Nb) to M898 (On Slip From A726 to Off Slip To M8), Southbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on A726- join A898 Erskine br north- leave A898 to A82 south Great western rd- leave A82 south onto Mountblow Rd- turn right onto A82 north- turn left onto A898 south- end

M898 SB A726 off slip safety coning

Location:A898 (End Of Cycle Way to M898) to A898 (A898 Off Slip to A726 Roundabout), Southbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
No Obstruction on Carriageway or Footway.

M898 SB Old toll to Jct 30 slips - lane closure

Location:A898 (End Of Cycle Way to M898) to M898 (On Slip From A726 to Off Slip To M8), Southbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M898 SB On slip from A726 Total Closure

Location:M898 (A726 Rbt to Entry M898 Nb) to M898 (On Slip From A726 to Off Slip To M8), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A898 - A726 - Souithbar Rd - Greenock Rd - Join M8 EB Jct 29a On slip - EB Traffic exit Jct 29 turn - Join M8 EB Jct 29 On slip

M898 SB to M8 EB Jct 30 Total Closure

Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Southbound

Start time:27th of May 2024, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Exit to Spectacles A898 - A726 - Southbar Rd - Greenock Rd - Join M8 EB Jct 29a On slip – End

M898 WB off slip to M8 Jct 31 Slip Closure

Location:M8 (Greenock Road Bridge to Entry M8 Wb) to M8 (Slip From M898 to Slip Off To Ferry Int), Westbound

Start time:24th of May 2024, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue on M8 east- leave M8 at jct 29- take 5th exit onto M8 west- end

M9 - NB - Newbridge Roundabout Jct 1 to Kier Roundabout jct 11- Mobile Lane Closure

Location:M9 (Start Of Newbridge Nb Off Slip to End On Slip From Newbridge Rbt) to M9 (C34 O'Bridge Knockhill

Start time:1st of June 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

M9 - NB - JCT 10- 11 - Lane closure

Location:M9 (A84 O'Bridge Craigforth to C34 O'Bridge Knockhill) to M9 (C34 O'Bridge Knockhill to Keir Rbt), N

Start time:10th of June 2024, 8:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

M9 - SB - Jct 1 - Closure

Location:M9 (End Of 4 Lane Eb to 2 Lane Dual), Southbound

Start time:13th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Follow signs to come off at Juction 1 Newbridge off slip and take second exit at the roundabout to rejoin carriageway M9 Jct 1 on slip

M9 - SB - Jct 9 - 8 - Hard shoulder closure

Location:M9 (E Side A9 O'Bridge to Plean Mill Rd O'Bridge), Southbound

Start time:12th of May 2024, 7:00pm

Description:Works:
Barrier Repair

Traffic Management:
Hard Shoulder Closure.

M9 -SB - Kier Roundabout jct 11 to Newbridge Roundabout Jct 1- Mobile Lane Closure

Location:M9 (Keir Rbt to C34 O'Bridge Knockhill) to M9 (End Of 4 Lane Eb to 2 Lane Dual), Southbound

Start time:1st of June 2024, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Mobile Lane Closures (50mph)

M90 - NB - 1a to 1b - lane closure

Location:Off Network to A90 (Frb to Ferrytoll Jn Ub), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Gully Emptying

Traffic Management:
Mobile Lane Closures (50mph)

M90 - SB - 1a to 1b - Lane closure

Location:A90 (Frb to Ferrytoll Jn Ub) to Off Network, Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Gully Emptying

Traffic Management:
Mobile Lane Closures (50mph)

M90 Blairadam, Kelty- Lane Closure N/B

Location:M90 (P&Kc/Fc Bdy to Start Concrete Sect), Northbound

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections: Infrastructure / Assets

Traffic Management:
Lane Closure.

M90 Blairadam, Kelty- Lane Closure S/B

Location:M90 (End Concrete Section Sb to P&Kc/Fc Bdy), Southbound

Start time:13th of May 2024, 9:30am

Description:Works:
Inspections: Infrastructure / Assets

Traffic Management:
Lane Closure.

M90 Bridge of Earn, J9 - S/B Lane and hard shoulder closure

Location:M90 (Entry Slip From A912 to Glenfarg Overbridge), Southbound

Start time:1st of June 2024, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Bridge of Earn, J9 S/B on slip - Slip closure

Location:M90 (A912 Jct to Start Entry Slip From A912) to M90 (Entry Slip From A912 to Glenfarg Overbridge), S

Start time:1st of June 2024, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

M90 Craigend EB Slip to M90 SB Jct 10- Slip Closure

Location:M90 (Connecting Road From M90 Eb to Sb M90 Int Br) to M90 (Slip Start to Entry M90), Southbound

Start time:28th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Take EB Slip road (which runs under A912) Jct 11 for M90 Barnhill NB. Back onto M90 SB

M90 Craigend EB on Slip to M90 NB at Friarton - Slip Closure

Location:M90 (Off Slip to A912 O'Br) to M90 (A912 O'Bridge to M90 Entry Slip), Eastbound

Start time:27th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Divert Onto M90 SB to Jct 9. Return to M90 NB

M90 Gairneybank NB - Lane closure

Location:M90 (Entry Slip From B9097 to Off Slip To A977 Rbt), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

M90 Glenfarg - N/B Lane 2 closure

Location:M90 (End Concrete Nb to Glenfarg Overbridge), Northbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Glenfarg - S/B Lane 2 closure

Location:M90 (Glenfarg Overbridge to Start Concrete Sb), Southbound

Start time:16th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Glenfarg NB - Lane closure

Location:M90 (End Concrete Nb to Glenfarg Overbridge) to M90 (Glenfarg Overbridge to Start Off Slip To A912),

Start time:27th of May 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure.

M90 J4-3 - S/B Lane 1 closure

Location:M90 (S/B On Slip From A909 to Dalbeath O'Bridge), Southbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Jcn 3-8-MLC S/B

Location:M90 (S/B Off Slip To A92 to Mid Point Bridges) to M90 (Entry Slip From A91 to Off Slip To A91), Nort

Start time:14th of May 2024, 9:30am

Description:Works:
Traffic Management Training

Traffic Management:
Mobile Lane Closures.

M90 Jct 10 Off Slip NB - Full Slip Closure

Location:M90 (On Slip From A912 to Off Slip To M90 Interchange) to M90 (Off Slip M90 Int to Start Slip A912),

Start time:31st of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
For all traffic heading into Perth or to Broxden diversion is M90 NB to Barnhill to M90 SB then onto Jct 10 SB Slip to Broxden. Traffic for Perth will then take the A93 Glasgow Road.

M90 Jct 10 SB Off Slip to Broxden - Slip Closure

Location:M90 (Off Slip to M90 Interchange Bridges) to M90 (Off Slip to Nb M90 Int Bridge), Southbound

Start time:30th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Continue on M90 SB to Jct 9. Return to M90 NB Jct 10 Craigend to Broxden

M90 Jct 10 on Slip from A912 Perth - Slip Closure

Location:M90 (Off Slip From A912 to Start Entry Slip) to M90 (Slip Start to Entry M90), Southbound

Start time:29th of May 2024, 7:30pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Continue on A912 Bridge of Earn. Re-join M90 at Jct 9

M90 Jct 10 to Jct 9 SB - Lane Closure

Location:M90 (Entry Slip From M90 Int to Off Slip To A912), Southbound

Start time:20th of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct 11 to 10 SB - Lane Closure

Location:M90 (On Slip From A90 to Scconieburn O'Bridge), Southbound

Start time:20th of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct 4 to Jct 5 NB - Lane Closure

Location:M90 (P&Kc/Fc Bdy to Start Concrete Sect) to M90 (Start Concrete Sect to Off Slip To B9097), Northbou

Start time:21st of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct 5 to Jct 6 NB - Lane Closure

Location:M90 (Entry Slip From B9097 to Off Slip To A977 Rbt), Northbound

Start time:21st of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct 6 to Jct 5 SB - Lane Closure

Location:M90 (Entry Slip From A977 to Off Slip B9097 S/B), Southbound

Start time:21st of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct 8 - N/B Lane 2 closure

Location:M90 (Off Slip To A91 to End Concrete Nb) to M90 (End Concrete Nb to Glenfarg Overbridge), Northbound

Start time:13th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Jct 8 - S/B Lane 2 closure

Location:M90 (Glenfarg Overbridge to Start Concrete Sb) to M90 (Start Concrete Sb to Slip From A91), Southbou

Start time:13th of May 2024, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Jct 9 to Jct 10 NB - Lane Closure

Location:M90 (On Slip From A912 to Off Slip To M90 Interchange), Northbound

Start time:20th of May 2024, 7:30pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M90 Jct4 to Jct 5 NB - Vergeworks

Location:M90 (N/B On Slip From A909 to P&K/Fc Bdy) to M90 (P&Kc/Fc Bdy to Start Concrete Sect), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
No Obstruction on Carriageway or Footway.

M90 Junction 6 Kinross On-Slip NB - Lane closure

Location:M90 (A977 Rbt to Entry Slip From A977), Northbound

Start time:20th of May 2024, 9:30am

Description:Works:
Boundary Fence Repairs

Traffic Management:
Lane Closure.

M90 Kinross Lane Closure N/B

Location:M90 (Entry Slip From B9097 to Off Slip To A977 Rbt), Northbound

Start time:17th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M90 Mawcarse- Lane closure S/B

Location:M90 (Glenfarg Overbridge to Start Concrete Sb), Southbound

Start time:17th of May 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M90 N/B Gairneybank, Kinross - Lane 1 Closure

Location:M90 (Entry Slip From B9097 to Off Slip To A977 Rbt), Northbound

Start time:22nd of May 2024, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Lane Closure (50mph)

M90 N/B Jct 1C. Road Closure

Location:M90 (Slip Off To A985 to Slip On From A985) to M90 (N/B On Slip M828 to S0s Telephone W4), Northboun

Start time:3rd of June 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
Exit M90 NB at junction 1C NB off-slip. Take 2nd exit to M90 junction 1C NB on-slip continue onto A823(M) WB to Pitreavie Roundabout. Take 4th exit onto A823(M) EB then continue onto M90 Jct 2 NB on-slip.

M90 N/B Jct 3. Lane Closure.

Location:M90 (Jct N/B Off Slip to Mid Point Bridges) to M90 (N/B On Slip A92 Halbeath to Dalbeath O'Br), Nort

Start time:30th of May 2024, 8:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure (50mph)

M90 North of Craigend- Lane Closure- S/B

Location:M90 (A9 Broxden Rbt to Off Slip To M90 Int), Southbound

Start time:16th of May 2024, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M90 Rhynd NB - Lane closure

Location:M90 (On Slip From A912 to Off Slip To M90 Interchange), Northbound

Start time:15th of May 2024, 9:30am

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M90 Rhynd SB - Lane closure

Location:M90 (Entry Slip From M90 Int to Off Slip To A912), Southbound

Start time:15th of May 2024, 9:30am

Description:Works:
Inspections: Structures

Traffic Management:
Lane Closure.

M90 S/B Jct 1C. Closure

Location:M90 (M823 O'Bridge to Slip Entry From A921) to A90 (Frb to Ferrytoll Jn Ub), Southbound

Start time:14th of May 2024, 8:00pm

Description:Works:
Painting Works

Traffic Management:
Road Closure.

Diversion Information:
Exit M90 at Jct 1C S/B and rejoin M90 S/B in dedicated lane to Jct 1B. Then exit at Jct 1B and back on at Jct 1B on-slip to main M90.

M90 S/B Jct 2. Road Closure.

Location:M90 (M823 O'Bridge to Mastertown O'Bridge) to M90 (S/B Off Slip To A985 to S/B On Slip From A985), S

Start time:3rd of June 2024, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
Exit M90 mainline at Jct 2 SB off-slip, follow A823(M) WB to Pitreavie Roundabout. Take 1st exit onto B980 Kings Rd. Follow Kings Rd SB to Castle Rd roundabout and take 1st exit onto A985 EB Admiralty Rd until Admiralty Roundabout. Take the 3rd exit onto M90 SB Jct 1C on-slip.